DHA Phase 9 Prism, Lahore
DHA Lahore handed over 5,826 residential plots in Phase 9 Prism in May 2026, and every one of those owners is now inside a three-year window to start building. Avenir Developments designs, submits and builds houses in Prism from 5 Marla to 2 Kanal, and commercial buildings on the 2, 4 and 10 Marla plots DHA has released. We work from your demarcated site plan and the current DHA Lahore byelaws, so the drawings that go in are the drawings that come back approved.
Discuss My Project on WhatsApp Design first.
Possession
In sectors where DHA Lahore has opened possession, yes. Handovers began across two ceremonies in May 2026.
Sector A and Commercial Zone (A&C) opened on 5 May 2026, releasing 705 plots of 1 Kanal, 38 of 2 Kanal and 150 commercial plots. Sectors J, L and M and Commercial Zone (L&M) followed on 18 May 2026, releasing a further 5,083 residential plots and 50 commercial units. Possession had been granted in earlier waves in several other sectors.
Every one of those owners entered a three-year commencement window in the same month, and every one of them needs a registered architect, an original geotechnical report and an approved submission set before a brick is laid. That is not a reason to panic. It is a reason to know where you sit in the queue, and to start the parts of the work that do not need possession.
Announcements are made sector by sector, and sometimes plot by plot. A sector being named does not mean every plot in it carries the same status, so confirm your own plot number with DHA Lahore Building Control before you commit to a programme. We check it at the first conversation, which is free.
Source: DHA Lahore, Possession Opening Ceremony Phase IX Prism, dhalahore.org, published 20 May 2026. Status reviewed Q4 2026.
The full document list and the approval sequence are on our DHA Lahore building byelaws reference, cited to regulation and printed page.
Where you stand
Possession was released in waves, not all at once. The right first question is not what you can build but what has been released on your street.
Schematic, not a survey map. Sector tiles are arranged alphabetically, not by position, and the roads show orientation only. Sector dates for A, J, L and M and the two commercial zones come from DHA Lahore’s possession notification of 20 May 2026; other sectors are compiled from market reporting. Reviewed Q4 2026.
Four sectors were opened by DHA in May 2026 with 5,826 residential and 200 commercial plots. Seven are reported as earlier waves. Five are awaiting an announcement, and design can begin in all of them.
Tap a sector letter. The button below changes to carry your sector into the WhatsApp message.
705 plots of 1 Kanal and 38 of 2 Kanal, with Commercial Zone (A&C): 13 plots of 10 Marla, 123 of 4 Marla and 14 of 2 Marla in Sector A.
Three-year commencement window running from May 2026. Avenir has designed a 1 Kanal house in this sector.
No DHA possession notice for this sector is on record here.
Design, the brief and the geotechnical report can all start now. Only the site plan needs possession.
96 commercial plots of 4 Marla released in Sector C on 5 May 2026. Residential possession is reported from earlier waves and is not confirmed against a DHA document here.
Confirm your plot number with Building Control before you commission drawings.
Reported in market sources, not confirmed against a DHA document on this page.
Neighbouring built houses make levels and boundary decisions easier. Confirm your plot number with Building Control.
Reported in market sources, not confirmed against a DHA document on this page.
Neighbouring built houses make levels and boundary decisions easier. Confirm your plot number with Building Control.
Reported in market sources, not confirmed against a DHA document on this page.
Neighbouring built houses make levels and boundary decisions easier. Confirm your plot number with Building Control.
Reported in market sources, not confirmed against a DHA document on this page.
Neighbouring built houses make levels and boundary decisions easier. Confirm your plot number with Building Control.
No DHA possession notice for this sector is on record here.
Design, the brief and the geotechnical report can all start now. Only the site plan needs possession.
2,472 plots of 5 Marla and 275 of 10 Marla.
The 5 Marla sector of Prism. Expect busy streets and shared access to materials as building starts.
No DHA possession notice for this sector is on record here.
Design, the brief and the geotechnical report can all start now. Only the site plan needs possession.
