Discover luxury architecture, interior design and construction in Islamabad and Rawalpindi. From DHA to Gulberg, we create elegant homes and commercial spaces that honor the capital’s heritage while embracing modern innovation.

Avenir Developments is happy to provide its top-notch architecture, interior design, and construction services to both Islamabad and Rawalpindi. We are introducing our signature style of luxury, innovation, and integrated design-build solutions to these lively marketplaces. Avenir Developments is a well-known name in high-end architecture and construction.

Architects and Construction Company in Islamabad

Avenir Developments designs and builds houses and commercial buildings in Islamabad and Rawalpindi, run from a studio in Gulberg Greens. One team takes a plot from its first drawing, through approval by whichever authority governs it, to handover.

In the twin cities the rules change with the authority, and the authority can change at a boundary most owners never see. So every regulatory figure on this page carries the clause it comes from.

  • 5 Marla to 2 KanalHouses, plus farmhouses and commercial buildings
  • Construction on siteAvenir builds in Islamabad and Rawalpindi as well as designing there
  • Owners abroadApproval and construction run on documents you can review from anywhere

What Avenir delivers in Islamabad

Four services, all run from the Gulberg Greens studio and all delivered on site in Islamabad and Rawalpindi. You can appoint Avenir for one of them, or for the whole sequence under a single contract.

Architecture and approval drawings

Survey and concept design first, then the full submission set for whichever authority governs the plot, with structure and MEP coordinated before any drawing is issued so clashes get caught on paper.

Architecture services

Construction

Grey structure and finishing, built from working drawings and a scheduled specification. Every stage inspection the regulations require is recorded. The price comes from drawings and a bill of quantities, never from a phone call.

Construction services

Design + Build

One contract from first drawing to handover. It closes the gap between an architect's drawings and a contractor's site, which is where coordination errors start, along with the argument over who pays for them.

Design + Build

Interior design

Layouts, joinery, lighting and a line-by-line schedule of finishes, drawn alongside the architecture so a ceiling detail never has to fight a beam.

Interior design

Islamabad at a glance

Five questions decide what you can build, and what it costs

Who approves the plot, what the byelaws cap, how long sanction takes, what the build costs, and who you appoint to run it. The short answers are below, each with the clause or the page that carries the detail. The rest of the page takes each one in turn, from the approving authority to the contract.

  • Authority

    Five

    Five approval regimes, not one

    CDA sanctions building in the Capital Territory, but cantonment boards, DHA Islamabad, the private schemes and RDA each run their own submission route. Which one holds your plot is the first question, and it changes the drawings, the fees and the timeline.

    How the regimes differ

  • Limits

    30 ft

    Two storeys, over a five foot plinth

    In the Capital Territory a house is held to two storeys within 30 ft, measured from a plinth that is itself capped at 5 ft, which is why the basement, excluded from the floor area ratio, is so often the only space left to add.

    DHA Islamabad sets its own

  • Clock

    21 days

    The decision window on a complete file

    CDA has to decide within 21 days of a complete submission and give reasons in writing if it refuses. Sanction then holds for five years. Files come back for missing drawings far more often than for design that breaks a rule.

    The approval route in full

  • Cost

    No single rate

    The specification sets the number

    A rate per square foot quoted before the plot, the specification and the basement decision are settled is a guess dressed as a figure. The cost section below names what actually moves it.

    Construction cost Calculators

  • Appointment

    Three

    Three ways to appoint a firm

    Architect only, architect plus a separate contractor, or Design + Build under one agreement. The third closes the gap between the drawings and the site. That gap is where the argument usually sits when the two are split.

    Design + Build

Every regulatory figure on this page is cited to its clause in the ICT Building Control Regulations 2020, notified under S.R.O. 1575(I)/2019, while DHA Islamabad, the cantonment boards and RDA work to their own instruments.

Which society or sector, and what size?

Those two facts settle the approving authority, the schedule your design is drawn to and the first cost decisions. Send them on WhatsApp and the reply starts from your plot rather than from a brochure.

