For owners abroad

Design and Build a House in Pakistan From Abroad

Avenir Developments designs, obtains approvals for and builds houses in Lahore, Islamabad and Rawalpindi for Pakistanis living in the UK, the USA, the UAE and elsewhere. One team from the first drawing to handover, no price until the drawings exist, and payments that fall due against completed, verified stages.

  • First meeting by video call, from wherever you are
  • Drawings and a bill of quantities before any figure
  • Payments that fall due against completed, verified stages
  • A progress report every week while the site runs

Replies within one working day. The first consultation is free.

Discuss My Project on WhatsApp

Design first. Build once.

Arrival court of the 10 acre Spanish style farmhouse in Chak Shahzad, Islamabad, designed and being built by Avenir Developments
3D render10 acre farmhouse, Chak Shahzad, Islamabad. Design + Build by Avenir, on site in Q4 2026.
Drawn, then built
Concept sketch of the arrival front of the Chak Shahzad farmhouse, with the covered drop-off
Concept sketchThe same arrival front as a concept sketch, before the drawings.

Drawn as many times as it needs.The owner of this estate reviewed it as a sketch, then as plans, elevations and 3D views, before a single figure was put to it. The site in Islamabad is now at grey structure, and every stage is checked against those drawings before the next begins.

The direct answer

How do overseas Pakistanis build a house in Pakistan?

Building from abroad works when three things are fixed before construction begins. Progress reports, site photographs and video calls are useful additions. None of them protects you on its own.

  • A complete drawing set

    Architecture, structure and services, coordinated into one construction set. A drawing that does not exist cannot be priced, checked or built to.

  • A bill of quantities that prices those drawings

    Quantities measured from the set, with the scope, inclusions and exclusions written down. Quotations differ in what they leave out, not in the headline rate.

  • Payments tied to verified stages

    Each payment falls due when a defined stage is complete and has been checked, not when a month has passed or a request has arrived.

Street view of a modern house in DHA Lahore, designed and built by Avenir Developments with its interiors
PhotographA modern house in DHA Lahore, designed and built by Avenir with its interiors. Handed over in 2024.
232projects designed, approved or built
18countries Avenir's clients live in
24Design + Build projects

Counted, not claimed. The record is set out on the About page.

Distance is not what damages remote projects. Undocumented decisions are.

A house built five thousand miles away fails in the gaps: the change agreed on a phone call and never drawn, the material substituted because the specified one was slow to arrive, the revised drawing that never reached the site engineer. Close those gaps and the distance stops mattering a great deal. Avenir draws the house, obtains the approvals and builds it as one firm, so there is no handover point for a problem to hide in and no second party to blame.

This page is for you if

  • You hold a plot in DHA, Bahria Town, Lake City, Park View City, a CDA sector, an LDA scheme or another approved society, and it has sat undeveloped while you decided what to do.
  • You are building a home for parents or relatives who will live in it before you do, or for your own return in five or ten years.
  • You inherited a plot and would rather build than sell.
  • You started with a contractor or a draftsman and now want a firm rather than an individual.

Avenir is not the right firm if

  • You want a labour-only contract. Avenir's construction work is on a material-plus-labour or turnkey basis, because labour-only removes the material control that makes remote building safe.
  • You need a small renovation or a repair.
  • You need a builder outside Lahore, Islamabad and Rawalpindi. Elsewhere in Pakistan Avenir provides architecture, interior design, visualisation and project consultancy, and says so rather than claim a site presence it does not have.
  • Your priority is the lowest rate per square foot in the market. Another firm will beat Avenir on that number, and it is better to say so now than after the foundation is poured.

Where each step happens

Three moments need a signature inside Pakistan. Everything else happens where you are.

From the first message to handover, the work runs on your phone, your laptop and video calls. Three acts usually need a signature in Pakistan: the authority submission, the construction agreement and the utility connections. Each can be done on one visit, or through a special power of attorney limited to construction.

Follow the ladder from top to bottom. Hollow points happen where you are; filled points happen on the plot, at the authority or on site in Pakistan; the three signature cards cross between them. Pick your situation and the cards, and the button, change.

Where you areIn Pakistan
  1. Where you are

    Message Avenir on WhatsApp

    A reply within one working day.

  2. Where you are

    First video call

    On Google Meet or Zoom, at a time that suits you. No fee for the first consultation.

