Grey Structure Cost Calculator (2026) | 5 Marla, 10 Marla, 1 Kanal and 2 Kanal House

Get practical grey structure estimates for 5 Marla, 10 Marla, 1 Kanal and 2 Kanal homes in Lahore, Islamabad and Rawalpindi, with the grey structure rate per square foot in Pakistan reviewed for Q4 2026, clear inclusions, the labour share, DHA stage requirements and BOQ guidance for accurate budgeting.

Grey Structure Cost in Pakistan 2026 Avenir Developments (1)
Pakistan · Rates reviewed Q4 2026

Grey Structure Cost Calculator

Estimate a planning range for grey structure in Lahore, Islamabad and Rawalpindi from your city, society, plot size, covered area, basement and specification. Basement is priced on its own rate.

Lahore, StandardPKR 3,300 / sq ft

Islamabad and Rawalpindi, StandardPKR 3,500 / sq ft

Site labour, LahorePKR 650 to 850 / sq ft

Project Inputs

Choose the closest profile. You can overwrite the covered area for a more relevant estimate.

City
Society or authority
DHA adds 6% to materials and labour for building to its approved drawings through five stage inspections.
Sets a typical covered area and the structural span adjustment.
Ground and first floor plus mumty. Enter the basement separately below.
Construction Quality
Tiers differ by structural system, steel grade, sand and crush source, DPC and door frames. See the full specification schedule.
Enter 0 for no basement. Priced on its own basement rate.
Projections, long spans, double height spaces and cantilevers add cost.
Indicative Grey Structure Cost PKR 1.87 Crore to PKR 2.02 Crore Midpoint PKR 1.95 Crore (19,470,000). Planning band plus or minus 4%.
Effective ratePKR 3,300 / sq ft
Covered area above ground5,900 sq ft
BasementNot included
Typical build time11 to 12 months

Construction Cost Breakdown

How the grey structure budget divides across work packages, at the planning range above. The split moves with foundation type and structural system, so treat it as an allocation guide rather than a bill of quantities.

Work packageShareIndicative range
RCC frame, slabs and staircase34%PKR 63.6 Lakh to PKR 68.8 Lakh
Substructure and plinth18%PKR 33.6 Lakh to PKR 36.4 Lakh
Masonry, lintels and sun shades16%PKR 29.9 Lakh to PKR 32.4 Lakh
Plaster and roof treatment14%PKR 26.2 Lakh to PKR 28.3 Lakh
Embedded services10%PKR 18.7 Lakh to PKR 20.2 Lakh
Site establishment and supervision8%PKR 15.0 Lakh to PKR 16.2 Lakh
Indicative principal material quantities for the area entered. Planning figures for procurement discussion. Only a BOQ from your structural drawings gives an accurate count.
MaterialIndicative quantity
Cement, 50 kg bags2,240 to 2,600
Steel (sarya), Grade 6016.5 to 21.2 tonnes
Bricks, first class112,000 to 130,000
Sand6,500 to 7,650 cft
Crush (bajri)4,450 to 5,300 cft

Site labour inside this estimate: PKR 650 to PKR 850 per sq ft of covered area above ground, about 20% to 26% of the rate shown. The labour rate follows the contractor's experience, staff and equipment rather than the specification.

Basement is not included. The estimate assumes a conventional residential RCC frame and masonry grey structure on ground and first floor with a mumty, at typical design complexity.

Disclaimer: Grey structure cost depends on the architectural and structural design, soil and site conditions, authority requirements, procurement timing, construction period, cashflow, workmanship and supervision. It excludes finishing, design fees, approvals, utility connections, boundary wall and external works. Rates reviewed Q4 2026. A planning estimate, not a quotation.

Scope

Stop at grey, or build complete?

Grey structure suits owners who will run their own finishing team. If you will not be on site regularly, complete construction usually fits better.

During the build

Who will manage the finishing decides the scope.

Q4 2026 rates

Grey Structure Rate Per Square Foot in Pakistan

At Standard (A-grade) specification, grey structure plans at PKR 3,300 per square foot of covered area in Lahore and PKR 3,500 in Islamabad and Rawalpindi. In DHA Lahore it is PKR 3,500 and in DHA Islamabad PKR 3,710. Basement is priced on its own rate, from PKR 4,000 per square foot of basement area. Figures cover materials and site labour on a 1 Kanal reference plot. Rates reviewed Q4 2026.