Society or sector
For example DHA Phase 2, Gulberg Greens or G-14
Plot size
In square yards, marla or kanal, whichever your papers use
Review My Plot Requirements

Where we work in Islamabad and Rawalpindi

DHA Islamabad has a section of its own, with a page for every phase. The CDA sectors and the private schemes of both cities are listed beside it. Each area page covers what is specific to that place, from plot sizes to the approval route. Schemes are grouped by the kind of development rather than by authority, because a scheme answers to the authority its boundary falls under.

Margalla Enclave

A CDA and DHA Islamabad joint venture in CDA Zone IV. Building plans are assessed by Margalla Enclave Management against CDA's regulations, and approval comes before possession, so design is already on the critical path for most allottees.

Margalla Enclave house design and construction
  • Plot sizes125, 250 and 500 sq yd, which is 5 Marla, 10 Marla and 1 Kanal
  • ApprovalRequired before possession is handed over
  • StandardsCDA's regulations, not DHA phase byelaws

DHA Islamabad

Its own byelaws and submission route, with a page for each phase

CDA sectors

Planned sectors of the Capital Territory

Rules and approvals

The reference every clause on this page is cited from

Outside the twin cities

Architecture and interior design only

Which authority approves your plot

Five regimes govern building in Islamabad and Rawalpindi, not two. The Capital Development Authority regulates the whole Islamabad Capital Territory under the ICT Building Control Regulations 2020, and that includes private housing schemes inside ICT. DHA Islamabad applies its own byelaws. The Rawalpindi Development Authority covers Rawalpindi district outside the cantonments, where the Rawalpindi and Chaklala Cantonment Boards approve plans themselves.

Settle this before anything is drawn. Setbacks and height limits come from the governing instrument, so a house designed to CDA parameters on a cantonment plot has to be redrawn from the setback table up.

Margalla Enclave crosses the usual lines. It is a CDA and DHA Islamabad joint venture, and its plans go to Margalla Enclave Management, which assesses them against CDA's regulations rather than DHA phase byelaws.

Read the full CDA and RDA byelaws guide
  1. 1

    Is the plot inside the Islamabad Capital Territory?

    CDA building control applies, private schemes included. The Diplomatic Enclave is the one stated exception.

    ICT BCR 2020, clause 1.1.02
  2. 2

    Is it inside Rawalpindi or Chaklala Cantonment?

    The Cantonment Board approves the plan under its own byelaws, not RDA. Board boundaries do not follow the everyday idea of where Rawalpindi city ends.

    Military Lands and Cantonments Department, Ministry of Defence
  3. 3

    Is it inside DHA Islamabad?

    DHA Islamabad's own byelaws and submission route apply. They differ from both CDA's and DHA Lahore's rules, and vary from phase to phase.

    DHA Islamabad building byelaws
  4. 4

    Is it in a private scheme?

    You deal with the scheme's building control office, which works inside the framework of whichever authority approved the scheme.

    Scheme byelaws, read with the approving authority's instrument
  5. 5

    Anywhere else in Rawalpindi district?

    RDA, through its Land Use and Building Control Directorate. The plot category in the scheme's approved layout plan decides which parameters apply.

    RDA Building and Zoning Regulations 2020

From possession to occupation: the CDA route, drawn to the regulation

This is the route for a house on a plot inside the Islamabad Capital Territory. Each station names who acts and the clause of the ICT Building Control Regulations 2020 that requires it. DHA Islamabad, RDA, the Cantonment Boards and Margalla Enclave Management each run their own version.

  • Owner acts
  • Licensed architect or engineer acts
  • CDA acts
  1. 1

    Before drawing

    OWO

    Possession certificate

    Plot demarcated and the possession certificate issued through CDA's One Window Operation.

    Ownercl. 5.1.1

  2. 2

    Before drawing

    2 licences

    Appoint the professionals

    A PCATP-licensed architect and a PEC-registered structural engineer, mandatory from drawings to completion.

