Commercial construction

8 Marla Commercial Building Construction in Lahore, Islamabad and Rawalpindi

We build plazas, showrooms, offices and mixed-use buildings on 8 Marla commercial plots, as grey structure, shell and core, turnkey or Design + Build.

A basement, ground floor, mezzanine and four floors takes 12 to 15 months on site, from excavation to handover. The price follows your drawings, the soil report and a bill of quantities measured from them, and every site sends you a weekly progress report.

Design first. Build once.

Plot
30 × 60 ft8 Marla commercial, DHA Lahore
Building
Up to 12,320 sq ftDHA Lahore, Phase V onwards
On site
12 to 15 monthsBasement, ground, mezzanine, four floors
Reporting
WeeklyOn every site we build
Render of an 8 Marla commercial building with a showroom and four office floors, designed by Avenir Developments for DHA Phase 8, Lahore
Sketch, then render: an 8 Marla commercial building we designed for DHA Phase 8, Lahore. Approved by DHA; construction not started.

The building

An 8 Marla commercial plot carries up to seven floors of building

In DHA Lahore, from Phase V onwards, a 30 × 60 ft commercial plot takes a basement, ground floor, mezzanine and four floors. That is up to 12,320 sq ft of covered area on 1,800 sq ft of land, and it is the quantity a construction price has to cover.

Basementup to 1,800 sq ftGround, with verandah1,800 sq ftMezzanine1,170 sq ftFloor 11,800 sq ftFloor 21,800 sq ftFloor 31,800 sq ftFloor 41,800 sq ftRoof: stair and lift rooms350 sq ftUp to 12,320 sq ft of buildingRoad side
Schematic. A mid-row plot in DHA Lahore, Phase V onwards, built to the largest envelope the regulations allow.
Covered area by level, DHA Lahore, Phase V onwards
LevelCovered areaWhere DHA sets it
Roof: stair room and lift machine room350 sq ft275 + 75Reg 33(b), p. 27Reg 33(b), p. 27
Floors 1 to 47,200 sq ft4 × 1,800Reg 27(b)(4), p. 25Reg 27(b)(4), p. 25
Mezzanine1,170 sq ft75% of the 1,560 sq ft shop behind the verandahReg 27(b)(3), p. 25Reg 27(b)(3), p. 25
Ground floor, with the 8 ft verandah1,800 sq ftThe whole plotReg 27(b)(2), p. 25Reg 27(b)(2), p. 25
Basementup to 1,800 sq ftLess room left for the septic and underground water tanksReg 27(b)(1), p. 25Reg 27(b)(1), p. 25
Totalup to 12,320 sq ft

Arithmetic on the largest building a mid-row plot allows. Phases I to IV allow two floors above the mezzanine instead of four (Reg 23(e), p. 22), which comes to up to 8,720 sq ft. Your approved drawings fix the real figure. Source: DHA Lahore Construction and Development Regulations 2014, 2026 edition; summary on our DHA Lahore building byelaws page.

What owners build on an 8 Marla commercial plot

  • Shops to let, halls above

    Shops on the ground floor and mezzanine; open halls above, let as offices, clinics or classrooms.

  • One showroom, offices above

    A double-height showroom with its mezzanine, and a separate stair and lift for the office floors. Our DHA Phase 8 design works this way.

  • Apartments on the top two floors

    DHA Lahore allows only the upper two floors to be converted into apartments, each with its own utility meters and water valve (Reg 26, p. 24).

Outside DHA Lahore, DHA Islamabad, LDA schemes, CDA sectors and Bahria Town set different floors and coverage for the same plot. Our commercial building and plaza design page sets them side by side. We build to whichever applies, in Lahore, Islamabad and Rawalpindi.

Build programme

From excavation to handover in 12 to 15 months

For a basement, ground floor, mezzanine and four floors, our programme runs 12 to 15 months on site. This is the order the building goes up in, with the five points at which DHA Lahore checks the work. Choose a scope to see which stages it covers.

