Who is the best architect in DHA 11 Rahbar Lahore for 10‑Marla and 1‑Kanal house design?
Choose DHA‑experienced, PCATP‑registered architects with Phase 11 portfolios and in‑house engineering. Avenir integrates architectural design, structural/MEP, interiors, and construction—so submission drawings, BOQs, and site execution stay aligned from day one.
-
How much does an architect cost in DHA 11 Rahbar and what’s included?
Fees vary by scope—concept, submission drawings, working drawings, 3D visuals, interior layouts, and site supervision. Design + Build clients save time and variation costs because design, BOQs, and procurement are coordinated under one contract.
-
What are the DHA Phase 11 (Rahbar) by‑laws (setbacks, covered area, height) and how do they affect my plan?
By‑laws define compulsory open spaces, covered‑area calculations, basement rules, and height measured from the crown of the road. We design submission‑ready plans around these rules to avoid re‑submittals and accelerate approvals.
-
Can I build a basement in DHA 11 Rahbar (5‑, 8‑, 10‑Marla, 1‑Kanal)? What waterproofing is essential?
Yes—subject to DHA undertakings and structural/safety compliance. Execution must include shoring/dewatering strategies, RCC retaining walls, waterproofing membranes, perimeter drains, and inspection checkpoints. We supervise these critical stages and maintain waterproofing checklists.
-
How long does construction take in DHA 11 Rahbar for 10‑Marla and 1‑Kanal houses (with/without basement)?
Typical ranges are 8–12 months for 10‑Marla and 10–14+ months for 1‑Kanal. Timelines depend on approvals, basement complexity, finishes, and material lead times. Our master schedule and weekly reporting keep you informed.
-
Do you design and build commercial projects on CCA corridors in Phase 11 Rahbar?
Yes. We deliver commercial architecture and Design + Build along CCA spines—coordinating FAR, facade controls, signage, services, and parking. Phased construction reduces disruption and de‑risks tenant handovers.
-
Why choose Avenir Developments over separate architect and contractor in DHA 11 Rahbar?
Because a single accountable Design + Build partner reduces change orders, accelerates decisions, and protects budget. We align drawings, BOQs, vendor selections, and site schedules—so decisions happen once, not twice.