DHA Phase 7 Lahore Architects & House Builders | Avenir

Sectors P to Z

Architects and house builders in DHA Phase 7, Lahore

Avenir Developments is an architecture, interior design and construction company in Lahore. On DHA Phase 7 plots we design the house to DHA's 2026 regulations, coordinate its structure and services, prepare the submission drawings and build it under Design + Build, with a written progress report every week.

Discuss My Project on WhatsApp

Replies within one working day. The first consultation is free.

projects completed
232
authority approvals
167
designed and built by Avenir
24

Counted from Avenir's own records, Q4 2026.

Render of a 1 Kanal modern house in DHA Phase 7 Lahore at dusk, designed by Avenir DevelopmentsRender
  • 39 ft with the mumtee and parapet
  • 32 ft without them; no second floor
  • 5 ft 4½ in clear each side of a 50 ft frontage

Render: a 1 Kanal house in DHA Phase 7, designed by Avenir Developments. Drawing: schematic street elevation of a 1 Kanal house under DHA's height limits, measured from the road crown (Reg 23(a), 2026 edition).

Design first. Build once.

Phase 7 in brief

Where DHA Phase 7 sits, and what is being handed over

DHA Phase 7 (Phase VII) lies east of DHA Phase 6, in east Lahore. Barki Road runs along its north-east side, Bedian Road along its south-west side and the B.R.B. canal along its east.

317plots in DHA's eight Phase VII possession notices of 2026

Sectors
P, Q, R, S, T, U, V, W, X, Y and Z, with the Overseas Enclave in Sector T and commercial areas CCA-1 to CCA-6 on DHA's plan.
Master plan
Revised by DHA in July 2026.
Possession
68 Phase VII possession notices from April 2021 to September 2026, covering every sector.
2026 plot mix
222 plots of 1 Kanal, 65 of 10 Marla and 30 commercial plots in Sector Z.
Building rules
DHA Lahore Construction and Development Regulations, 2026 edition: two storeys and one basement, 39 ft from the road crown.
Neighbours
Phase 6 and the Defence Raya golf course to the west, the Lahore School of Economics to the north, the Kidney and Liver Institute to the south-west.
Our office
139 CCA, DHA Phase 5, about 5 km west of Phase 7's western edge in a straight line.
AirportRing RoadOur office,
DHA Phase 5
about 5 kmDHA
Phase 6
LSEDHA Phase 7B.R.B. canalN2 km

Phase 7 in east Lahore. Outline traced from DHA's Phase VII plan; roads and canal: OpenStreetMap contributors. Schematic.

Sector by sector

Phase 7, sector by sector: where DHA is handing over plots

Pick your sector. The map marks it on DHA's Phase VII plan, with the number of its plots in DHA's 2026 possession notices and every notice that has named it since 2021.

CCA-1 CCA-2 CCA-3 CCA-4 CCA-5 CCA-6 Overseas Enclave Barki Road Bedian Road B.R.B. canal Shabir Sharif Boulevard N Defence Raya golf course Phase 6 Phase 6 Bangali LSE NSIT City Kidney and Liver Institute P Q R S TTT UUUU V W XXX YYYYY ZZZ
Barki Road Bedian Road B.R.B. canal N NSIT City LSE Phase 6 P Q R S TTT UUUU V W XXX YYYYY ZZZ
  • Circle size: plots in DHA's 2026 notices
  • Sector letter, where DHA's plan prints it
  • Commercial area (CCA)
  • North points right, as on DHA's sheetNorth is up
Which sector is your plot in?

All of Phase 7

Eleven residential sectors, P to Z, handed over in stages since 2021.

Plots in 2026 notices
317
Notices since April 2021
68
Latest notice
September 2026

Most 2026 plots were in Sectors U (132), Z (83) and Y (62). Pick a sector for its own figures.

Sector P

The northern tip of the phase, beside the Lahore School of Economics and Barki Road.

Plots in 2026 notices
7
Notices naming it since April 2021
10
Latest notice
September 2026

Sector Q

The north of the phase, beside Bangali village, with Barki Road to the north-east.

Plots in 2026 notices
1
Notices naming it since April 2021
12
Latest notice
September 2026

Sector R

The north-west edge, between Phase 6 Sectors M and N.

Plots in 2026 notices
1
Notices naming it since April 2021
2
Latest notice
September 2026

Sector S

The north of the phase, between Sectors R and T.