  3. Where you are

    Design brief

    Avenir's brief form reaches you before the meeting, so the call is spent on decisions.

  4. Where you are

    Fee proposal

    In writing, within two working days of the meeting.

  5. In Pakistan

    Plot and feasibility

    The plot is checked against the society's rules for covered area, height and basement, and a soil investigation is arranged where the foundation needs one.

  6. Where you are

    Design reviews

    Concept, plans, elevations and 3D views reviewed with you by video call and revised until they are right.

  7. Authority submissionSignature in Pakistan

    Done on one visit, or through a special power of attorney.Signed during your visit, with your ownership documents.Lodged and signed by your attorney under a special power of attorney limited to construction.Signed by the family member you name as attorney, under a special power of attorney with an expiry date.

  8. In Pakistan

    Approval

    Avenir lodges the submission set, answers objections and collects the approval.

  9. Where you are

    Working drawings and the bill of quantities

    Architecture, structure and MEP coordinated into one construction set; quantities measured and priced against it; reviewed with you by video call.

  10. Construction agreementSignature in Pakistan

    Signed on a visit, or by your attorney once you have approved the scope from abroad.Signed on the same visit, once the bill of quantities, scope and payment schedule are agreed.Signed by your attorney, after you have approved the scope and the payment schedule in writing.Signed by your attorney after you have approved the bill of quantities, scope and payment schedule from abroad.

  11. In Pakistan

    Site work

    An Avenir architect checks each stage against the drawings before the next begins.

  12. Where you are

    Stage payments

    Fall due against completed, verified stages, paid from your bank through documented channels.

  13. Where you are

    Weekly progress report

    Reaches you every week while the site runs.

  14. Utility connectionsSignature in Pakistan

    Applied for on a visit, or by your attorney.Applied for during the visit, or later by an attorney if the connections fall due after you leave.Applied for by your attorney in your name.Applied for by your attorney in your name.

  15. In Pakistan

    Handover

    The snag list is closed before the keys are handed over. Inspect in person, or name someone to inspect for you.

  16. Where you are

    After handover

    A one-year defects liability period on the construction agreement.

How will you handle the three signatures?

What your choice changes

Authority submission
Done on one visit, or through a special power of attorney.Signed during your visit, with your ownership documents.Lodged and signed by your attorney under a special power of attorney limited to construction.Signed by the family member you name as attorney, under a special power of attorney with an expiry date.
Construction agreement
Signed on a visit, or by your attorney once you have approved the scope from abroad.Signed on the same visit, once the bill of quantities, scope and payment schedule are agreed.Signed by your attorney, after you have approved the scope and the payment schedule in writing.Signed by your attorney after you have approved the bill of quantities, scope and payment schedule from abroad.
Utility connections
Applied for on a visit, or by your attorney.Applied for during the visit, or later by an attorney if the connections fall due after you leave.Applied for by your attorney in your name.Applied for by your attorney in your name.

What never changes: the brief, the design reviews, the drawings, the price and the stage payments happen where you are. The site is checked by an Avenir architect and reported to you every week.

Discuss My Project on WhatsAppPlan My Build Around One VisitBuild Without TravellingBuild With a Family Attorney

Your choice goes into the message, so the reply starts from the right place. Which signatures your authority accepts through an attorney is confirmed at the brief stage.

The three signatures, by situation

ActOn one visitWithout travellingThrough a family attorney
Authority submissionSigned during your visit, with your ownership documents.Lodged and signed by your attorney under a special power of attorney limited to construction.Signed by the family member you name as attorney, under a special power of attorney with an expiry date.
Construction agreementSigned on the same visit, once the bill of quantities, scope and payment schedule are agreed.Signed by your attorney, after you have approved the scope and the payment schedule in writing.Signed by your attorney after you have approved the bill of quantities, scope and payment schedule from abroad.
Utility connectionsApplied for during the visit, or later by an attorney if the connections fall due after you leave.Applied for by your attorney in your name.Applied for by your attorney in your name.

A special power of attorney limited to construction, with an expiry date and one named attorney, is enough for every act on this page. It never needs to permit sale, transfer or mortgage. See the paperwork section below.

The real problem

Why houses built from abroad go wrong

Blaming the contractor is the easy conclusion and it is usually incomplete. Most remote projects that go badly were set up to go badly on the day they started. Four causes account for most of what Avenir is asked to look at.