829 plots of 1 Kanal and 464 of 10 Marla, with Commercial Zone (L&M) released alongside.
Three-year commencement window running from May 2026.
1,043 plots of 1 Kanal, with Commercial Zone (L&M) released alongside.
The largest single release of 1 Kanal plots in Prism. Three-year window running from May 2026.
No DHA possession notice for this sector is on record here.
Design, the brief and the geotechnical report can all start now. Only the site plan needs possession.
No DHA possession notice for this sector is on record here.
Design, the brief and the geotechnical report can all start now. Only the site plan needs possession.
Reported in market sources, not confirmed against a DHA document on this page.
Neighbouring built houses make levels and boundary decisions easier. Confirm your plot number with Building Control.
Reported in market sources, not confirmed against a DHA document on this page.
Neighbouring built houses make levels and boundary decisions easier. Confirm your plot number with Building Control.
One message, your sector already in it. We reply within one working day, and the first consultation is free.
What the byelaws permit
Height, coverage and clear spaces come from the 2026 edition of the DHA Lahore regulations, not from the figures that circulate on property portals.
The governing document is the Defence Housing Authority Construction & Development Regulations 2014, as consolidated in the Building Control 2026 edition published by DHA Lahore. Under Regulation 23(a) the maximum height of a residential building in any phase is 39 feet from the crown of the road. A building constructed without a mumtee and parapet is limited to 32 feet, and in that case a second floor is not permitted. Permissible first-floor covered area is set by plot size, not by a single percentage.
Plot sizes on this page use the modern standard of 1 Marla = 225 sq ft, which is the basis DHA’s own plot dimensions follow.
Much published guidance on DHA Lahore quotes a 35-foot height limit and a flat 75% first-floor coverage rule. Neither matches the edition in force. The height limit is 39 feet, and first-floor coverage is 100% on 5 Marla, 82% on 7 to 10 Marla, 80% on 1 Kanal and 78% on 2 Kanal. A design prepared for a Prism plot against the older figures leaves permissible area unused.
| Plot | Dimensions | First floor | Front | Rear | Sides |
|---|---|---|---|---|---|
| 2 Kanal | 75 × 120 ft or 100 × 90 ft | 78% of ground floor | 20 ft 9 in or 15 ft 9 in | 8 ft 4½ in | 5 ft 4½ in |
| 1 Kanal | 50 × 90 ft | 80% of ground floor | 15 ft 9 in | 5 ft 4½ in | 5 ft 4½ in |
| 10 Marla | 35 × 65 ft | 82% of ground floor | 10 ft 9 in | 5 ft 4½ in | 5 ft 4½ in |
| 8 Marla | 30 × 60 ft | 82% of ground floor | 8 ft | 4 ft | 4 ft |
| 5 Marla | 25 × 45 ft | 100% of ground floor | 5 ft | 3 ft | 3 ft |
A single-storey basement is permitted at up to 100% of the allowable covered area, porch excluded. No clear space on any side may be less than 3 ft 9 in. On a corner plot taken frontage-long, the front clear space must be left on both road sides. Regulation 22(a), 22(b), 22(c) and 27(a)(3), printed pages 21 and 24, Building Control 2026 edition. Every figure is cited to regulation and printed page on our DHA Lahore building byelaws reference. Reviewed Q4 2026.
A 1 Kanal plot at 50 by 90 feet. The clear spaces are measured to include the boundary wall, leaving a buildable ground floor of 39 ft 3 in by 68 ft 10½ in. The first floor is capped at 80% of that, so about 4,866 sq ft across two floors before a basement.
Deadlines
One clock starts at possession. The other starts at approval. Owners who approve early and build late get caught between them.
Counted from the date your area was opened for possession or construction. After that a non-construction penalty applies, as prescribed. Regulation 17(a).
Your approved drawing is valid for two years, and the building must be completed within two years of approval. After that, fresh approval is required. Regulation 17(b) and (c).
The rule is not a flat 24-month extension. Where the plot was sold within three years of possession opening, the penalty is not levied until three years from the opening of possession or 24 months from the date of transfer, whichever is later. Where it was sold after that three-year window had already run, a 24-month grace period applies from the date of transfer. Confirm your own dates against your transfer letter. Regulation 13(d) and (e), printed page 17.