    Architect and engineercl. 5.2.1

  3. 3

    Approval

    6 sets

    Prepare the submission

    Six drawing sets and a digital copy. Houses on plots above 600 sq yd also need working drawings.

    Architect and engineercl. 3.4.2

  4. 4

    Approval

    2 folders

    Lodge at One Window

    Form A-1 signed by the owner, Form A-2 by the architect and engineer, filed in two folders.

    Owner, architect, engineercl. 5.3

  5. 5

    Approval

    21 days

    Decision

    Approval, or written reasons, to owner and architect. A refusal can go to the CDA Board within 15 days.

    CDAcl. 2.2.6, 4.1.22

  6. 6

    Approval

    5 years

    Plan validity

    The approved plan holds for five years, or for the construction period in the allotment terms.

    CDAcl. 2.2.5

  7. 7

    On site

    Every slab

    Form D

    Plinth, plot size and building lines certified at plinth level, then Form D again before each slab is poured.

    Architectcl. 3.12.4, 5.5

  8. 8

    On site

    9 stages

    Mandatory inspections

    From ground demarcation to completion, each stage reported to CDA within seven days.

    Architectcl. 3.12.8

  9. 9

    Occupation

    1 month

    Completion notice

    Form B-1 from the owner and Form B-2 from the supervising architect, with as-built drawings.

    Owner and architectcl. 3.12.10

  10. 10

    Occupation

    Rs 50,000

    Completion certificate

    No lawful occupation without it. Living in a house without one draws that fine every year.

    CDAcl. 2.8.1

What the route means for your appointment

Stations 2, 7, 8 and 9 keep the licensed architect accountable from the first drawing to the completion notice. With separate design and construction contracts, that duty sits with a firm checking a builder it does not employ. Under Design + Build it sits with the firm running the site.

The trade-off is independence: an outside architect is a second pair of eyes, and Design + Build swaps that for one accountable party, which is why its inspection records and written scope deserve closer reading.

When the 21 days apply

Clause 2.2.6 sets the period for plans that comply with the regulations when submitted through an architect. A folder missing a possession certificate, or a covered-area schedule that disagrees with the drawings, is not the file that clock was written for.

Every clause on this route, explained in the byelaws guide

Source: Islamabad Capital Territory Residential Sectors Zoning (Building Control) Regulations 2020, notified as S.R.O. 1575(I)/2019, Gazette of Pakistan Extraordinary Part II, 26 December 2019, in force 1 January 2020. Licensed professionals, cl. 5.2.1, printed page 2889(47); submission, cl. 3.4.2, pages 2889(34) to 2889(35); inspection stages, cl. 3.12.8, page 2889(40); completion, cl. 3.12.10, page 2889(41). Fines are the gazetted 2020 amounts. Figures as at 11 September 2026. Confirm current amounts with CDA before relying on them.

What happens after you send your plot details

Get a Preliminary Project Assessment
  1. 1

    You send location and size

    The sector or scheme and the plot size. Corner status and your stage help too.

  2. 2

    We confirm authority and rules

    The governing instrument and schedule, and the envelope your plot can carry.

  3. 3

    You choose the appointment

    Architecture, construction or Design + Build, with deliverables and exclusions in writing alongside the fee proposal.

Rules that shape a house in the Islamabad Capital Territory

These figures come from CDA's regulations and apply to plots inside ICT, private schemes included. DHA Islamabad and RDA plots follow different instruments, so none of these numbers should be carried across to them.

  • 30 ft

    Two storeys in private schemes

    Schedule-5 caps houses in private housing schemes at two storeys within 30 ft, with the overhead tank, parapet and stair tower measured outside that height.

    Schedule-5; cl. 4.1.5

  • 5 ft

    Plinth, measured from the road

    The ceiling for a detached house is 5 ft, or 3 ft 6 in for terraced and attached houses, taken from mean front road level. Build higher and that floor becomes the ground floor, and the house loses a storey.

    cl. 4.1.14

  • 500 sq yd

    One Kanal, on a stated basis

    CDA sets its thresholds in square yards. On the modern 225 sq ft marla a Kanal is 500 sq yd. On the legacy 272.25 sq ft basis the same Kanal is 605 sq yd, which clears both the 501 and 600 sq yd lines below.