  • The brief lives on phone calls

    Decisions pile up across months of voice notes. A bedroom moves, a staircase turns; nobody updates the drawing, so the drawing and the intention drift apart until the owner sees a house that is not the one they thought they had agreed to.

  • Nobody owns the gap between the drawing and the wall

    A separate architect draws and a separate contractor builds. When the beam depth clashes with the ceiling, each explains why it is the other's responsibility, and you are asked to arbitrate from five thousand miles away.

  • Cash leads the work

    Money is released monthly, or when it is asked for, rather than when a measured quantity of work has been checked. The moment cash leads the work, you have lost your only real leverage.

  • A relative is asked to do a technical job

    A brother or a father will visit the site, photograph it and push the team. That help is real. But bar spacing, lap lengths, cover blocks, waterproofing laps and pressure tests are checked with a drawing, a tape and a checklist, not by looking.

Front elevation of the 4 acre modern farmhouse on Raiwind Road, Lahore, designed and built by Avenir Developments
3D render4 acre farmhouse, Raiwind Road, Lahore. Designed and built by Avenir.

None of the four is a construction failure. Each is a documentation failure that construction then exposes.

A longer field guide: 7 costly mistakes overseas Pakistanis make when building a house in Pakistan.

Your options

Three ways to build from abroad, compared

Design + Build is not the right answer for everyone. This is the comparison as Avenir would give it to a friend. The three drawings show who holds a contract with whom.

Contractor with family supervision

You, abroad
A relative on site
Contractor

Three parties, no drawings between them. Instructions travel by phone through a relative; the contractor prices before the house exists on paper.

Separate architect and contractor

Architect
You, abroad
Contractor

Two contracts, one gap. Each party answers to you, and neither answers to the other when the drawing and the wall disagree.

Design + Build with one firm

You, abroad
DesignEngineeringApprovalsBuild

One contract, one party answerable. The clash is resolved inside the firm and recorded, not escalated to you.

ConsiderationContractor with family supervisionSeparate architect and contractorDesign + Build with one firm
Who owns the drawingsOften nobody. A draftsman produces a map for approval and little else.The architect, though the contractor may build from a partial set.One firm, with the construction set built for construction.
How the price is arrived atA rate per square foot, quoted before the house exists on paper.A rate or a bill of quantities, depending on how complete the drawings are.A bill of quantities priced against a coordinated construction set: one figure, with the site items inside it.
Who answers for a defectDisputed.Disputed between two parties.One party.
At a design and site clashSite decides, and you find out later.Escalated to you to arbitrate.Resolved inside the firm and recorded.
VariationsOften verbal, discovered on the bill.Priced, sometimes after the event.Priced and approved in writing before execution, as the agreement requires.
CostLowest headline rate.Middle, plus separate professional fees.Highest headline figure, and the most complete scope.
When it makes senseA simple build where you are personally present and technically capable.You already trust an architect and want to tender the build competitively.You are abroad, the project is substantial, and you want one party answerable.

Design + Build does not automatically produce a cheaper or a faster house, and any firm that says it does is selling. What integration removes is the coordination failure between design and construction, which is where remote projects most often lose time and money.

How Avenir runs it is set out on the Design + Build page.

Who decides what

What Avenir handles, and what only you can decide

Remote projects run into trouble when nobody has written down who decides what. This is the split, as it stands in an Avenir appointment.

Master plan of the 10 acre Chak Shahzad estate seen from directly above: the walled compound, the main house, lawns and drive
3D renderMaster plan of the Chak Shahzad estate from above. The kind of drawing a client reviews by video call before anything is priced.

Decisions are made on drawings like this one

Before the first figure is put to a project, the owner has seen it as a master plan, floor plans, elevations, sections and 3D views, and has approved each in turn by video call. That is what makes the split below workable from abroad: Avenir decides the technical questions inside an envelope you have already approved, and the questions that change cost, appearance or programme come back to you.