The trap sits between the two clocks. Approve drawings long before you intend to build and the approval can lapse before the house is finished, which means scrutiny again for a design you had already paid to have approved. The sequence that works is brief and budget first, approval second, then continuous construction.
Regulation 17(a) to (c), printed page 19. Regulation 13(d) and (e), printed page 17. Building Control 2026 edition. Reviewed Q4 2026.
Approval route
Two clocks run on a Prism project and only one of them is DHA’s. Most of the elapsed time is spent before the file reaches the counter.
Steps marked in teal are controlled by DHA. The rest are controlled by you and by us.
By the Building Control Directorate. DHA’s step guide lists eight working days for Phase VIII and IX site plans.
DHAField work and laboratory turnaround. Must be original and valid for one year at submission. Avenir has soil investigation companies on its panel.
The testing firm, coordinated by usThe number of revisions taken before a plan is frozen. This is where most calendar time is lost or saved. Drawn as many times as it needs.
You, with usFour coordinated sets. Fire protection to Annex-C is a scrutinised set, not a fit-out item. A typical house carries more than 100 drawing sheets across the approval and construction sets.
Us21 working days for residential and commercial drawings. Regulation 16(a).
DHAA corrected file is treated as a fresh application and a further 21 working days begins from the date it is lodged. Regulation 16(d).
DHA, on the completeness of the first fileApplied for on the prescribed form once the approved drawings are issued. Regulation 14(p).
You, with our team presentIt is whether you go through them once or twice. A file that comes back with observations costs the redraw plus a fresh 21 working days, and it does so at the point where a start date has usually already been agreed with a contractor. That is the argument for a complete first submission rather than a fast one.
Typical durations on Avenir sites without a basement. The programme for your house is written into the construction agreement against the agreed bill of quantities.
Regulations 14(p), 16(a) and 16(d), printed pages 17 and 19, Building Control 2026 edition. Site plan timing: DHA Lahore step guide for site plan issue, as published; confirm the current figure with Building Control. Reviewed Q4 2026.
Your plot, not the phase
Permissible area follows your dimensions, your frontage and whether you are on a corner. Tell us the plot size and we will return the permitted ground floor envelope and first floor area for that plot, before any fee is discussed.
Send the sector, the plot dimensions in feet and whether it is a corner plot. Replies within one working day. No verdict is given on a plot before the site plan is seen.
Recently introduced
Each one is designed in at drawing stage. Each one is expensive to add after the ceilings are closed.
Annex-C sets detector counts by plot size, with a control panel near the main entry, manual call points and sounders on each floor, emergency lights, extinguishers, fire blankets and heat detectors in kitchen and pantry areas. Fire wiring runs in separate conduits in fire-resistant cable. Wireless detectors are not accepted. On a 1 Kanal house that is over thirty hard-wired devices, a first-fix decision made on the MEP drawings.
At least two cameras at both ends of the front boundary wall, with an additional camera on corner plots covering the side and the junction. Systems run continuously, are maintained, and retain a minimum of ten days of footage for DHA Security or law enforcement on request. Power, data routing and a secure recorder location belong on the drawings, or the boundary wall gets surface trunking later. Regulation 66.
No permanent structure for solar mounting may be integrated into the grey structure. Fixings use stainless steel anchors with the roof waterproofing maintained, with earthing and a lightning arrester. Panels come from a PPIB-approved vendor with a proposal to DHA before installation, Tier 1 equipment, and a wind-velocity certificate at 100 km/h, or 125 to 140 km/h for elevated frames. On 1 Kanal and above the upper edge sits at most 10 ft above the roof. Regulation 67.
| Floor | 5 Marla | 10 Marla | 1 Kanal | 2 Kanal |
|---|---|---|---|---|
| Ground floor | 5 | 9 | 17 | 37 |
| First floor | 6 | 7 | 14 | 29 |
| Basement | 1 per 150 sq ft | 1 per 150 sq ft | 1 per 150 sq ft | 1 per 150 sq ft |
Annex-C, printed page 46. Regulation 66, printed page 41. Regulation 67, printed pages 42 and 43. Building Control 2026 edition. If a fire detection layout is not on the MEP drawings you are shown, ask why before you sign. Reviewed Q4 2026.
