Design Stage Fee Split Tool by Avenir Developments
The free Design Stage Fee Split Tool by Avenir Developments follows RIBA and AIA Plan of Work standards.
Design Stage Fee Split — AIA / RIBA Plan of Work
Split a total architectural fee across project stages using AIA phases or RIBA Plan of Work defaults. Enter a lump-sum fee or a % of construction cost, tweak stage percentages, then click CALCULATE to get per-stage amounts, CSV export and a WhatsApp summary. All values are editable and suitable for Pakistan and international use.
Basics
Stages & Percentages
What the defaults mean
AIA defaults (editable): Programming 5%, Schematic Design 15%, Design Development 20%, Construction Documents 40%, Bidding/Negotiation 5%, Construction Administration 15%.
RIBA defaults (editable): Stage 0 (2%), 1 (8%), 2 (15%), 3 (25%), 4 (30%), 5 (15%), 6 (5%), 7 (0%). Real projects vary: adjust to your scope, procurement route and client agreement.
Multipliers help reflect complexity/BIM level/interiors/LEED. Taxes (if any) are shown separately.
GET YOUR PERSONAL PROJECT PLAN IN MINUTES
Contact Avenir Developments for our House Design Services
- Architecture Services
- Interior Design Services
- Construction Services
- Design + Build Services