Plots in 2026 notices
0
Notices naming it since April 2021
3
Latest notice
October 2024

No 2026 notice has named Sector S so far.

Sector T

The north-east, toward Barki Road. It includes the Overseas Enclave.

Plots in 2026 notices
1
Notices naming it since April 2021
9
Latest notice
March 2026

DHA's July 2023 notice for the Overseas Enclave covered 70 plots of 1 Kanal and 30 of 10 Marla.

Sector U

The east of the phase, between Sectors T and X, reaching the canal side.

Plots in 2026 notices
132
Notices naming it since April 2021
12
Latest notice
September 2026

With Sector Y, it took every 10 Marla plot DHA handed over in 2026 (65 in all).

Sector V

The centre of the phase, west of Sector U.

Plots in 2026 notices
24
Notices naming it since April 2021
10
Latest notice
September 2026

Sector W

The centre-west, beside the Defence Raya golf course.

Plots in 2026 notices
1
Notices naming it since April 2021
4
Latest notice
August 2026

Sector X

The south-centre, stretching east toward the canal.

Plots in 2026 notices
5
Notices naming it since April 2021
13
Latest notice
September 2026

Sector Y

The south of the phase, along Bedian Road and the canal, around Karbath village.

Plots in 2026 notices
62
Notices naming it since April 2021
22
Latest notice
September 2026

With Sector U, it took every 10 Marla plot DHA handed over in 2026 (65 in all).

Sector Z

The south-west, around NSIT City and beside the Kidney and Liver Institute.

Plots in 2026 notices
83
Notices naming it since April 2021
9
Latest notice
August 2026

Its 2026 total includes 30 commercial plots from March 2026: one 2 Kanal, fifteen 8 Marla and fourteen 4 Marla.

Every Phase 7 sector in DHA's possession notices

SectorWhere on DHA's planPlots in 2026 noticesNotices since April 2021Latest notice
Sector PNorthern tip, by LSE710September 2026
Sector QNorth, by Bangali112September 2026
Sector RNorth-west edge12September 2026
Sector SNorth03October 2024
Sector TNorth-east19March 2026
Sector UEast, to the canal13212September 2026
Sector VCentre2410September 2026
Sector WCentre-west14August 2026
Sector XSouth-centre513September 2026
Sector YSouth, along Bedian Road6222September 2026
Sector ZSouth-west839August 2026
CCA-4North-east, commercial–2June 2022

Sources: DHA Lahore possession notices for Phase VII, 8 April 2021 to 11 September 2026, and plot counts from the eight 2026 notices. Map traced by Avenir Developments from DHA's Phase VII master plan, revised July 2026; schematic and not to scale. Read Q4 2026.

Plot allowance

What a Phase 7 plot allows, and what it costs to build to the limit

DHA's regulations set the clear spaces around the house, how much of the ground floor the first floor may cover, the mumtee and the height. Drawn to the limit, the plot sizes most common in Phase 7 give these covered areas and planning costs.

1 Kanal

50 × 90 ft, 4,500 sq ft

Clear spaces: front, rear, each side
15 ft 9 in, 5 ft 4½ in, 5 ft 4½ in
Ground floor
about 2,703 sq ft
First floor, 80%
about 2,163 sq ft
Above ground, with the mumtee
about 5,170 sq ft

Complete house, Q4 2026

Standard, above ground
PKR 41.1 million
Premium, above ground
PKR 54.8 million
Standard, with a full basement (about 7,870 sq ft)
PKR 65.4 million

2 Kanal

75 × 120 ft, 9,000 sq ft

Clear spaces: front, rear, each side
20 ft 9 in, 8 ft 4½ in, 5 ft 4½ in
Ground floor
about 5,839 sq ft
First floor, 78%
about 4,554 sq ft
Above ground, with the mumtee
about 10,690 sq ft

Complete house, Q4 2026

Standard, above ground
PKR 88.9 million
Premium, above ground
PKR 118.6 million
Standard, with a full basement (about 16,530 sq ft)
PKR 143.8 million

10 Marla

35 × 65 ft, 2,275 sq ft

Clear spaces: front, rear
10 ft 9 in, 5 ft 4½ in
First floor
82% of the ground floor
Mumtee
up to 175 sq ft
Height
39 ft from the road crown

For 10 Marla and smaller plots, DHA's 2026 table fills only one of its two side columns; for 10 Marla it reads 5 ft 4½ in. We confirm with DHA Building Control whether it applies on one side or both before the layout is fixed, because it moves the ground floor by more than 250 sq ft.