Grey structure, above ground

PKR per square foot of covered area. Planning band plus or minus 4%. Smaller plots run slightly lower and 2 Kanal about 4% higher.
LocationEssentialStandard (A-grade)PremiumLuxury
DHA Lahore3,1803,5003,9204,240
DHA Islamabad3,3903,7104,1304,450
Lahore3,0003,3003,7004,000
Islamabad and Rawalpindi3,2003,5003,9004,200

Basement grey works

PKR per square foot of basement area. A separate rate, not a percentage uplift on the above ground rate.
LocationEssentialStandard (A-grade)PremiumLuxury
DHA Lahore4,2404,5604,7704,980
DHA Islamabad4,4504,7704,9805,190
Lahore4,0004,3004,5004,700
Islamabad and Rawalpindi4,2004,5004,7004,900

Why Islamabad and Rawalpindi cost more than Lahore

The twin cities run PKR 200 per square foot above Lahore on grey structure and basement. Sub soil in much of Islamabad and Rawalpindi is mixed and in places rocky, so excavation is slower and foundations work harder, and the material basket costs more to land on site. A rate that puts Islamabad below Lahore has not been tested against a site in either city.

Why DHA costs 6% more

A compliance cost, not a market premium. DHA verifies construction against its approved drawing at five stages, four of them inside grey structure, so the on site adjustment that absorbs cost in other societies is not available. The 6% applies to materials, labour and basement alike. The inspections are explained further down this page.

Rates reviewedQ4 2026Next reviewQ1 2027CoversMaterials and site labourMarketsLahore, Islamabad, Rawalpindi

Every rate here comes from the same model as the calculator above and the house construction cost page, so grey structure plus finishing equals a complete house by construction. Planning figures, not a quotation.

Next step

Turn the estimate into a quote.

A grey structure rate is a planning range. A quote you can hold comes from approved drawings and a bill of quantities. Tell us where you are and we start from there.

What do you have so far?

Tap where you are to see what comes next.

Grey structure scope

What's Included in Grey Structure

The checklist Avenir Developments uses on grey structure in Lahore, Islamabad and Rawalpindi, aligned to architectural and structural drawings and to typical housing authority practice. Compare any quotation against it line by line.

Site Preparation & Excavation

  • Plot levelling and layout marking as per architectural and structural drawings.
  • Water boring, if required by site conditions.
  • Excavation for foundations to the structural drawings.
  • PCC base, compaction and levelling for a stable foundation bed.

Pest Control & Initial Protection

  • Termite proofing for all underground works.
  • Seepage control on the base slab with approved waterproofing compounds.
  • Ground floor termite treatment before PCC filling.

Foundation & Structural Work

  • Damp proof course, then earth filling and compaction to plinth level.
  • First class brick masonry to all floors.
  • Steel reinforced RCC columns, beams and slabs as per structural drawings.
  • Steel door frames (jisti), 14 gauge at Standard, with anti corrosive treatment; lintels and sun shade projections.

External & Internal Grey Finishes

  • Front elevation shaped as per approved architectural and 3D drawings.
  • Cement plaster on external and internal walls. Ceiling plaster is usually excluded where a false ceiling is planned.
  • Staircase construction up to plaster level.

Plumbing, Sanitation & Utilities

  • Underground sewerage piping (CI) for baths, kitchens and waste outlets.
  • PPRC internal piping for hot and cold water and gas.
  • Electrical conduits as per approved layouts.

Floor, Roof & Boundary Works

  • RCC floor slabs with water levelling as per design.
  • Roof insulation and protection (plastic sheet, coal tar and tiles) for heat and weather.
  • Window safety grills, with finishing excluded.
  • Boundary wall with gate columns, built with the grey structure and priced separately per running foot.
  • External PCC flooring including ramp and walkway.