Avenir is responsible for

  • Design development, drawings and specification
  • Structural design and MEP coordination, checked against each other before the set is priced
  • Preparing and lodging the authority submission, and responding to objections through to approval
  • Measuring the bill of quantities and pricing the drawings as one figure
  • Procurement, material approvals against the specification, and site supervision
  • Checking each stage against the drawings, by an Avenir architect, before the next begins
  • The weekly progress report, every week the site runs
  • Snagging, testing and the completion file; the snag list is closed before handover

You are responsible for

  • 1Approving the brief and the concept
  • 2Confirming the finishing level you want to pay for, before the set is priced
  • 3Providing ownership documents and the signature arrangement
  • 4Reading and accepting the scope, the exclusions and the payment schedule
  • 5Releasing each stage payment once the stage is complete and verified
  • 6Responding to decisions when they come to you
  • 7Approving or declining any change, in writing
  • 8The final inspection, in person or by someone you name

Insist on this term in any agreement you sign, with anyone: no change is built until it has been priced and approved by you in writing. It removes the most common dispute on remote projects, which is not poor work but unagreed work that has already been paid for by the time the owner hears of it.

Talk to an architect

Your plot is in Pakistan. Your first meeting can be on a video call.

Send the society, the plot size and roughly where you are in your thinking. The team replies within one working day and sets up a Google Meet or Zoom call at a time that suits you.

Book a Video Call on WhatsApp

The first consultation is free. A written fee proposal follows within two working days of the call.

Paperwork and authority

Power of attorney, approvals and paperwork when you are not in Pakistan

You do not need to be in Pakistan to have your house designed, to review drawings, or to agree a scope and a price. You do need a documented arrangement for the acts that require a signature inside Pakistan. That arrangement is usually a special power of attorney, and the most important thing about it is what it does not permit.

Scope your power of attorney narrowly

A general power of attorney hands someone the ability to deal with your property, including selling or transferring it. You almost never need that in order to build a house. A special power of attorney limited to construction-related acts gives your representative what the project requires and nothing beyond it.

Reasonable to authorise for a buildDo not include without specific legal advice
Submitting building plans to DHA, LDA, CDA, RDA or the society, and collecting the approvalSelling, transferring, gifting or exchanging the property
Signing the construction agreement on your behalfMortgaging the property or creating any charge over it
Applying for and receiving utility connectionsEntering into a lease or tenancy
Paying society fees, approval charges and utility depositsReceiving sale consideration on your behalf
Receiving approvals, NOCs and completion documentationSubstituting or delegating the attorney to a third party
Representing you at authority offices on construction mattersAny authority with no expiry date and no defined scope

Two further protections are worth building in: an expiry date tied to the expected project duration, and one named attorney rather than an open list of family members.

Two routes to executing a power of attorney from abroad

Online, through NADRA

NADRA, working with the Ministry of Foreign Affairs, runs an online power of attorney service for overseas Pakistanis at poa.nadra.gov.pk. It was introduced so that a power of attorney no longer needs a trip to a Pakistan mission in another city.

  1. Sign up on the portal and enter the details of the person giving the power, the attorney and the witnesses, with their documents.
  2. NADRA verifies the details and the fee is paid.
  3. The Pakistan mission for the country you live in interviews you online and issues a receipt.
  4. The attested instrument goes to your attorney in Pakistan with the receipt.

In person, at a Pakistan mission

The document is executed and attested at your nearest Embassy, High Commission or Consulate, then sent to Pakistan for attestation by the Ministry of Foreign Affairs before it is used. The manual route continues alongside the online one.

Requirements differ between missions, including the witnesses, the photographs and the form of the document, so check the current list with your mission before you travel.

One thing to be clear about. Avenir Developments is an architecture and construction company, not a law firm. The notes above describe the process as published by NADRA, the Ministry of Foreign Affairs and the Pakistan High Commission in London as at Q4 2026; requirements differ between missions and change from time to time. Have your power of attorney drafted or reviewed by a Pakistani lawyer, and confirm the current procedure with your nearest Pakistan mission before you execute anything.

Documents to have ready

  • CNIC, NICOP or POC, and your passport
  • Allotment letter, transfer letter or title documents
  • Possession certificate, where the society issues one
  • Site plan or demarcation certificate
  • Proof that society dues and development charges are clear
  • Your executed and attested power of attorney, if appointing a representative

Approvals

Avenir prepares the submission set, lodges it with DHA, LDA, CDA, RDA or the society, and deals with objections through to approval. It knows each authority's byelaws and gets the approvals done for its clients. No firm can guarantee an outcome or a timeline, and you should be cautious of anyone who does.

Each society has its own approval regime, and the differences are not trivial: covered-area rules, height limits, basement provisions, setbacks and submission procedure vary between authorities and between phases of the same authority. That is why the plot is checked against its rules before anyone starts drawing.