Which scope do you want priced?
Front elevation8 Marla commercialBGM123430 ftRoad level
Schematic front elevation. The parts inside the chosen scope stay solid.
  1. Before siteDrawings and DHA approvalArchitecture, structure and MEP drawn and coordinated, then submitted to DHA and approved.
  2. 1Setting outThe building is set out on the plot.DHA check 1: layout
  3. 2ExcavationDug inside the plot line, with the buildings next door protected.
  4. 3BasementRaft, retaining walls and waterproofing, with room left for the tanks.
  5. 4Up to DPCPlinth and damp-proof course.DHA check 2: DPC
  6. 5Ground and mezzanineColumns, beams and slabs, with conduits and sleeves cast in.DHA check 3: first floor
  7. 6Four floors and roofFloor slabs, roof, stair room, lift machine room and tanks.
  8. 7Masonry and plasterWalls built and plastered. Grey structure ends here.DHA check 4: grey structure
  9. 8ServicesRisers, wiring, plumbing, drainage and the fire alarm.
  10. 9FacadeCurtain glass, tempered or filmed, and the shopfront.
  11. 10Core and plantLift, steel emergency stair, generator, common areas and toilets.
  12. 11Tenant floorsFloors, ceilings, lighting and fittings finished for use.
  13. 12HandoverTesting, the snag list closed, then handover.DHA check 5: completion

Choose a scope above. Whichever you choose, the price comes from the drawings and a measured bill of quantities, and payments fall due against completed, verified stages.

Grey structure: stages 1 to 7

We build the structure, masonry and plaster, with conduits and sleeves cast in. Services, facade, lift and finishes follow under another scope, or your tenants take them on.

Shell and core: stages 1 to 10, then 12

We build the grey structure, then the services, facade, lift, emergency stair, generator, common areas and toilets. Tenant floors are handed over open, ready for each tenant to fit out.

Turnkey: stages 1 to 12

We build and finish every floor, then test, close the snag list and hand over a building ready to let or occupy.

Design + Build: drawings and approval, then stages 1 to 12

We draw the building first, take it through DHA approval and build it under one appointment. In DHA Lahore our site team requests and attends all five DHA checks.

What moves the price

Eight things an 8 Marla plaza's price has to carry

A plaza is priced differently from a house of the same covered area. These eight items are where its quantities differ, and in DHA Lahore the regulations already fix several of them.

60 ft plot depthTanks8 ft2 ftRoad12345678
Schematic section, road on the left. The numbers match the cards.
  1. 1

    Basement

    Depth, retaining walls and waterproofing follow the soil report. DHA asks for room in the basement for the septic and underground water tanks.

    Reg 27(b)(1), p. 25

  2. 2

    Showroom height

    Ground and mezzanine together are 17 ft clear, or 21 ft where no commercial building stands on the plots next door. A taller front means taller columns and more glass.

    Reg 38, p. 29

  3. 3

    Frame

    Two columns across the 30 ft front, each at least 13½ in. The spans behind them follow the use: offices, a showroom and apartments load a frame differently.

    Reg 38, p. 29

  4. 4

    Core

    A stair, a lift and an iron or steel emergency staircase at every floor, with a 275 sq ft stair room and a 75 sq ft lift machine room on the roof.

    Annex D, p. 48; Reg 33(b), p. 27

  5. 5

    Facade

    Curtain glass needs tempered outer glass, anti-shatter film or both. A 2 ft projection is allowed toward the road, with nothing built on it.

    Reg 38, pp. 29 to 30

  6. 6

    Plant

    A rooftop diesel generator of up to 200 KVA in a soundproof canopy, and the overhead and underground tanks.

    Reg 58(b), p. 39

  7. 7

    Fire safety

    On every floor, three 6 kg DCP extinguishers, 10 smoke detectors, three manual call points and three exit lights, plus a call point and an exit light in the stair.

    Annex D, p. 48

  8. 8

    Tenant floors

    Finished, or left open for tenants to fit out. The scope decides how much of the building the price covers.

    Your scope

Why this page gives no rate per sq ft

Our published construction rates are for houses, on our house construction cost page. A plaza carries the eight items above in proportions that change with its use and its plot, so we price each one from its own drawings and quantities instead of publishing a commercial rate.