Outside the per square foot rate

  • All finishing: flooring, tiling, paint, ceilings, joinery and wardrobes
  • Wiring, cabling, distribution boards, switches, lights and fans
  • Sanitary ware, taps, fittings and the kitchen
  • Windows, glazing and door shutters
  • Fire alarm and CCTV systems, including their conduits and fire resistant cable
  • Boundary wall and gate columns, priced per running foot
  • Main gate, driveway, landscaping and external works
  • Architectural, structural and MEP design fees
  • Authority and society approval charges and utility connections
  • Basement, unless entered separately in the calculator

Estimating Grey Structure Cost Per Square Foot

At Standard specification, typical design complexity and no basement, grey structure for a 5 Marla house in Lahore is PKR 57.6 to 67.2 Lakh, a 10 Marla house PKR 98.0 Lakh to 1.11 Crore and a 1 Kanal house PKR 1.82 to 2.08 Crore. The larger the plot, the higher the rate per square foot, because longer spans need thicker slabs, deeper beams and more steel.

Plots drawn to the same scale at 225 sq ft per Marla. Standard (A-grade) specification, no basement, rates reviewed Q4 2026.20 ft

  • 5 Marla

    1,125 sq ft plot1,800 to 2,100 sq ft covered
    Lahore, grey structure
    PKR 57.6 Lakhto 67.2 Lakh
    PKR 3,200 per sq ft3% below the 1 Kanal rate
    DHA Lahore
    PKR 61.1 to 71.3 Lakh
    Islamabad
    PKR 61.1 to 71.3 Lakh
    Build time, complete house
    5 to 6 months
  • 8 Marla

    1,800 sq ft plot2,600 to 3,000 sq ft covered
    Lahore, grey structure
    PKR 84.1 Lakhto 97.0 Lakh
    PKR 3,230 per sq ft2% below the 1 Kanal rate
    DHA Lahore
    PKR 89.1 Lakh to PKR 1.03 Crore
    Islamabad
    PKR 89.2 Lakh to PKR 1.03 Crore
    Build time, complete house
    6 to 7 months
  • 10 Marla

    2,250 sq ft plot3,000 to 3,400 sq ft covered
    Lahore, grey structure
    PKR 98.0 Lakhto 1.11 Crore
    PKR 3,270 per sq ft1% below the 1 Kanal rate
    DHA Lahore
    PKR 1.04 to 1.18 Crore
    Islamabad
    PKR 1.04 to 1.18 Crore
    Build time, complete house
    6 to 7 months
  • 1 Kanal

    4,500 sq ft plot5,500 to 6,300 sq ft covered
    Lahore, grey structure
    PKR 1.82 Croreto 2.08 Crore
    PKR 3,300 per sq ftThe reference rate
    DHA Lahore
    PKR 1.92 to 2.20 Crore
    Islamabad
    PKR 1.93 to 2.21 Crore
    Build time, complete house
    11 to 12 months
  • 2 Kanal

    9,000 sq ft plot10,000 to 11,500 sq ft covered
    Lahore, grey structure
    PKR 3.43 Croreto 3.95 Crore
    PKR 3,430 per sq ft4% above the 1 Kanal rate
    DHA Lahore
    PKR 3.64 to 4.18 Crore
    Islamabad
    PKR 3.64 to 4.19 Crore
    Build time, complete house
    15 to 16 months

A rate per square foot

Use it for
Budgeting before drawings exist
How precise
A planning band of plus or minus 4%
What it needs
Plot size, covered area, city and specification

A bill of quantities (BOQ)

Use it for
Pricing your house and comparing quotations line by line
How precise
Every bag of cement, tonne of steel and cubic foot of concrete, measured
What it needs
Architectural and structural drawings
Send My Drawings for a BOQ

Next step

Turn the estimate into a quote.

A grey structure rate is a planning range. A quote you can hold comes from approved drawings and a bill of quantities. Tell us where you are and we start from there.

What do you have so far?

Tap where you are to see what comes next.

Labour (mazdoori)

Grey Structure Labour Rate in Lahore and Islamabad

Many people pricing a grey structure are really asking one question: what is the labour rate if I buy the materials myself. It deserves a straight answer before the caveats.