Complete house, Q4 2026

Price your own 10 Marla layout in the construction cost calculator, at the DHA Lahore rates below.

DHA Lahore rates, per sq ft of covered area, Q4 2026

Complete, Essential
6,890
Complete, Standard
7,950
Complete, Premium
10,600
Grey structure, Standard
3,500

Totals come from our construction cost calculator at typical design complexity, which adjusts the rate for plot size. Complete means grey structure plus finishing. The boundary wall is priced per running foot outside these rates. A planning figure, not a quotation. Rates reviewed quarterly by the Avenir Developments market intelligence team. Q4 2026.

Plans drawn to one scale, road on the left. Clear spaces and coverage: DHA Lahore Construction and Development Regulations, 2026 edition, Regs 22(a), 27(a) and 33. Covered area is ground floor, first floor and mumtee; a full basement is added where stated.

Section

Levels, basement and roof: the rules that shape a Phase 7 house

Most redesigns start with a level or a height that was guessed. These are the vertical rules a Phase 7 house is drawn to, from the road crown to the top of the mumtee.

39 ft 32 ft Road Basement Ground floor First floor Mumtee 1 2 3 4 5 6 7 8

Schematic section through a 1 Kanal house. The numbers match the list.

  1. Road crownEvery height is measured from the crown of the road in front of the plot (Reg 23(a)).

  2. Plinth1 ft 6 in to 3 ft 6 in above the road crown; up to 5 ft 6 in on 1 Kanal and larger plots (Reg 28(a)).

  3. BasementOne level, up to the allowable covered area less the porch (Reg 27(a)(1)).

  4. Two storeysGround and first floor. A second floor is not permitted (Reg 23(a)).

  5. 32 ftThe top of the main building, without the mumtee and parapet (Reg 23(a)).

  6. 39 ftThe limit with the mumtee and parapet included (Reg 23(a)).

  7. MumteeFor the stair only: up to 300 sq ft on 1 Kanal and 175 sq ft up to 10 Marla (Reg 33).

  8. Front wallTwo CCTV cameras at the ends of the front wall (Reg 66).

Generator: up to 25 KVA on a house (Reg 58).

Swimming pool: on 1 Kanal and larger plots only (Reg 34(a)).

DHA Lahore Construction and Development Regulations, 2026 edition. Every rule, with its regulation number, is on our DHA Lahore building byelaws page.

Possession to site

Building in a phase that is still being handed over

Phase 7 is not Phase 5. Plots are still being handed over, services arrive street by street and most houses go up beside empty plots. Six things that change how a Phase 7 house is planned.

Possession comes plot by plot

DHA has opened Phase VII in 68 notices since April 2021, often a few plots at a time. Plan around the notice that names your plot number, not around your sector.

Services can follow possession

DHA's November 2022 notice for Sectors P, Q, V, W, X and Y gave possession on condition that electrical works would be completed within a year of the possession letter. Ask DHA what is connected on your street before you fix a start date.

Two clocks start

The regulations give three years from possession to start building and two years from drawing approval to finish (Reg 17).

A basement beside empty plots

Neighbouring plots are often still empty, which keeps excavation simpler than in an older phase. The retaining walls are still designed for the house that will one day be built next door.

Design for neighbours not yet built

Side windows, terraces and the roof are planned for the houses that will rise beside yours, so the rooms keep their light and privacy when the street fills in.

Demarcation before digging

DHA marks the plot on site after the drawings are approved: 7 working days on the regular service, 2 on the executive service. Nothing is excavated before it.

Possession letter in hand? Start the drawings now.

Send your sector, plot size and site plan if you have it. We reply within one working day and send a fee proposal within two working days.

Start My Phase 7 House Design

No obligation. The first consultation is free.

DHA's steps

From possession to completion: DHA's steps and published times

Six steps sit between a possession letter and a completion certificate. The bars show DHA's own published times; the drawing set is where most of the time is won or lost.

  1. Site plan

    Regular7 days
    Executive2 days

    Issued after possession; it fixes what the drawings are drawn to.

