Turnkey Design and Build Services in Pakistan

Plan, approve and build your home or commercial project through one coordinated team. Avenir Developments connects architecture, engineering, cost planning, grey structure, finishing and handover so important decisions are resolved before they become expensive site problems. Residential and commercial Design + Build services are available in Lahore, Islamabad and Rawalpindi. Architectural design, interior design and consultancy can also be provided for selected projects across Pakistan, subject to scope and location.

Avenir Developments Turnkey Design & Build Services

Turnkey Design and Build in Lahore, Islamabad and Rawalpindi

One team designs your house or commercial building, takes it through approvals, prices it from its own drawings and builds it. You hold a single appointment. When a drawing and a site condition disagree, the firm that produced both deals with it.

Delivered in
Lahore, Islamabad and Rawalpindi. Design only elsewhere in Pakistan.
Price agreed
At stage six of eight, from an itemised bill of quantities.
Built for
New houses, farmhouses, commercial buildings and fit-outs.

Prefer a form? Start a residential brief or a commercial brief.

AppointmentDesign + BuildStages01 to 080102030405060708BriefOne appointmentHandover

What a Design and Build appointment is

Design and Build means appointing one firm to take a building from the first brief to the day you receive the keys.

On an Avenir project, that firm produces the architectural, structural and MEP (mechanical, electrical and plumbing) drawings, prepares the authority submission, prices construction from its own drawings and builds in Lahore, Islamabad or Rawalpindi. The construction price is agreed once those drawings exist. Interiors, landscaping, specialist systems and authority fees are confirmed in the signed proposal for each project.

Turnkey is the word most people search for, and it answers a different question. Turnkey describes the building at handover, finished and ready to move into. Design and Build describes who carries responsibility before that day.

A contractor can hand over a turnkey house built from another architect’s drawings. That is our construction service, and it suits owners who arrive with a complete drawing set.

Four terms that get mixed up

Design and Build
One firm answerable for design, approvals, pricing and construction.
This page
Turnkey or complete construction
Grey structure and finishing under one contract, handed over ready to occupy, usually from drawings you already hold.
Construction services
Grey structure
The structural shell: foundations, the RCC (reinforced cement concrete) frame, masonry, roof slab and the conduits cast into them.
Grey structure cost guide
Integrated building design
Architecture, structure and MEP drawn as one coordinated set, with no construction attached.
Integrated building design

Eight stages, and what the price means at each one

Most arguments about construction prices in Pakistan begin with a request for a firm number at a stage where only a range can exist. In a Design and Build appointment the number firms up as the drawings do. This is what it means at each stage.

  1. Stage 01

    Discovery call

    Produced

    A written summary of the plot, the brief and the constraints on both.

    The number

    Planning range

    Your city, likely covered area and finishing tier place you inside the ranges on our cost guide. That tells you whether the project is within reach. It is not a price.

  2. Stage 02

    Brief and feasibility

    Produced

    A signed brief, and a note of the covered area, height and basement the byelaws allow on your plot.

    The number

    Budget bracket

    Covered area multiplies every rate on the project, and the byelaws have now capped it.

  3. Stage 03

    Concept design

    Produced

    Plans, elevations and 3D views, reviewed with you and revised.

    The number

    Design-stage estimate

    Floors, basement, spans and façade materials are drawn, so the concept is estimated against your bracket before you approve it.

  4. Stage 04

    Authority submission

    Produced

    Submission drawings lodged with DHA, LDA, CDA, RDA or the society, and replies to any objections.

    The number

    Estimate held or revised

    It holds unless an objection changes the area, the height or the basement. If one does, the estimate is revised with the drawings.

  5. Stage 05

    Working drawings

    Produced

    A coordinated construction set of architectural, structural and MEP drawings, with a schedule of finishes.

    The number

    Quantities countable

    Structural drawings fix the steel and concrete. MEP drawings fix the services, and the schedule of finishes fixes every tile, fitting and door.

  6. Stage 06

    Pricing and agreement

    First figure that is a price

    Produced

    An itemised bill of quantities, meaning every item of work measured and priced, plus written exclusions, a payment schedule tied to completed work and the agreement.

    The number

    Contract sum

    If the sum does not work for you, the appointment can end here. The drawings are prepared to be built by any competent contractor.

  7. Stage 07

    Construction

    Produced

    Records made before steel, waterproofing and concealed services are covered, and a running register of variations.

    The number

    Contract sum plus approved variations

    A change is priced and approved in writing before the work is done, then added to the register.

  8. Stage 08

    Handover

    Produced

    Testing, a closed snag list of the defects found at final inspection, completion documents and warranties for installed equipment.

    The number

    Final account

    Nothing appears in it that you did not approve during construction.