Site labour only, all grey structure trades, per square foot of covered area above ground, residential houses. Reviewed Q4 2026.
LocationLabour rate per sq ftShare of the grey structure rate at Standard
LahorePKR 650 to 85020% to 26%
DHA LahorePKR 690 to 90020% to 26%
Islamabad and RawalpindiPKR 800 to 1,00023% to 29%
DHA IslamabadPKR 850 to 1,06023% to 29%

Islamabad and Rawalpindi run about PKR 150 per square foot above Lahore on labour. DHA adds 6%, because building to the approved drawing through five stage inspections costs the labour contractor more in supervision and rework. The rate covers excavation, steel fixing, shuttering, concreting, masonry, plaster, the plumbing and electrical rough in, roof treatment and curing.

What decides where a contractor sits in the band

  • Years of experience, and the projects actually in their portfolio
  • Whether they employ qualified technical staff, or a foreman and nobody else
  • How much supervision they put on site, and at what level
  • Whether they own their tools, plant and equipment, or hire everything in

A contractor who owns shuttering, mixers, vibrators and scaffolding is not passing hire charges through your project, and the plant is there when the programme needs it rather than when a rental yard can spare it.

Why a quoted labour rate is rarely comparable

  • Scaffolding, shuttering timber and plant may sit inside the rate or outside it
  • Curing is labour with no visible product, so it is the first thing a cheap rate drops
  • Wastage on materials you bought is your loss, not the contractor's
  • Supervision is often absent, which is usually where the saving comes from
  • Rework is billed again, and on a structure rework is the expensive kind

How Avenir works

Avenir does not take labour only grey structure contracts. We build on a material plus labour, turnkey or managed basis, because structural quality depends on controlling procurement, sequencing and supervision together, and we will not be accountable for a structure whose steel and concrete we did not specify and inspect.

If a labour only arrangement is what you want, a local contractor is the right partner for it. If you want one party accountable for the whole structure, that is us.

Buying your own materials can save money if you have time to procure well, somewhere safe to store, and someone competent on site every day. Without all three, the saving usually goes back out in wastage, rework and a programme that runs long.

Defining grey structure

What Is Grey Structure in Pakistan?

Grey structure, also written gray structure, is the structural shell of a house before finishing: foundations, the RCC frame, walls, roof slabs and the services embedded in them. It decides strength, durability and long term repair costs. Finishing can be upgraded later. Structure is expensive to fix, so this stage must be specified correctly.

Foundation & Earthwork

About 18%, roughly PKR 590 per sq ft

Layout, excavation, PCC bed, foundations to the structural drawings, anti termite treatment, damp proof course, and earth filling and compaction to plinth level. Soil decides the foundation type, so this is the package a geotechnical report affects most.

Brickwork, Concrete & Slabs

About 50%, roughly PKR 1,650 per sq ft

RCC columns, beams, roof slabs (lanter) and staircase at 34%, and first class brick masonry, lintels and sun shades at 16%. Steel (sarya), cement, crush (bajri) and shuttering all sit here, which is why steel and cement price moves hit this package hardest.

Plaster, Roof & Services

About 24%, roughly PKR 790 per sq ft

Internal and external plaster with roof insulation and waterproofing at 14%, and underground sewerage, water and gas piping and electrical conduits at 10%. The pipes and conduits are buried at this stage. Wiring and fittings are finishing.

Shares of the grey structure cost at the Lahore Standard rate of PKR 3,300 per sq ft, Q4 2026. The remaining 8%, about PKR 260 per sq ft, is site establishment and full time supervision.

DHA construction

DHA Stage Inspections and What They Do to Grey Structure Cost

DHA construction runs 6% above other societies on grey structure materials, labour and basement. That is a compliance cost and it is measurable. The detail below is from the DHA Construction and Development Regulations 2026, April 2026 edition, for DHA Lahore.

The point most owners miss. Regulation 45 places construction supervision and quality assurance solely on the owner and the architects and engineers they appoint. DHA verifies that what you built matches the drawing it approved. It does not test your concrete, check your steel or grade your workmanship.

So the quality assurance that protects the structure sits in your budget, not DHA's: cube testing, steel checks, level and alignment control, curing discipline and a supervisor who is actually on site. Those are exactly the costs a very low per square foot rate has removed.

Five compulsory verification stages

Regulation 18 requires construction to be verified at five points. Four fall inside grey structure.

  1. Layout complete, before work starts
  2. Main building up to DPC level
  3. First floor structure, 1 ft above the ground floor slab
  4. Post grey structure
  5. Final completion, before occupation

Regulation 29 adds a sixth: boundary walls must be checked at ground level before the main building starts.