  2. Drawing approval

    Regular20 days
    Executive5 days

    The regulations allow 21 working days for scrutiny, and a resubmission starts the clock again (Reg 16(a)).

  3. Demarcation

    Regular7 days
    Executive2 days

    DHA marks the plot on site after approval.

  4. Construction

    To finish within two years of approval (Reg 17). DHA checks the work at stages (Reg 18).

  5. Water and sewer

    Regular21 days

    Connections on the regular service.

  6. Completion certificate

    Regular21 days
    Executive5 days

    Issued once the house matches the approved drawings.

Online: applications go through DHA Lahore e-services.

Owners abroad: DHA accepts a special power of attorney (Reg 63).

Executive service: faster, at a higher DHA fee.

Days are working days, as published by DHA Lahore Building Control for its regular and executive services. Regulations: DHA Lahore Construction and Development Regulations, 2026 edition.

How we work

One team from the first drawing to handover

Design + Build runs on two agreements: the Architecture and Interior Design Agreement first, then the Construction Service Agreement once the design is approved and the quantities are measured. Read more on Design + Build.

  1. First conversation

    Free, on WhatsApp, a call or at our Lahore office in DHA Phase 5.

  2. Brief and concept

    Rooms, basement, budget and how you live, turned into layouts and massing for your plot. Drawn as many times as it needs.

  3. Coordinated design

    Architecture, interiors, structure and services drawn together by our architects and by in-house and appointed PEC engineers. A typical house runs to more than 100 drawing sheets, coordinated in BIM.

  4. Submission and approval

    Submission drawings to DHA's 2026 regulations, and every DHA observation answered on the drawings.

  5. Quantities, then one figure

    Quantities measured from the approved drawings before the construction figure is fixed.

  6. Construction

    Built to the approved drawings, with stage checks and a written progress report every week. Payments fall due against completed, verified stages.

  7. Snag list and handover

    Every snag closed before the keys are handed over.

Phase 7 work

Phase 7 houses designed by Avenir

Three 1 Kanal designs for Phase 7 plots, all by Avenir Developments. In all, we have completed 232 projects, 24 of them designed and built by us (Q4 2026).

1 Kanal modern house, Sector Y

Grey stone and timber screens on a 1 Kanal plot in Sector Y. Designed by Avenir Developments.

View the project

1 Kanal modern house, DHA Phase 7

A light stone facade with deep dark frames for a family building in Phase 7. Designed by Avenir Developments.

View the project

1 Kanal modern house design, DHA Phase 7

Stone, glass and bronze-toned frames, drawn for a 1 Kanal plot in Phase 7. Designed by Avenir Developments.

View the project

Building in the Overseas Enclave, or anywhere in Phase 7, from abroad?

Most of the work happens on WhatsApp and video calls, with drawings shared online and a written progress report from site every week.

Discuss My Project on WhatsApp

Our overseas clients live in 18 countries.

Questions

DHA Phase 7 Lahore: questions owners ask before they build

Where is DHA Phase 7 in Lahore?

DHA Phase 7 (Phase VII) lies in east Lahore, east of DHA Phase 6 and the Defence Raya golf course. Barki Road runs along its north-east side, Bedian Road along its south-west side and the B.R.B. canal along its east. Its sectors are P to Z, with the Overseas Enclave in Sector T and commercial areas CCA-1 to CCA-6. Our Lahore office in DHA Phase 5 is about 5 km from its western edge in a straight line.

Which sectors of DHA Phase 7 have possession?

DHA has issued 68 Phase VII possession notices since April 2021, covering every sector from P to Z. The eight notices of 2026 cover 317 plots: 222 of 1 Kanal, 65 of 10 Marla and 30 commercial. Most were in Sectors U (132), Z (83) and Y (62), and the latest notice is dated September 2026. Possession goes by plot number, so check that your plot is named in a notice before you plan a start date.

How much can I build on a 1 Kanal plot in DHA Phase 7?

On a 50 by 90 ft plot, DHA's 2026 regulations leave clear spaces of 15 ft 9 in at the front and 5 ft 4½ in at the rear and on each side, which gives a ground floor of about 2,703 sq ft. The first floor may cover 80 percent of that, about 2,163 sq ft, and the stair mumtee up to 300 sq ft: about 5,170 sq ft above ground. One basement level is allowed. The house stays within 39 ft of the road crown, and a second floor is not permitted.