    1 sq yd = 9 sq ft; 1 Kanal = 20 Marla

  • 0

    Septic tanks permitted

    None on any plot: sewerage and storm water run as separate systems into the CDA mains.

    cl. 4.1.10

  • 100%

    Basement under the ground floor

    A detached house may run its basement under all of its permissible ground coverage, outside FAR, though never inside the minimum setbacks. Services below road level need mechanical disposal.

    cl. 2.6.1

  • 20% or 0%

    What can be regularised

    Setback deviations on residential plots can be relaxed by up to 20% at scheduled rates. Excess covered area gets no such allowance. It is demolished.

    cl. 2.12.8; cl. 2.4.2, 4.1.7

Size thresholds in the CDA regulations

ThresholdMarla equivalentWhat changesClause
400 sq yd16 MarlaRainwater harvesting tanks, overhead and underground, shown on the submission drawings4.1.2
488 sq ydAbout 19.5 MarlaA second dwelling unit becomes permissible4.1.6
501 sq ydJust over 1 KanalServant room with bathroom becomes mandatory2.10.1
Above 600 sq ydAbove 1 Kanal 4 MarlaWorking drawings become mandatory for a dwelling house3.4.2
Above 10,000 sq ft coveredNot a plot sizeScrutiny period rises from three weeks to up to six, with referral to the Design Vetting Committee3.7.1

Avenir observation

On a plot that falls away from the road, the plinth rule does more design work than the setback table. Plinth is fixed against mean front road level, so the level difference has to be absorbed by a basement, a split level or retaining walls, and each of those is a cost and structure decision that belongs at concept stage rather than on site.

House construction in Islamabad: grey structure or turnkey

Avenir builds in Islamabad and Rawalpindi at two scopes. Grey structure delivers the shell and stops where finishing starts. Turnkey carries on through the finishing to handover, under one contractor. Where one scope ends and the other begins is set by the contract, not by convention, so the bill of quantities has to draw that line item by item.

Scope one

Grey structure

Excavation, foundations, the RCC frame and slabs, masonry, and the conduits and pipework concealed before plaster.

Scope two

Finishing

Flooring, doors and windows, sanitaryware, electrical fittings, joinery, paint and the external works.

Turnkey is both scopes under one contractor, through to handover and the completion certificate.

Items that fall between the two scopes

Each belongs to one scope or the other only because a contract says so. Left unpriced, it comes back as a variation.

  • Internal and external plaster
  • Electrical cable, as distinct from the conduits it is pulled through
  • Roof waterproofing and insulation
  • Door and window frames set during masonry
  • Underground and overhead water tanks
  • Boundary wall, gate and external drainage

What the Capital Territory's rules put on site

Five regulations change what the grey structure has to include, and they are cheaper to price at the start than to discover on site.

  • The plinth. It is capped at 5 ft. On a plot that falls away, the rest of the level change goes into foundations and retaining walls, and the grey structure price has to carry it. cl. 4.1.14
  • Drainage. No septic tank on any plot. Sewerage and storm water run as separate systems into the CDA mains, so both connections belong in the first scope. cl. 4.1.10
  • Rainwater. Once a plot reaches 400 sq yd, overhead and underground harvesting tanks have to appear on the submission drawings, which means they are built with the structure rather than added later. cl. 4.1.2
  • Slabs. Form D is filed before each slab is poured, so pours are programmed around the paperwork. cl. 3.12.4, 5.5
  • Basement. It may run under the whole permissible ground coverage, outside the setbacks. The dig and its shoring then sit inside the grey structure scope and usually set its programme. cl. 2.6.1

Islamabad projects you can open and check

Each card states the plot and the framework its design was drawn to, so you can judge scale and rules rather than a single image. Each project page sets out the brief and what Avenir delivered.