Money

How overseas clients pay for design and construction

In stages, against completed and verified work, through documented banking channels, in Pakistani rupees. There is no advantage in paying cash into an informal arrangement, and one large disadvantage: you lose the paper trail you would need if anything were ever disputed.

  1. A stage is completed and checked

    Work is checked against the drawings before anything is covered. Nothing falls due before that.

  2. A stage invoice reaches you

    It names the stage, the quantities behind it and the amount, against the agreed payment schedule.

  3. You pay from your account abroad

    By bank transfer or through your Roshan Digital Account, in rupees, through a documented channel.

  4. The record is kept together

    Remittance advice, bank receipt and the stage invoice, filed as one set for every payment.

Use documented channels, and keep the record

Every payment should be traceable from your account abroad to the receiving account in Pakistan, with an invoice referencing the stage it relates to. This matters for ordinary commercial reasons, and it can matter again at property transfer, where documented banking channels affect how a transaction is treated.

Roshan Digital Account and Roshan Apna Ghar

The State Bank of Pakistan's Roshan Digital Account lets a non-resident Pakistani open and run a Pakistani bank account remotely, in rupees or in a major foreign currency, without visiting a branch, an embassy or a consulate.

Linked to it, Roshan Apna Ghar is the State Bank's facility for non-resident Pakistanis and Pakistan Origin Card holders to buy, build or renovate a house in Pakistan, from their own funds or with bank financing, in conventional or Shariah-compliant form, over three to twenty-five years. It comes in a lien-based form and a non-lien form; the non-lien form needs you, or your attorney, to create the mortgage in the bank's favour. Many owners with an undeveloped plot do not realise that construction is covered. Terms differ between participating banks, so confirm them with yours.

Gate and drive of the 4 Kanal classical sandstone villa on Bedian Road, Lahore, designed by Avenir Developments
3D render4 Kanal villa, Bedian Road, Lahore. Designed by Avenir; drawings ready for submission.

If you are still buying the plot: the non-resident tax route

The advance taxes collected at property transfer under sections 236C and 236K of the Income Tax Ordinance have a defined route for non-residents. A NICOP or POC holder who spent fewer than 183 days in Pakistan in the tax year pays at the filer rate even without being a filer. The authority or society creates the payment slip through the Overseas Pakistanis link on FBR's portal, you declare your NICOP or POC and your non-resident status with supporting documents, and the Commissioner verifies the case and notifies you by email and SMS before payment is made.

The rates were amended by the Finance Act 2025 and change with each Finance Act. Avenir does not give tax advice: confirm the current position with a tax practitioner or with FBR before you transact, and do not rely on figures published on property portals.

Currency and price movement over a long build

A house takes long enough to build that the rupee and the material market will both move while it goes up. Two separate things can move against an owner who earns in sterling, dollars or dirhams: the exchange rate when you remit, and steel, cement and finishing prices inside Pakistan.

Three things reduce the exposure. Fix the specification early, because most cost growth on a house comes from decisions changed after work started rather than from the market. Have the agreement state in writing how escalation is handled, as Avenir's construction agreement does. And bring forward the purchase of long-lead and price-volatile items once the drawings are settled enough to order accurately. For current cost bands and what drives them, see house construction cost in Pakistan.

Quality at a distance

What a photograph cannot show you

A weekly photograph tells you that work is happening. It does not tell you whether the work is correct. Most of what decides whether a house lasts is buried inside it, and each element has a short window in which it can be checked before it is permanently covered.

Once concrete is poured, plaster is applied or tiles are laid, verification stops being an inspection and becomes demolition. So the check that matters is the one made before covering, against the drawing. On every Avenir site an architect checks each stage against the drawings, and a progress report goes to the client every week.

Double-height hall with a glass chandelier in a 2 Kanal house Avenir Developments is building in T Block, DHA Phase 8, Lahore
3D renderDouble-height hall of a 2 Kanal house Avenir is building in DHA Phase 8, Lahore. Everything that makes this room safe was checked before it was covered.

What this room is hiding

  • The steel in the beam above the void, checked against the bar bending schedule before the pour
  • The conduits behind the plaster, photographed wall by wall before they were covered
  • The waterproofing under the terrace above, tested before the screed went down
  • The cube results for the concrete you cannot see

A finished room looks the same whether or not any of this was done. The record is the only difference.