House design by plot size
The byelaws give each plot size a different envelope, and the May 2026 handovers gave each sector a different mix.
Render
Render
Concept sketch2,577 of the plots DHA handed over in May 2026 are 1 Kanal, which makes the 50 by 90 ft plot the core of Prism. A single-storey basement is permitted at up to 100% of the allowable covered area, which takes the ceiling to roughly 7,500 sq ft. Any covered-area figure above about 4,850 sq ft on a 1 Kanal plot is describing a basement, and should say so.
Good 1 Kanal planning resolves formal and family zones, guest privacy, two-car parking, staff circulation and the kitchen before the elevation is settled. The 80% rule leaves about 540 sq ft of ground-floor roof that cannot be built on, and no balcony is permitted over a clear space, so that area becomes a terrace, a courtyard void or a double-height volume, and each changes the plan beneath it.
1 Kanal house designOn a 100 by 90 ft plot the first floor is capped at 78% of the ground floor. Our 2 Kanal house in Phase 9 Prism runs to 9,400 sq ft including its basement, which is a useful benchmark for owners who have been quoted larger figures without one. Estate-level planning matters here: arrival sequence, formal entertaining, family privacy, guest suites and staff movement, with an elevation that holds together at a larger scale.
2 Kanal house design739 plots of 10 Marla came with the May 2026 handovers. At 35 by 65 ft with an 82% first floor, the plan has to earn every square foot: staircase placement, light wells, parking and service routes decide the house. Prism’s 10 Marla plots carry the same fire detection and CCTV requirements as larger plots, scaled by Annex-C.
10 Marla house designSector J alone released 2,472 plots of 5 Marla. The first floor may equal the ground floor, which is the one plot size where the byelaws give the whole footprint twice. Privacy between close neighbours, a stair that does not consume the plan, and a compact MEP layout are what separate a good 5 Marla house from an ordinary one.
5 Marla house designPlot counts: DHA Lahore possession notification, 20 May 2026. Envelope figures: Regulation 22(a) and 27(a)(3), printed pages 21 and 24, reconciled with the DHA Lahore byelaws reference. Figures are gross envelope areas before wall thickness, porch, projections and any sunken area; your entitlement follows your demarcated site plan. Reviewed Q4 2026.
Commercial plots
DHA released 200 commercial plots across Sectors A, C, L and M in May 2026, in 2, 4 and 10 Marla sizes.
A commercial plot is a different problem from a house, and the brief starts in a different place. The governing variables are parking provision, floor-plate efficiency and the circulation that separates customer access from service access. Those three decide the rentable area, and they are settled in the first week of planning or not at all.
A commercial building also carries a heavier certification burden. Structural stability certification for a multi-storey commercial building must come from a PEC-registered consulting engineer holding an M.Sc in Structures with at least five years’ experience, a narrower qualification than the registered structural engineer sufficient for a house. Regulation 15(t).
We design and build commercial buildings at these plot sizes. Our commercial building design and commercial construction pages set out the scope.
Plot counts: DHA Lahore, Possession Opening Ceremony Phase IX Prism, 20 May 2026. Regulation 15(t), printed page 18, Building Control 2026 edition. Reviewed Q4 2026.
Programme
Tell us where your plot stands and we will work backwards from it: geotechnical report, design, coordination, scrutiny, demarcation and the start on site, with the DHA-controlled steps separated from the ones we control.
If your drawings were prepared by another office, we review them against the 2026 edition before anything is priced, and we price any correction into the quotation rather than charging for it on site.