Owners living abroad go through the same eight stages. How each stage runs from overseas, including power of attorney and payments, is set out on the overseas clients page. Current planning ranges are on the house construction cost guide.

Where the money goes when design and construction are separate

Architecture, structure and services are usually drawn by different people, at different times, to different deadlines. Those drawings then have to agree at every beam, shaft, drain run and ceiling junction.

Where they do not, the clash shows up on site. Under separate appointments it becomes a question of whose scope it fell into. The architect points to the structural drawing, the contractor points to the architectural one, and the correction reaches you as an extra, usually once the frame is up and changing firms is no longer realistic.

One appointment removes the question. The firm that drew the beam also drew the duct, so the clash is resolved inside the appointment instead of being argued between two.

Four clashes we check for before anything is cast

  1. A beam crosses the route of a supply duct, and the false ceiling has to drop to hide it.
  2. A bathroom sits above the lounge with no lowered slab, so its drains have no fall.
  3. A column from the structural grid lands inside the car porch opening shown on the plan.
  4. An air-conditioning drain meets a beam that has no sleeve cast through it.
1234
From Brief to Handover

The Three-Stage Avenir Process

A coordinated design and construction pathway that moves your project from an approval-aware concept to a completed, usable property.

Architectural Design and Building Approvals

Objective

Convert your requirements into an approval-aware, coordinated and buildable project definition.

Main activities
Consultation and brief, site or plot assessment, byelaw review, concept planning, floor plans, exterior design, 3D visualisation, structural and MEP direction, submission drawings, construction documentation and early budgeting.
Main deliverables
Approved concept, coordinated design package, authority submission documents and a clearer basis for pricing.
Your decisions
Room requirements, lifestyle or operational needs, design direction, budget range, key materials, scope and major alternatives.
Quality checks
Plot data, dimensions, setbacks, circulation, buildability, structure and MEP interfaces, and drawing coordination according to scope.
Dependencies
Ownership and plot documents, site information, authority rules, client feedback, specialist inputs and approval comments.

Grey Structure Works

Objective

Execute the structural shell and embedded services against approved drawings, agreed specifications and defined inspection points.

Main activities
Activities may include mobilisation, setting out, excavation, foundations, anti-termite treatment, RCC works, masonry, plaster, embedded plumbing and electrical works, underground and overhead tanks, roof treatment and boundary works.
Main deliverables
Completed structural stages, measurement records, site progress information and documented variations according to contract.
Your decisions
Approved contract, material specifications, change requests, nominated items and timely release of required information or payments.
Quality checks
Checks may include drawing verification, material approvals, reinforcement and formwork checks, concrete-related controls, levels, dimensions, masonry and concealed-service inspections according to the project plan.
Dependencies
Soil and site conditions, approved structural drawings, utilities, access, weather, procurement, labour availability and timely decisions.

Finishing Works and Handover

Objective

Complete the architectural, interior and service finishes to the approved material direction and prepare the property for use.

Main activities
Activities may include flooring, wall finishes, ceilings, paint, doors and windows, kitchens, wardrobes, electrical fixtures, sanitary fixtures, joinery, interior details, external works, testing and snagging.
Main deliverables
Approved samples and installations, completion records, snag list, rectification and handover documents according to contract.
Your decisions
Finish selections, samples, brands, colours, fixtures, appliances, loose furniture and any upgrades.
Quality checks
Samples, alignment, levels, installation details, service testing, finish consistency, snagging and closure.
Dependencies
Approved material schedule, procurement lead times, availability, completed concealed works, dry conditions and decision deadlines.

Tell us the plot and where the design stands

City, society, plot size and whether anything is drawn yet. That is enough for us to say which stage your project starts at, and what kind of figure is possible at that point.

Your message will ask for

  • City
  • Society and phase
  • Plot size
  • Drawings so far
Review My Plot Requirements

Opens WhatsApp with these four fields ready to fill.

What sits inside the appointment

The appointment is assembled from six parts. Under each, the second line lists what is confirmed in writing for your project instead of assumed. Those are the items that start disagreements when nobody wrote them down.

  • Brief and feasibility

    Inside the appointment

    Plot and byelaw review, a written brief, and the covered area, height and basement your plot allows.

    Confirmed for your project

    Measured survey and soil investigation.

  • Architecture and approvals

    Inside the appointment

    Concept plans, elevations and 3D views, submission drawings, and replies to authority objections.

    Confirmed for your project

    Number of concept options, renders and revision rounds. Authority fees, NOCs and society charges.

  • Structure and MEP

    Inside the appointment

    Structural design, electrical and plumbing design, and the coordination of both with the architecture.

    Confirmed for your project

    Ducted or VRF air-conditioning design, fire systems, lifts, solar and home automation.

  • Interior design

    Inside the appointment

    Space planning, ceiling, lighting and tile layouts, and joinery drawings where interiors are in scope.