1 Kanal modern house with a white facade in DHA Phase 5, Islamabad, designed by Avenir Developments

1 Kanal modern house, DHA Phase 5 Islamabad

Plot
1 Kanal, detached
Floors
Basement, ground and first
Drawn to
DHA Islamabad byelaws
See the DHA Phase 5 project
2 Kanal neo-classical house with a symmetrical stone-clad facade in Gulberg Greens, Islamabad, designed by Avenir Developments

2 Kanal neo-classical house, Gulberg Greens

Plot
2 Kanal, detached
Covered area
About 12,500 sq ft over basement, ground and first
Elevation
Symmetrical, stone-clad, columned entrance
See the Gulberg Greens project

More work in Islamabad

The portfolio also holds Avenir's other Islamabad projects, among them houses in DHA Islamabad and Naval Anchorage, an 8 Marla commercial building in DHA Islamabad and a modern farmhouse.

What this page does not claim

Avenir Developments has no affiliation with CDA, DHA Islamabad, RDA or either Cantonment Board, and no special access to any of them. It has no completed house in Margalla Enclave, which is still developing. Client names and plot numbers appear only where the client has agreed in writing.

9CDA stages

CDA inspects a house at nine stages from ground demarcation to completion, each reported within seven days. A construction programme has to be written around them, not squeezed between them. cl. 3.12.8

What it costs to build in Islamabad, and why no rate is quoted here

No honest per square foot figure exists for an Islamabad house before drawings do. The rate moves with scope and specification, and with what the covered area figure includes, so a number that states none of those tells you almost nothing.

Current rate bands, each with the scope it covers, sit on Avenir's construction cost pages. The calculators turn your own covered area and specification into a planning range. A quotation is a different document: it comes from drawings, a structural design, a schedule of finishes and a bill of quantities.

Lines an Islamabad budget has to carry

  • The basement decision. Basement area sits outside FAR, so on a plot capped at two storeys it is often the only extra space available. It also brings excavation, retaining walls, waterproofing and pumped drainage.
  • Level correction. Plinth is fixed against the road. A plot below or above road level pays for it in earthworks and retaining walls.
  • Elements required by plot size. Harvesting tanks from 400 sq yd, a servant room from 501 sq yd, and a sewer connection instead of a septic tank on every plot.
  • Covered area on a stated definition. Bay windows count toward FAR, while roof projections within the permitted limits do not (cl. 2.12.2, 2.12.6). Two quotes built on different definitions are not comparable.
  • Specification tier. The widest swing in any budget, and a choice you make rather than a constraint you inherit.

Rs 6 per sq ft

CDA's scrutiny fee for a house under the 2020 schedule, with a Rs 10,000 minimum. On a 6,000 sq ft house that comes to Rs 36,000. Basement area counts toward the fee even though it is excluded from FAR (cl. 2.6.1). Check the current schedule with CDA before budgeting on it.

How to choose the best architect or construction company in Islamabad

Judge a firm by what it will put in writing before you pay it. Six checks do most of the work, and every one can be tested against the regulations or a document rather than a portfolio.

  • Ask who will sign Form A-2.

    Get the architect's and structural engineer's names and registration numbers in writing, then check them with PCATP and PEC. The regulations make both appointments mandatory (cl. 5.2.1).

  • Ask which instrument and schedule the design follows.

    A CDA sector plot is read against Schedule-1 and a private scheme inside ICT against Schedule-5. DHA Islamabad and RDA plots follow their own rules. An answer of "the society rules" means nobody has checked.

  • Ask for the drawing list, sheet by sheet.

    A CDA set includes a covered-area schedule, separate sewerage and drainage plans, fire safety drawings and the structural design (cl. 3.4.2). "A complete architectural package" is a phrase. Ask for the list.

  • Ask who certifies each slab after approval.

    Approval sits halfway along the route. Someone licensed has to issue Form D before every pour and report nine inspection stages (cl. 5.5, 3.12.8), and you should know who that is before you sign.

  • Ask for exclusions and the revision policy in writing.