Cost planning
Construction cost is driven by covered area, foundation type, specification and site conditions, not by the plot size on its own.
| Plot | Covered area assumed | Grey structure | Complete house |
|---|---|---|---|
| 1 Kanal | 5,500 to 6,300 sq ft | PKR 3,500 per sq ft PKR 19.2 to 22.0 million | PKR 7,950 per sq ft PKR 43.7 to 50.1 million |
| 2 Kanal | 10,000 to 11,500 sq ft | PKR 3,640 per sq ft PKR 36.4 to 41.8 million | PKR 8,310 per sq ft PKR 83.1 to 95.6 million |
Planning figures, not a quotation. Lahore, DHA phases, material plus labour, Standard specification, building only. Grey structure includes internal and external plaster. The boundary wall, gate columns, water and septic tanks, parapets and external works are priced per project and added to the lump sum, not to the per sq ft rate. On a 1 Kanal plot the covered area above about 5,166 sq ft is basement. Rates reviewed quarterly by the Avenir Developments market intelligence team. Last review Q4 2026.
For a project-specific figure the order is concept design, outline specification, then the bill of quantities. A rate quoted before drawings exist is an opening position, not a budget. When you compare quotations, compare bills of quantities, because two rates ten per cent apart routinely describe scopes thirty per cent apart.
What Avenir delivers in Prism
Appoint us for one stage or for the whole project. The scope below is what we provide; the exact deliverable list is confirmed in writing before work starts.
Site plan and levels review, brief, concept, 3D elevation, working drawings, structural coordination against the geotechnical report, MEP and fire drawings, and the coordinated submission package. The aim is a house that is buildable at your budget and clears scrutiny without redesign, because every resubmission restarts the 21 working days.
Structural design from your actual bearing capacity rather than an assumed value, by in-house and appointed PEC engineers, and MEP drawings that include the Annex-C fire detection layout and the CCTV provision. Service routes, ceiling heights and shaft positions are settled before a brick is laid, with BIM used for coordination.
Bill of quantities, procurement and material approvals, grey structure, MEP first and second fix, finishing, snagging and handover. Payments fall due against completed, verified stages. The five DHA inspection stages are managed, a written weekly progress record goes to every client, the snag list is closed before handover, and a one-year defects liability period follows it.
Architecture, approvals, engineering, bill of quantities and construction under one agreement. The value is cost input at design stage, fewer gaps between drawing sets, and one party answerable when a site decision has to be made. DHA inspects; it does not supervise your build. Under the regulations that responsibility sits with the owner and the appointed architects and engineers.
Render
Render
RenderImages are renders of designed houses unless labelled as photographs. Avenir’s registrations and the names of the architect and engineer who will sign your set are given in writing on request. Approvals are obtained to each authority’s byelaws; the Authority may still require modification even where a design does not contravene them, Regulation 16(c).
Overseas owners
The process is built for owners who are not in Lahore, from the first message to the completion certificate.
A large share of Prism plots are held by overseas Pakistanis, and many of those owners are now inside a three-year commencement window they cannot easily monitor from the UK, the Gulf, North America or Australia. Remote construction works when decisions, records and accountability are structured. It fails when it depends on calls with several people on site.
Our overseas clients page sets out the full process, including how the first consultation and the design brief work by video.
Overseas owners
Tell us where you are and what stage your plot is at. We will set out what can be handled remotely, what needs an attorney holder at the counter, and when a video review falls in the programme.
Replies within one working day on WhatsApp, then a Google Meet or Zoom call at your local time.
Before you appoint anyone
Elevation style is the easiest thing to compare between firms and the least predictive of how the project will run. Four things are checkable before you pay a fee.
The regulations require the building plan to be signed by an architect registered with the Pakistan Council of Architects & Town Planners and registered with DHA. PCATP registration alone is not sufficient, and this is the point most often discovered at the counter. Ask any firm to name the enlisted architect and the registered structural engineer who will sign your set, then check both names against DHA’s current published lists yourself.
Regulation 15, printed page 18. Definition 76, printed page 10.
Permissible area follows your demarcated site plan, your plot dimensions and whether you are on a corner. A firm quoting a covered-area figure before it has seen those is guessing, and the guess is usually generous. On a corner plot taken frontage-long, the front clear space is left on both road sides, which changes the envelope and has to be decided at concept.