Quotation

How we price an 8 Marla commercial building

Many plaza quotations start from a rate per sq ft given before a drawing exists, and the gap is recovered later through exclusions and variations. Ours starts from the drawings, and every item is measured before it is priced.

GuessMeasure the quantities.

A rate before drawings

  1. Plot size times a rate
  2. Work starts
  3. Items turn out to sit outside the rate
  4. Variations
  5. The final cost moves

Our quotation

  1. Architectural, structural and MEP drawings
  2. Plot conditions and the soil report
  3. A bill of quantities measured from the drawings
  4. One quotation for the scope you choose
  5. Payments against completed, verified stages

When the drawings you bring have gaps

If drawings from another office are missing detail, break an authority rule or have structure and services clashing, we mark each item and price the fix into the quotation, rather than charging for it as extra work on site. If you would prefer those items priced as though they were not there, so the number matches a cheaper quote, we will decline the project.

What we do not take on

  • Labour-only contracts. We work with materials and labour, or turnkey.
  • Taking over a part-built plaza. We can review one for a fee and recommend what to do.
  • Tenders. We do not bid against other contractors.

No drawings yet? Start with commercial building and plaza design, or appoint us for Design + Build and hold one contract from the first drawing to handover.

Our work

Commercial buildings we have designed, and buildings we have built

Each card says what we did. The two plazas are our designs; the house and the farmhouse are buildings we have built.

On record: 24 Design + Build projects, and 167 approvals across 23 societies and authorities. See all projects.

Your drawings

Send the drawings you already have

Whatever stage they are at, we read them before we price anything and tell you what is missing.

What do you have so far?

On site

Building between two neighbours on a 30 ft front

A mid-row 8 Marla commercial plot has buildings on both sides and the road in front, so the whole site is run inside the plot line. In DHA Lahore the regulations set six of the limits.

NeighbourNeighbourCoreRoad30 ft60 ft1223456
Schematic plan of a mid-row plot. The property line, in teal, is the edge of the site.
  1. 1Foundations stay inside the property line.Reg 38, p. 29
  2. 2The buildings next door are protected through excavation and dewatering, and the owner answers for their structural safety.Reg 38(f)(3)(f), p. 29; Reg 42(a), p. 32
  3. 3No concrete mixing or steel cutting on the road, and no mixer parked on the berm.Reg 46(h), p. 33
  4. 4An 8 ft verandah across the front, its floor sloping 1:20 toward the road.Reg 38, p. 28
  5. 5The shop plinth sits 3 ft 6 in above the road where there is a basement, and 1 ft 6 in where there is not.Reg 38, p. 28
  6. 6A 2 ft projection toward the road, with nothing built on it.Reg 38, p. 29

These limits shape the programme, so deliveries, pours and storage are planned around them before excavation starts. DHA Lahore applies them under the 2014 regulations, 2026 edition; other authorities set their own, and we read them for the plot.

While it is built

What you receive while your plaza is being built

The written record is the same on every site, for owners who visit every week and for owners abroad.

1234Every weekuntil handover5678
The weekly loop runs until handover. The numbers match the lists.

Every week

  1. 1A week of work on site.
  2. 2Your weekly progress report, on every site.
  3. 3Each stage checked when it is complete.
  4. 4Payment falls due for that stage only.

At handover

  1. 5The snag list worked through and closed.
  2. 6Handover.
  3. 7A one-year defects liability period, written into the agreement.
  4. 8DHA completion certificate: issued normally within 20 days if DHA finds no violation, and due within three years of drawing approval (Reg 48(d) and (e), p. 34).

Changes are priced and agreed in writing before they are built.

Materials are bought from listed suppliers who quote against the drawings, the specification and the bill of quantities, and we compare their quotes before we order.

Owners abroad

Building a plaza in Pakistan while you live abroad

We start on WhatsApp, meet you on video at a time that suits your time zone, and send you the same written record an owner on site receives.