    As their own document, with the number of design revisions included and what turns a change into a variation.

  • Ask how the price was reached.

    Any rate given before drawings and a specification exist is a rate for a house nobody has designed yet.

Warning signs

  • Talk of affiliation with CDA, DHA Islamabad or RDA, or of approval "through contacts"
  • A promised approval date. Clause 2.2.6 sets the authority's period, and no consultant can shorten it
  • An approval guarantee, or an approval success rate
  • Setback or height figures quoted without a clause reference

Avenir answers all six checks in writing before appointment, and provides its registrations on request rather than printing them on a web page. Put the same six to any firm you are considering and compare the replies.

Architect, contractor or Design + Build

The appointment decides who carries the gap between drawing and site. This is how the three common routes compare on an Islamabad house, including where Design + Build is the weaker choice.

QuestionSeparate architect and contractorContractor supplying the drawingsDesign + Build under one contract
Who signs Form A-2The architect you appoint, with a structural engineerStill has to be a PCATP-licensed architect and a PEC-registered engineer. A draftsman's naqsha cannot be lodged on its ownThe design-build firm's licensed architect and engineer
Contracts you holdTwo, and you manage the interface between themOne for building, with drawings bought as a side serviceOne
When a drawing and the site disagreeArchitect and contractor debate it, and the owner usually paysSettled on site by the contractor, often without a revised drawingThe firm that drew it resolves it
Form D and the nine inspectionsAn independent architect checks a contractor it does not employFrequently unclear who certifies each slab and reports each stageCarried inside one firm, so ask to see the inspection records
How the price is setThe contractor prices your drawings, which works well when they are completeOften a per square foot rate agreed before drawings existFrom coordinated drawings, a structural design and a bill of quantities
Right forOwners who want an independent check and can manage two partiesSmall, simple buildings. Rarely right for 1 Kanal and above, where coordination drives costOwners abroad, and anyone who wants one party answerable for design and site

Avenir can be appointed for architecture alone, for construction, or for Design + Build. Which one fits depends less on budget than on how much of the coordination you want to manage yourself.

One contract, from the first drawing on your plot to the completion certificate.

Start My Design + Build Project

Building in Islamabad while living abroad

An overseas owner does not have to be in Pakistan to take a CDA plan through approval. Form A-1 can be signed by an attorney, and the submission folders provide for CDA's letter accepting that attorney, filed with the attorney's CNIC (cl. 5.3.4).

Use the five-year plan validity (cl. 2.2.5) to your advantage. Finish the submission set and secure approval before you appoint a builder, and the price you negotiate is for a fixed, approved scope. Change the design materially afterwards and you pay twice: once in redrawing, and again in a doubled scrutiny fee if the completion plan departs from the approved one by more than 15% (cl. 3.11.1).

Distance is managed with documents. Drawings are issued with a note of what changed, finishes are agreed line by line on a schedule, and payments follow valuations of work actually done rather than dates on a calendar.

How overseas clients work with Avenir

Documents that start the work

  • Allotment or transfer letterFrom CDA, DHA Islamabad or the scheme
  • Possession certificateWhere it has been issued
  • Owner's CNIC, or the attorney's CNIC with the power of attorneyAs the submission folders require
  • Plot plan or demarcation sheetShowing dimensions, road width and corner status
  • A room brief and a budget rangeRough is fine at this stage

Questions Islamabad plot owners ask

Answers reflect the regulations as at 11 September 2026. They are general guidance, not legal advice, and the approving authority has the final word on your plot.

Does Avenir build in Islamabad and Rawalpindi, or only design there?

Both. Avenir Developments delivers architecture, construction, Design + Build and interior design directly in Islamabad and Rawalpindi, run from its studio at 101, Luxus Mall, Gulberg Greens. Beyond Lahore and the twin cities, Avenir offers architecture and interior design remotely, without construction or site supervision.

Does Avenir build farmhouses and commercial buildings in Islamabad?