Regulation 22(c), printed page 21.
Fire protection is one of the drawing sets DHA scrutinises. Annex-C sets detector counts by plot size, 17 at ground floor and 14 at first floor on a 1 Kanal house, all hard-wired in fire-resistant cable in separate conduits. CCTV at both ends of the front boundary wall needs power and data in the wall. Both are grey-structure decisions. A drawing set without them is not a complete submission.
Regulation 16(a)(3), printed page 19. Annex-C, printed page 46. Regulation 66, printed page 41.
A per-square-foot rate quoted before drawings exist describes a scope nobody has written down yet. Compare bills of quantities, not rates. And ask what happens when the drawings contain a mistake: at Avenir, errors, missing detail and coordination clashes in drawings handed to us are flagged and priced into the quotation, not charged as extras during construction. Where a client wants those items priced as if they do not exist so the number matches a cheaper quote, we decline the project.
We publish the byelaws we work to, cited to regulation and printed page, on our DHA Lahore byelaws reference, so a figure we give you can be checked against the source rather than taken on trust. We ask for the site plan, sector and plot number before discussing area. Fire protection and CCTV are drawn as part of the MEP set, not added later. We work on bill-of-quantities-based material-plus-labour and Design + Build agreements, not labour-only contracts. Our registrations, and the names of the architect and engineer who will sign your set, are given in writing on request.
What we do not claim: no guaranteed approval, and no influence with DHA. The Authority may reject a plan or require modification even where the design does not contravene the regulations, Regulation 16(c). Our contribution is a complete and compliant set, submitted correctly the first time, and a full response to anything the Authority raises.
Questions
In sectors where DHA Lahore has opened possession, yes. Sector A and Commercial Zone (A&C) opened on 5 May 2026 and Sectors J, L and M with Commercial Zone (L&M) on 18 May 2026, handing over 5,826 residential and 200 commercial plots in total. Possession had been granted earlier in several other sectors. Before work begins you need possession and a site plan in your name, an original geotechnical report, a coordinated submission set signed by an architect registered with PCATP and DHA, and DHA’s approved drawings. Confirm your own plot number with Building Control, because announcements are sometimes made plot by plot.
DHA’s May 2026 handovers released 705 plots of 1 Kanal in Sector A, 829 in Sector L and 1,043 in Sector M, which is 2,577 of the 5,826 residential plots handed over that month. Sector J was released as 5 and 10 Marla plots. Plot mix in the earlier-wave sectors is not confirmed against a DHA document on this page.
No. They are two separate DHA Lahore developments with different maps, plot sizes, possession positions and build contexts. Prism is the larger master-planned phase across sixteen sectors, A to R, with major commercial zones; Phase 9 Town is a separate and more compact scheme beside it. DHA Gandhara in Islamabad is also marketed as DHA Phase 9 Islamabad and is a different city. Confirm the phase, sector and plot number from your allotment or transfer letter before commissioning drawings.
Under the Defence Housing Authority Construction & Development Regulations 2014, Building Control 2026 edition, the maximum height of a residential building in any DHA Lahore phase is 39 feet from the crown of the road. Where a building has no mumtee and parapet the limit is 32 feet, and in that case a second floor is not permitted. The overhead water tank sits inside the 39 feet and is the element that most often breaks the limit. A lift machine room of up to 75 sq ft may reach 45 feet. Guidance still quoting 35 feet does not match the current edition. Regulation 23(a) and 33(a).
A 1 Kanal plot is 50 ft by 90 ft. After clear spaces of 15 ft 9 in at the front and 5 ft 4½ in at the rear and each side, measured to include the boundary wall, the buildable ground floor is 39 ft 3 in by 68 ft 10½ in, about 2,703 sq ft. The first floor is permitted at 80% of the ground floor, about 2,163 sq ft, so about 4,866 sq ft across two floors. A single-storey basement is permitted at up to 100% of the allowable covered area, porch excluded, taking the total to roughly 7,500 sq ft. These are gross envelope areas; your entitlement follows your demarcated site plan. Regulation 22(a) and 27(a)(3).