StageWhat must be verified before it is coveredWhat a proper check leaves behind
Excavation and foundationsBearing stratum, levels and dimensions against the structural drawingLevels record, dated photographs and the engineer's signature
Steel fixing, before every pourBar diameter, spacing, lap lengths, anchorage and cover blocks against the bar bending scheduleClose photographs with a tape in the frame; a checklist against the schedule
Concrete pourMix, workability and placement; test cubes taken and cured for later testingDelivery records, cube identification, cube results when available
WaterproofingContinuity, laps and terminations at basement, roof and wet areas, tested before coveringPhotographs of laps and terminations; the ponding or flood test record
Conduits and boxes, before plasterPositions against the electrical layout and against the furniture and joinery planA marked-up layout; photographs of every wall before plaster
Plumbing, before coveringPressure test on supply lines; fall check on drainageThe pressure test record, gauge visible, dated
Screeds and levels, before tilingFalls to drains, level tolerances and threshold heightsLevel readings and photographs
Electrical, before energisingCircuit distribution, earthing and load balance against the designTest records; distribution board photographs
Snagging and handoverThe full defect list agreed, worked through and inspected againThe snag list with closure evidence against each item

Photographs taken before covering are worth more than any number of photographs taken afterwards. That is the whole principle. Ask any builder you consider how their checks before covering are recorded, and who signs them.

Before you fly

Decide it on paper, over video calls, before you fly.

Settle the brief, the concept and the drawings from where you are, so that a visit to Pakistan is spent on signatures and the site rather than on choosing.

Start My Design + Build Project

Design + Build, or construction with project management, in Lahore, Islamabad and Rawalpindi.

Communication

Working across time zones without losing weeks

A site does not stop because the owner is asleep. The cost of a slow decision on a live site is measured in idle labour and resequenced work, so how decisions reach you matters as much as when.

When Avenir's working day falls in yours

Both offices work Monday to Saturday, 10:00 to 19:00 Pakistan time. Each bar is your own 24-hour clock, midnight to midnight; the filled part is that nine-hour window in your time.

  • UK and IrelandGMT; BST in summer

    05:00 to 14:00 your time; 06:00 to 15:00 in summer. Your morning and early afternoon. Comfortable for both sides.

  • Gulf: UAEGST

    09:00 to 18:00 your time. Almost your whole working day. The easiest overlap of all.

  • Gulf: Saudi Arabia and QatarAST

    08:00 to 17:00 your time. Almost your whole working day.

  • US and Canada, EastET; EDT in summer

    00:00 to 09:00 your time; 01:00 to 10:00 in summer. Your early morning. Later calls are by arrangement.

  • US WestPT; PDT in summer

    21:00 to 06:00 your time; 22:00 to 07:00 in summer (the window runs past midnight). Your evening into the night. Calls are scheduled, not ad hoc.

  • Australia, EastAEST; AEDT in summer

    15:00 to 00:00 your time; 16:00 to 01:00 in summer. Your late afternoon and evening.

  • Australia, WestAWST

    13:00 to 22:00 your time. Your afternoon and evening.

Standard timeSummer time, where it applies

How decisions reach you

  • Enquiries from abroad are answered on priority by WhatsApp, and the first call is set up on Google Meet or Zoom at a time that suits you.
  • Design reviews run by video call. Drawings and views are shared before the call, so the call is for decisions rather than first sight.
  • Routine site questions are for the team you appointed. Decisions that change cost, appearance or programme come to you with the options and the cost difference set out, so you are choosing rather than researching.
  • Once construction starts, the weekly progress report is the fixed point of the week: what was done, what is next, and what needs you.

Video calls outside these hours are arranged for overseas clients. The point is not availability but sequence: decisions settled on paper before they are needed on site.

Engagement

Five ways to engage Avenir, and where it builds

Most overseas clients start with architecture or with Design + Build. You do not have to commit to construction to begin.

  • Front elevation of the 4 Kanal classical sandstone villa on Bedian Road, Lahore

    Architecture and design

    Brief, site analysis, concept design, 3D views, authority submission, structural and MEP coordination, working and construction drawings.

    Best if you want to fix the design and the approvals properly before deciding who builds.

    Architecture services
  • 16 Kanal farmhouse on Raiwind Road, Lahore, a Design + Build project by Avenir Developments under construction

    Construction

    Grey structure or turnkey construction against a bill of quantities, with procurement, supervision and the weekly report. Where handed-over drawings carry gaps or clashes, Avenir flags them and prices the fix into its quotation.