What does it cost to build a 1 Kanal house in DHA Phase 7?

At Q4 2026 rates for DHA Lahore, a complete 1 Kanal house of about 5,170 sq ft above ground plans at about PKR 41.1 million at Standard specification and PKR 54.8 million at Premium. With a full basement, about 7,870 sq ft in all, Standard comes to about PKR 65.4 million. These are planning figures, not a quotation; the construction cost calculator gives a figure for your own covered area and specification.

How long does DHA take to approve house drawings in Phase 7?

DHA's regular service approves residential drawings in 20 working days, and its executive service in 5 working days at a higher fee. The regulations allow 21 working days for scrutiny, and a resubmission starts the clock again (Reg 16(a)), so a complete, compliant first submission saves the most time.

Can I build a basement in DHA Phase 7?

Yes. One basement level is allowed, up to the allowable covered area less the porch (Reg 27(a)(1)). In much of Phase 7 the neighbouring plots are still empty, which keeps excavation simpler than in an older phase; the retaining walls are still designed for the house that will one day be built next door.

What does a 10 Marla plot allow in DHA Phase 7?

A 35 by 65 ft plot has a front clear space of 10 ft 9 in and a rear clear space of 5 ft 4½ in. For 10 Marla and smaller plots, DHA's 2026 table fills only one of its two side columns; for 10 Marla it reads 5 ft 4½ in, and we confirm with DHA Building Control whether it applies on one side or both before the layout is fixed. The first floor may cover 82 percent of the ground floor, the mumtee up to 175 sq ft, and the 39 ft height limit applies.

Can I build in the Overseas Enclave while living abroad?

Yes. Most of the work runs on WhatsApp and video calls, drawings are shared online, and DHA paperwork can be handled through a special power of attorney (Reg 63). Once construction starts, you receive a written progress report every week. Our overseas clients live in 18 countries.

How long does it take to build a house in DHA Phase 7?

Without a basement, the grey structure takes about 4 months for a 10 Marla house, 6 to 7 months for 1 Kanal and 8 to 9 months for 2 Kanal; finishing follows. DHA's regulations allow two years from drawing approval to complete the house (Reg 17).

Do you design commercial buildings on Phase 7 commercial plots?

Yes. DHA handed over 30 commercial plots in Sector Z in March 2026 (one of 2 Kanal, fifteen of 8 Marla and fourteen of 4 Marla), and DHA's plan shows commercial areas CCA-1 to CCA-6. We design commercial buildings to DHA's commercial rules and can build them under Design + Build; see 8 Marla commercial building construction.

What do you need from me to start?

Your sector and plot number, the plot size, your possession letter or site plan if you have them, and a short brief: the rooms, a basement or not, and a budget. The first consultation is free, we reply within one working day, and a fee proposal follows within two working days.

Sources

Where the figures on this page come from

  • Possession noticesDHA Lahore, Possession, Phase VII tab: 68 notices, April 2021 to September 2026. dhalahore.org/possession
  • Master planDHA Lahore, Master Plan Phase VII, revised July 2026 (PDF). The sector map on this page is traced from it. Phase VII plan, July 2026
  • Building rulesDHA Lahore Construction and Development Regulations, 2026 edition (PDF): Regs 16, 17, 18, 22, 23, 27, 28, 33, 34, 58, 63 and 66. Regulations, 2026 edition
  • Service timesDHA Lahore Building Control, regular and executive services. Executive services
  • CostsAvenir Developments construction cost calculator, Q4 2026 rate set, DHA Lahore, typical design complexity. Construction cost calculator
  • Locator mapRoads, canal and the airport: OpenStreetMap contributors. Distances are straight-line. OpenStreetMap

Prepared by Avenir Developments, Lahore. Reviewed each quarter against DHA's notices and our rate set; this edition: Q4 2026.

Start here

Tell us about your Phase 7 plot

Four answers and your message is written for you. We reply within one working day, and the first consultation is free.

Your message

Hello Avenir Developments, I would like to discuss my project.
Location: DHA Phase 7, Lahore
Ref: DHAL7-FINAL

Discuss My Project on WhatsApp

It opens in WhatsApp. Nothing is sent until you press send.

Lahore office: 139 CCA, DHA Phase 5, Lahore

Hours: Monday to Saturday, 10:00 to 19:00

Offices in Lahore and Islamabad. WhatsApp +92 300 1101807.