Yes. Alongside houses from 5 Marla to 2 Kanal, Avenir designs and builds farmhouses and commercial buildings in the twin cities. The first step is the same as for a house: confirm which authority and which set of regulations govern the plot, because that fixes how much can be built, and where on the plot, before any design starts.

Which authority approves a house plan in Islamabad?

That depends on where the plot sits. Inside the Islamabad Capital Territory, CDA approves under the ICT Building Control Regulations 2020, including in private schemes inside ICT. DHA Islamabad approves plans in its own phases under its own byelaws. In Rawalpindi district, RDA approves outside the cantonments and the Rawalpindi and Chaklala Cantonment Boards approve inside them. Confirm the authority before design starts.

Do DHA Islamabad plots follow CDA byelaws?

No. DHA Islamabad has its own building byelaws and submission route, separate from CDA's and also from DHA Lahore's. Margalla Enclave is the case people confuse: it is a CDA and DHA Islamabad joint venture, and its plans are assessed by Margalla Enclave Management against CDA's regulations.

Can I submit my own house drawings to CDA?

No. Clause 5.2.1 of the ICT Building Control Regulations 2020 makes it mandatory to engage a licensed architect registered with PCATP and a structural engineer registered with PEC, both to prepare the plans and to supervise the work until completion, with the owner signing Form A-1 and the architect and engineer signing Form A-2.

How long does CDA take to approve a house plan?

For plans that comply when lodged, CDA is to convey approval or written reasons within 21 days under clause 2.2.6. Clause 3.7.1 allows three weeks for buildings up to 10,000 sq ft of covered area and up to six weeks above that. Once approved, a plan stays valid for five years under clause 2.2.5.

How much does it cost to build a house in Islamabad?

It depends on covered area, the basement decision, level correction, specification tier and what the covered area figure includes. That is why this page quotes no headline rate. Avenir's construction cost pages carry current rate bands with their scope, and the calculators give a planning range for your own plot. A quotation comes from drawings, a structural design, a schedule of finishes and a bill of quantities.

What is the difference between grey structure and turnkey construction?

Grey structure is the shell: excavation, foundations, the RCC frame and slabs, masonry, and the conduits and pipework concealed before plaster. Turnkey adds the finishing, from flooring, doors and sanitaryware to electrical fittings and paint, and runs through to handover. Items such as plaster and water tanks sit on one side of that line or the other only because a contract says so, which is why the bill of quantities has to list them. Avenir takes construction appointments in Islamabad and Rawalpindi at either scope.

What should I check before hiring an architect or construction company in Islamabad?

Ask who will sign Form A-2, then check the architect with PCATP and the engineer with PEC. Ask which instrument and schedule the design follows, and get the drawing list by sheet. Find out who certifies each slab and reports the nine inspection stages. Get the exclusions and revision policy in writing, and ask how the price was reached. A claimed affiliation with CDA, DHA or RDA, or a promised approval date, is a warning sign.

Does Avenir work in Margalla Enclave?

Yes, for design, approval drawings, construction and Design + Build. In Margalla Enclave the building design has to be approved by Margalla Enclave Management before possession is handed over, so design sits on the critical path. Avenir has no office inside the scheme and, as the scheme is still developing, no completed house there yet.

Can an overseas Pakistani get a plan approved in Islamabad without travelling?

Yes. For a CDA plot, Form A-1 can be signed by an attorney, and the submission folders provide for CDA's letter accepting the attorney together with the attorney's CNIC under clause 5.3.4. Design reviews and material approvals can then run on documents from abroad.

Is a basement worth building on an Islamabad plot?

Often, on a plot capped at two storeys. Under CDA's regulations basement area is excluded from FAR, and a detached house may run its basement under all of its permissible ground coverage, outside the minimum setbacks (clause 2.6.1). It still counts toward scrutiny fee and property tax, and it brings excavation, retaining walls, waterproofing and pumped drainage, so the decision belongs at concept stage.

You do not need drawings to start.

Send the plot's location and size. The reply confirms the approving authority and the rules your design has to meet, and suggests the appointment that fits, before any fee is discussed.