    Best if you already hold a complete, coordinated drawing set.

    Construction services
  • Garden side of the Chak Shahzad farmhouse, with the lower level at grade and the arcaded ground floor

    Design + Build

    Design, approvals, pricing and construction under one firm, from the first drawing to handover.

    Best if you want a single point of responsibility from first sketch to keys.

    Design + Build services
  • Drawing room with green marble panels in a 2 Kanal house in T Block, DHA Phase 8, Lahore, interiors by Avenir Developments

    Interior design

    Space planning, ceilings, lighting and tile layouts, joinery, material specification, 3D visualisation and execution drawings, for whole houses and apartments.

    Best if you want interiors planned before services are laid, rather than after.

    Interior design services
  • Park Central Apartments, Gulberg, Lahore: architecture and interiors by Avenir Developments

    Project consultancy

    Owner-side project management of a build you have appointed separately, development feasibility, or a paid review of a project that has stalled.

    Best if you need an independent professional on your side rather than a builder.

    Project consultancy

Pictured, left to right: the 4 Kanal sandstone villa on Bedian Road, Lahore (3D render, design ready for submission); the 16 Kanal farmhouse on Raiwind Road, Lahore (3D render, Design + Build, under construction); the Chak Shahzad farmhouse, Islamabad (3D render, Design + Build, under construction); interiors of a 2 Kanal house in DHA Phase 8, Lahore (3D render); Park Central Apartments, Gulberg, Lahore (3D render).

Interior design planned during architectural design costs less than interior design applied afterwards, because switch positions, air-conditioning routes, ceiling drops, wardrobe depths and kitchen services are decided while they are still lines on a drawing rather than channels cut into a finished wall. For an owner abroad this matters more, because you are the least able to absorb rework.

Lahore

Design, approvals, construction, Design + Build and interiors. Office at 139, CCA, DHA Phase 5. Lahore societies and DHA Lahore.

Islamabad and Rawalpindi

Design, approvals, construction, Design + Build and interiors. Office at 101, Luxus Mall, Gulberg Greens. Islamabad societies and DHA Islamabad.

Across the rest of Pakistan

Architecture, interior design, visualisation and project consultancy, with the construction appointed locally. Where Avenir designs.

Cost

What it costs, and why Avenir will not quote you a rate today

A rate per square foot quoted before your house has been designed is an estimate of a house nobody has drawn. It is not dishonest to give one, but it is not a price, and the gap between the two is where budget overruns live.

What moves the number on your project

  • Covered area, and how it is measured
  • Whether there is a basement
  • Soil conditions and the foundation they require
  • Structural complexity and floor-to-floor heights
  • Facade treatment, glazing extent and specification
  • The finishing level throughout
  • Mechanical and electrical scope
  • Kitchens and joinery
  • Boundary walls and external works
  • Utility connections and authority charges
  • How long the build runs for

Two quotations for the same house can differ by a wide margin and both be honest, because they include different things. Read the exclusions first; that is where the difference is. An Avenir quotation follows the drawings and the bill of quantities, and it is one figure, with the septic tank, the water tank, the boundary wall, the gate columns and the parapets inside scope.

Aerial view of the walled 10 acre farmhouse estate in Chak Shahzad with its gatehouse, lawns and tennis court
3D renderThe walled estate at Chak Shahzad. On a farmhouse, the perimeter wall, the gate and guard room, the drive, the tanks and the septic system sit inside Avenir's lump sum.

On a farmhouse, the list is longer, and it is still one figure

The items owners forget are the ones outside the house. On a farm plot Avenir's lump sum covers:

  • the main house, the staff block and the guest wing
  • the pool and its plant room
  • the perimeter wall, the main gate and the guard room
  • the approach drive, internal roads, parking and paths
  • the borewell, tanks, water treatment, septic tank and soakaway

Outside it: the electricity connection works and the planting. A farmhouse of this kind takes 18 to 24 months on site.

Step by step

What happens after you message Avenir, step by step.

A reply within one working day. A video call at a time that suits you. The design brief form before the meeting, and a written fee proposal within two working days of it.

Discuss My Construction Project

If you already hold drawings, send them with the message: Avenir reads them before the call.

Questions

Questions overseas clients ask

Decision questions, answered in the terms used on this page. The answers are the same ones the team gives on a call.