DHA Lahore scrutinises residential and commercial drawings within 21 working days. If observations are raised, the corrected resubmission is treated as a fresh application and a further 21 working days begins from the date it is lodged. DHA’s step guide lists eight working days for a Phase IX site plan, which is needed before the file can be lodged. Regulation 16(a) and 16(d).
Three years from the date your area was opened for possession or construction, under Regulation 17(a). If you bought the plot within three years of possession opening, the penalty is not levied until three years from the opening of possession or 24 months from transfer, whichever is later; bought after that window, a 24-month grace period applies from transfer, Regulation 13(d) and (e). Separately, an approved drawing is valid for two years and the building must be completed within two years of approval. Confirm your own dates with DHA.
On the Q4 2026 rate set, a 1 Kanal house in a DHA Lahore phase at Standard specification is about PKR 3,500 per sq ft for grey structure and PKR 7,950 per sq ft complete, which at 5,500 to 6,300 sq ft of covered area is roughly PKR 19.2 to 22.0 million for grey structure and PKR 43.7 to 50.1 million complete. The boundary wall, gate columns, tanks, parapets and external works are added as a lump sum per project. These are planning figures; a quotation follows the concept design and the bill of quantities.
On Avenir sites, a 1 Kanal grey structure without a basement typically takes six to seven months, a complete 1 Kanal house eleven to twelve months, a complete 10 Marla house six to seven months and a complete 2 Kanal house fifteen to sixteen months. The programme for your house is written into the construction agreement against the agreed bill of quantities. Add the design, geotechnical and approval stages in front of it.
Yes. An original geotechnical report, valid for one year, forms part of the drawing submission file under the 2026 regulations, and it determines the foundation design and therefore a significant part of the structural budget. Prism covers a very large area and bearing capacity is not uniform across it. Commission the report before the concept is frozen; Avenir has soil investigation companies on its panel. Regulation 14.
Building plans must be signed by an architect registered with the Pakistan Council of Architects & Town Planners and registered with DHA, and residential structural stability certification must come from a registered structural engineer. DHA publishes current lists. Before paying any fee, ask the firm you are considering to name the architect and structural engineer who will sign your drawings, and check those names against DHA’s list. Avenir gives its registrations in writing on request. Regulation 15 and Definition 76.
No, and the sequencing usually favours starting. Design, the brief, the geotechnical report and drawing coordination all happen before anything is lodged with DHA, and none of them needs possession. What needs possession is the site plan issued in your name. Owners in sectors approaching possession can have a coordinated set ready to lodge in the week the site plan is issued, rather than beginning a three to four month design process from that date. If your sector is years away, we will tell you to wait.
Yes. For suitable projects we provide architecture, approvals, engineering, bill of quantities, construction, interiors and handover under one agreement, with video reviews at concept, drawing freeze, grey structure completion and before finishing selections are locked, documented material approvals, a written weekly progress record, payments against verified stages, a written variation record, and evidence at each of the five DHA inspection stages. DHA permits a special power of attorney for the counter. Overseas enquiries are answered on WhatsApp within one working day.
Every answer carries the regulation it rests on. Building Control 2026 edition of the DHA Lahore regulations; DHA Lahore possession notification of 20 May 2026; Avenir rate set and site programmes, Q4 2026.
Start here
That is enough for a specific answer rather than a general one. If your allotment or transfer letter is to hand, send a photograph of it and we will confirm the phase and sector before anything else is discussed.
Answered by our client relations team within one working day. The first consultation is free. Both offices open Monday to Saturday, 10:00 to 19:00.
Avenir Developments, 139, CCA, DHA Phase 5, Lahore, 54000. 101, Luxus Mall, Gulberg Greens, Islamabad, 44000. WhatsApp and voice +92 300 1101807. email@avenirdevelopments.com. Architecture, interior design, construction and Design + Build for DHA Phase 9 Prism and every phase of DHA Lahore; construction in Lahore, Islamabad and Rawalpindi.