    Confirmed for your project

    Loose furniture, curtains, appliances, styling and imported items.

  • Construction

    Inside the appointment

    Grey structure and finishing to the bill of quantities and schedule of finishes, with procurement and site supervision.

    Confirmed for your project

    Boundary wall, gate and external works, landscaping, basement dewatering, and anything you supply yourself.

  • Handover

    Inside the appointment

    Testing, snagging, completion documents and a defects period.

    Confirmed for your project

    How detailed the as-built drawings are, equipment warranty terms, and the completion certificate application.

The construction scope is broken down item by item, including where plaster and the boundary wall sit, on our construction services page.

Decisions that get expensive once they are built in

A decision is cheap while it is still a line on a drawing. Once it is cast into a slab or chased into a wall, reversing it means breaking something. These are the latest sensible stages for the decisions that come up on nearly every house, numbered to match the eight stages above.

DecisionLatest sensible stageWhy it cannot wait
Basement or no basement02 Brief and feasibilityIt changes excavation depth, retaining walls and waterproofing, and whether the approval allows it at all.
Number of storeys, mumty and total covered area03 Concept designThese fix the submission drawings. Changing them later means submitting again.
Staircase and lift position03 Concept designThe structural grid is planned around them.
Wide spans, cantilevers and double-height spaces03 Concept designThey set beam depths and steel tonnage across the frame.
Bathrooms or kitchens above living rooms05 Working drawingsA lowered slab or a raised floor has to be designed in to give the drains their fall.
Air-conditioning: split, ducted or VRF05 Working drawingsSleeves through beams, ceiling voids and condensate drains are planned before the slab is cast.
Solar, UPS and backup power05 Working drawingsConduit routes, distribution boards and roof loading depend on the choice.
Window sizes and frame system07 Before masonryOpenings and lintels are built to the frame size.
Kitchen layout and appliance positions07 Before first fixWater, drainage, gas and power points are set into the walls.
Floor finish: tile, marble or wood07 Before screedsBuild-up thickness changes finished floor levels and door heights.
Paint colours, curtains and loose furniture07 During finishingCheap to change late. Leave these until you can stand in the rooms.

First fix is the pipework, conduits and boxes built into walls and slabs before plaster. Second fix is the visible fittings that go in afterwards.

What Design and Build gives up, and what protects you

If you already work with an architect you trust and know two contractors you would happily set against each other, an open tender may get you a sharper price than any single appointment. For everyone else the choice comes down to which risks you would rather carry. Design and Build asks you to accept three.

No independent designer checking the builder

What you give up

Under separate appointments, your architect can inspect the contractor’s work for you. In Design and Build that check sits inside one firm.

What protects you

Hold-point records. Reinforcement, waterproofing and concealed services are checked against the drawings and photographed before they are covered, and those records can be reviewed by any engineer you appoint.

Less competition on price

What you give up

The builder was not chosen by open tender, so no second bid is holding the rates down.

What protects you

An itemised bill of quantities, priced from drawings you hold, which a quantity surveyor can check line by line. If the contract sum does not work, the appointment can stop at stage six.

Design choices made by the firm that builds

What you give up

A builder could, in principle, draw what is easiest to build rather than what suits your family or your tenants.

What protects you

A brief you sign before concept design. After that, any decision affecting cost or appearance comes to you with the options and the cost difference set out.

Six questions to put to any Design and Build firm

  • At which stage do you give a contract sum, and which drawings is it priced from?
  • Will I receive the itemised bill of quantities, or a single lump sum?
  • If I stop after the design, what can I do with the drawings, and which fees fall due?
  • Who inspects reinforcement, waterproofing and concealed services before they are covered, and what record do I receive?
  • How is a design change priced once construction has started?
  • Which items are confirmed project by project rather than included?

What happens after you send a message

  1. You send the city, the plot size and a line about what you want to build.
  2. We reply with the stage your project starts at, and the documents that would help, such as the plot file or any drawings you already have.
  3. A discovery call follows. If the project goes ahead, the plot is checked against its byelaws before anyone starts drawing.
Discuss Design + Build on WhatsApp

Opens WhatsApp with a short message ready to send.

Who it suits, and when to appoint something else

Design and Build usually suits

Appoint something else if

  • You already hold a complete, coordinated drawing set.Construction services
  • You want the design and approvals settled now, and to tender the build yourself.Architecture services
  • Several consultants are involved and their drawings disagree.Integrated building design
  • You own land and have not yet decided what to build.Project consultancy
  • You want labour-only rates, repairs or a single-room renovation.We do not take this work, and a local contractor will serve you faster.

Where Avenir delivers Design and Build

Design and Build, construction and site supervision run in Lahore, Islamabad and Rawalpindi only. The limit is deliberate. Supervision means our engineers on your plot through the working week, which is realistic only within reach of our two offices.