Do I need to travel to Pakistan to start?
No. The first call, the brief, the concept design, the design reviews, the working drawings and the pricing are all completed with you abroad. What usually needs a signature inside Pakistan is the authority submission, the construction agreement and the utility applications, and those are handled on one visit or through a special power of attorney.
Do I need to give someone power of attorney to build my house?
Usually yes, unless you can be in Pakistan for the specific moments a signature is needed. Use a special power of attorney limited to construction-related acts, with an expiry date and one named attorney. Do not use a general power of attorney that also permits sale, transfer or mortgage, because building a house requires none of those powers.
Can I get a power of attorney without visiting a Pakistani embassy?
Often, yes. NADRA and the Ministry of Foreign Affairs run an online power of attorney service for overseas Pakistanis at poa.nadra.gov.pk: you apply online, NADRA verifies the details, the Pakistan mission for your country interviews you online, and the attested instrument is sent to your attorney. The manual route at missions continues alongside it. Confirm the current requirements before relying on either.
Can Avenir get my building plan approved by DHA, CDA, LDA or RDA on my behalf?
Avenir prepares the submission drawings, lodges them and deals with objections through to approval; it knows each authority's byelaws and gets the approvals done for its clients. No firm can guarantee an approval outcome or a timeline, and you should be cautious of anyone who does.
How do I pay for construction from abroad?
In stages, through documented banking channels, against work that has been completed and verified. Each stage invoice names the stage and the amount against the agreed payment schedule. Keep the remittance advice, the bank receipt and the stage invoice together for every payment. A Roshan Digital Account is a practical way to hold and move funds without being in Pakistan.
Can I use a Roshan Digital Account to build a house?
Yes. The State Bank of Pakistan's Roshan Apna Ghar facility, accessed through a Roshan Digital Account, covers building on a plot as well as buying and renovating, from your own funds or with bank financing, in conventional or Shariah-compliant form over three to twenty-five years. Conditions differ between participating banks, so confirm the terms with yours.
Is turnkey better than grey structure for an overseas client?
Usually, provided the scope is written properly. Turnkey puts finishing, procurement and coordination with one firm, which removes the second round of appointments you would otherwise have to run from abroad. Grey structure suits owners who plan to complete the finishing later or in stages. The deciding factor is not the label but how precisely the scope and the exclusions are defined.
How do I know the work is being done properly if I cannot visit?
Through checks made before each element is covered, against the drawings. On every Avenir site an architect checks each stage before the next begins, and a progress report reaches you every week. Steel is checked against the bar bending schedule before the pour; plumbing is pressure-tested before it is buried; waterproofing laps are checked and tested before anything goes over them. A photograph taken after covering proves nothing, which is why the timing of a check matters more than the quantity of photographs.
Can my brother or father supervise instead?
They can help, and their presence is valuable for judgement about people and for keeping momentum. What they should not be asked to do is technical verification, because reinforcement detailing, concrete quality and services testing need a drawing, a checklist and training to assess. Splitting the two roles protects the house and the relationship.
What happens if steel and cement prices rise while my house is being built?
The construction agreement should say, in writing, how escalation is handled and whether any rates are fixed and for how long. Avenir's construction agreement sets this out. Ask that question of every firm you speak to, and be suspicious of a fixed price offered without a complete drawing set behind it, because it usually reappears later as a variation.
I already started with a contractor and it has gone wrong. Can Avenir take over?
No. Avenir does not take over part-built projects. Where the owner is open to changes and pays for the work, Avenir reviews the structure that exists and the paperwork behind it, and shares written recommendations for whoever continues the build. Send photographs and whatever drawings exist, and the team will say plainly whether a review would help.
Which cities does Avenir build in?
Construction is delivered in Lahore, Islamabad and Rawalpindi. Elsewhere in Pakistan Avenir provides architecture, interior design, visualisation and project consultancy, and will tell you plainly which category your city falls into rather than claim a presence it does not have.
What does it cost to build a 1 Kanal house?
It depends on covered area, basement provision, the structural solution, the specification and the external works, and any figure quoted before those are known is an estimate rather than a price. Current reference bands for Lahore and Islamabad, by quarter, are set out on the house construction cost page, and a project-specific figure follows the drawings and the bill of quantities.

Next step

Start with a conversation, not a contract

Send the society, the plot size and roughly where you are in your thinking. The team comes back within one working day with an honest view of what is achievable on that plot, what the sequence looks like from where you are standing, and what it will take to get there. There is no fee for that, and no obligation attached to it.