  1. 1

    WhatsApp first

    Overseas enquiries are answered on priority, within one working day.

  2. 2

    Video call

    On Google Meet or Zoom, at a time that suits you.

  3. 3

    Brief before the meeting

    We send our commercial project brief form, so the call is about your plot.

  4. 4

    Proposal or quotation

    A design fee proposal within two working days of the meeting; a construction quotation once the drawings and quantities are complete.

  5. 5

    Weekly reports

    While it is built, a weekly progress report from site, and payments only against completed, verified stages.

More on how overseas owners work with us.

From abroad

Plan your plaza from where you live

Tell us where you are and where the plot is. We reply within one working day and set up a video call at a time that suits you.

Where are you based?

Questions

8 Marla commercial construction: questions owners ask

How much does it cost to build an 8 Marla commercial building?

We do not publish a commercial rate per sq ft. We price each plaza from its architectural, structural and MEP drawings, the soil report and a measured bill of quantities. The quantity is large: in DHA Lahore, Phase V onwards, an 8 Marla plot carries up to 12,320 sq ft of covered area.

How long does it take to build an 8 Marla plaza?

A basement, ground floor, mezzanine and four floors takes 12 to 15 months on site with us, from excavation to handover.

How many floors can I build on an 8 Marla commercial plot in DHA Lahore?

From Phase V onwards, a basement, ground floor, mezzanine and four floors, to the 74 ft / 78 ft printed in Regulation 23(e). In Phases I to IV, a basement, ground floor, mezzanine and two floors, to 52 ft (p. 22).

What is the covered area of an 8 Marla commercial building in DHA Lahore?

Up to 12,320 sq ft from Phase V onwards: a basement of up to 1,800 sq ft, a ground floor of 1,800 including the verandah, a 1,170 sq ft mezzanine, four floors of 1,800 and 350 sq ft of roof rooms. In Phases I to IV it comes to up to 8,720 sq ft.

What does grey structure include on a commercial building?

Setting out, excavation, the basement, the RCC frame, slabs and roof, and the masonry and plaster, with conduits and sleeves cast in. Services, facade, lift, generator and finishes sit outside it.

What is shell and core?

The grey structure plus the services, facade, lift, steel emergency stair, generator, common areas and toilets. Tenant floors are handed over open, so each tenant fits out its own space.

Do you build commercial buildings in Islamabad and Rawalpindi?

Yes. We build in Lahore, Islamabad and Rawalpindi, including DHA, CDA sectors and Bahria Town. Each authority sets different floors and coverage for the same plot, so we read the rules for your plot before quoting.

Can you build from drawings another architect prepared?

Yes. We read them before pricing, mark anything missing, non-compliant or clashing, and price the fix into the quotation. If you would prefer those items left out of the price, we will decline the project.

What fire safety does DHA Lahore require in an 8 Marla plaza?

Annex D asks for an iron or steel emergency staircase at all floors and, on each floor, three 6 kg DCP extinguishers, 10 smoke detectors in open areas, three manual call points and three emergency exit lights, with a call point and an exit light in the stair.

Can the upper floors be apartments?

In DHA Lahore only the upper two floors of a commercial building may be converted into residential apartments, and each unit needs its own utility meters and water valve (Regulation 26, p. 24).

Do you take labour-only work or take over a part-built plaza?

No. We work with materials and labour, or turnkey. For a part-built plaza we can review the work for a fee and recommend what to do, but we do not take over the build.

Can I manage the build from abroad?

Yes. We start on WhatsApp, meet on Google Meet or Zoom, and send a weekly progress report from site. Payments fall due only against completed, verified stages.

Start here

Tell us about your 8 Marla commercial plot

Send the plot's society, phase or sector, what you plan to build and the drawings you have. We reply within one working day, and the first consultation is free.

What to send

  • The society, phase or sector, and the plot size
  • The road in front, and whether the plot is on a corner
  • What the building will hold: shops, a showroom, offices or apartments
  • The drawings you have, at any stage
  • The scope you want priced, if you know it

WhatsApp opens with this message ready. Add your plot details before you press send.