Architecture, interior design and 3D visualisation are delivered remotely to the rest of Pakistan and to clients abroad. Check which services apply to your city.

The approval interface

Covered area, height, setbacks, basement and mumty allowances are set by each authority, and they vary by phase, plot category and edition date. Your plot is checked against the current instrument before design starts, because a rule that held in one phase or one year proves nothing about the next.

Our reference pages carry the detail: DHA Lahore building byelaws and map approval, and CDA and RDA building byelaws for Islamabad and Rawalpindi. The approval decision stays with the authority. Authority fees, NOCs and society charges are listed separately in the proposal.

Questions about Design and Build

Questions about construction scope, plaster, bills of quantities and variations are answered on the construction services page.

Questions about power of attorney, remittances and working across time zones are answered on the overseas clients page.

What does Design and Build mean for a house in Pakistan?

It means appointing one firm for the whole project: the brief, architectural design, structural and MEP drawings, authority submission, pricing and construction. Avenir Developments delivers Design and Build in Lahore, Islamabad and Rawalpindi, and agrees the construction price from a bill of quantities once the drawings are complete.

Is Design and Build the same as turnkey construction?

Not quite. Turnkey describes a building handed over finished and ready to occupy. Design and Build describes one firm being responsible for the design as well as the construction. A turnkey house can be built from another architect’s drawings, which is what Avenir’s construction service does. Design and Build starts before any drawing exists.

When do I get a fixed price in a Design and Build appointment?

At stage six of eight, once the architectural, structural and MEP drawings and the schedule of finishes are complete. Before that you receive a planning range, then a budget bracket, then a design-stage estimate. A fixed figure given earlier would have to be corrected later, because the quantities could not yet be counted.

How much does Design and Build cost in Lahore or Islamabad?

The total is the design fee plus the construction cost, and both move with covered area, basement, structure, specification and external works. Current construction ranges for Lahore and Islamabad are published on our house construction cost guide, with a calculator, and design fees are explained on the architecture and design fee page. A project figure follows the drawings.

Can I start with design and decide on construction later?

Yes. You can appoint Avenir for design and approvals, review the drawings and the budget, and then decide whether to continue into construction. The drawings are prepared to be built by any competent contractor, so the choice stays open until you have seen what the building will cost.

Who is responsible if part of the design is hard to build?

In Design and Build the firm that produced the drawings is also building them, so the problem is resolved inside one appointment instead of being argued between an architect and a contractor. The signed agreement sets out how design development is handled. If you change the design yourself after the contract sum is agreed, that change is priced and approved in writing before the work.

Does Avenir handle DHA, LDA, CDA and RDA approvals?

Yes, within the appointment. Avenir prepares and lodges the submission drawings and replies to objections until the authority reaches a decision. Authority fees, NOCs and society charges are confirmed separately. No firm can guarantee an approval or its timing, because that decision belongs to the authority.

Where does Avenir offer Design and Build?

In Lahore, Islamabad and Rawalpindi, including DHA Lahore, Lake City, Bahria Town, DHA Islamabad, Margalla Enclave, Bahria Town Rawalpindi and Gulberg Greens. In other Pakistani cities Avenir provides architecture, interior design and visualisation remotely, without site supervision.

Can Design and Build be used for a commercial building?

Yes. For plazas, offices, apartment buildings and mixed-use projects the method is the same, but more is fixed at concept stage: permissible use, FAR, parking, fire escape routes and the lift core. Those decisions are tested against the approving authority’s rules and your opening date before detailed design begins.

I live abroad. Can I appoint Design and Build without coming to Pakistan?

Yes. Discovery, the brief, design reviews, drawings and pricing can all be completed from abroad. Acts that need a signature in Pakistan, such as the authority submission and the construction agreement, are usually handled through a special power of attorney limited to construction matters. The overseas clients page sets out the full sequence.

How long does a Design and Build project take?

It depends on covered area, basement, structural complexity, approval timelines and how quickly finishing decisions are made. Design and approvals come before any construction, so plan them back from the date you want to start on site. A programme with stage durations is issued with the construction quotation.

Can Avenir design to a budget I set at the start?

Yes, if the budget is shared at the brief. It is the strongest constraint on the design, and the concept is estimated against it before you approve it. Where the brief and the budget pull apart, you see the trade-offs in covered area, basement or finishing tier while they are still choices on a drawing.

Send the plot before you ask for a rate

Nobody will ask you to commit to construction before your drawings are priced.

Send the city, the plot size and whatever you have so far. We will tell you where the project starts and what kind of figure is possible at that stage.

Speak With the Avenir Team on WhatsApp

Prefer to write it down first? Start a residential brief or a commercial brief.