What non compliance costs

Regulation 19 lets DHA inspect without notice at any time. If work does not match the approved drawing, DHA can stop the work, disconnect water and sewerage, levy violation charges and order the construction demolished at the owner's cost.

The exposure in DHA is demolition and rebuild, not a fine. That is why the drawing has to be right before anyone digs, and why the labour contractor carries more supervision and rework cost here than elsewhere.

Rules that change quantities

  • Living room ceilings not less than 9 ft 6 in, Regulation 32
  • Plinth 1 ft 6 in to 3 ft 6 in above road crown, up to 5 ft 6 in on 1 Kanal and above, Regulation 28
  • Underground and overhead water tanks, Regulation 36, and a septic tank, Regulation 12
  • Original geotechnical report, valid one year, Regulation 14
  • Excavator permission with a refundable PKR 100,000 security, Regulation 68
  • Building complete within two years of drawing approval, Regulation 17

Source: DHA Construction and Development Regulations 2026, Defence Housing Authority Lahore, edition published 20 April 2026, regulations 12, 14, 17, 18, 19, 28, 29, 32, 36, 45 and 68. DHA Islamabad and Rawalpindi operates under its own instrument, so confirm the equivalents for your phase. DHA amends these regulations from time to time; check the current edition before acting.

Q3 2026 Cost Intelligence

The Anatomy of Construction Costs in Pakistan

A practical guide to current residential construction benchmarks, the forces changing quotations, and how the budget normally divides between structure, services and finishes.

Updated for Lahore and Islamabad/Rawalpindi · July 2026

Current Q3 2026 Cost Benchmarks

Use ranges for initial planning—not one fixed square-foot rate. Structural design, covered area, soil conditions and specifications materially affect the final cost.

Complete Construction

Standard practical finish

PKR 4,400–6,500 per sq. ft.

Indicative range for grey structure plus locally sourced, coordinated standard finishing.

Premium Construction

Higher finish and MEP specification

PKR 6,500–10,000+ per sq. ft.

Imported finishes, bespoke joinery, façade systems and larger MEP loads can move projects above this range.

Market portals reported approximately PKR 2,700–2,850 per sq. ft. for common grey-structure examples and around PKR 4,390–4,520 per sq. ft. for standard complete-house examples in July 2026. Avenir’s broader planning bands allow for specifications and project conditions that basic online calculators may not capture.

How Cost Pressure Has Changed

This index shows relative construction-cost pressure instead of presenting historical quotations as directly comparable fixed rates. The 2020 market is used as the base index of 100.

Why an index is more responsible

Historical square-foot quotations often use different scopes, material qualities and definitions of “complete construction.” The index communicates direction without implying that unrelated quotations are perfectly comparable.

What Is Moving Construction Costs?

Most material changes between an early budget and a contractor’s detailed quotation can be traced to four interconnected factors.

Currency & Imports

Imported sanitaryware, hardware, lighting, HVAC equipment, elevators and specialist finishes remain sensitive to exchange rates and shipping costs.

Energy & Freight

Cement, steel, bricks, glass and transported aggregates all carry embedded power, fuel and logistics costs.

Design Complexity

Basements, long structural spans, double-height spaces, retaining walls, façade projections and difficult sites increase material quantities and labour time.

Finish & MEP Brief

Kitchens, wardrobes, sanitary fittings, tiles, glazing, electrical loads, cooling systems and automation can change finishing costs by several multiples.

Where the Construction Budget Goes

The grey structure cost does not rise as quickly as the finish allowance. As specifications improve, finishing and building services consume a progressively larger share of the total budget.

Controlled specification

Budget-Conscious Build

Local materials, simpler joinery and carefully controlled selections keep structure as the larger cost component.

≈55% Grey structure
≈45% Finishing + MEP

Higher specification

Premium Build

Bespoke interiors, imported items, specialist façades and larger services allowances shift the majority of expenditure to finishes.

≈38% Grey structure
≈62% Finishing + MEP
What is normally included in grey structure?
Excavation, foundations and anti-termite treatment
RCC columns, beams, slabs and structural masonry
Internal and external base plaster
Electrical conduits, boxes and basic embedded services
Water-supply, drainage and sewerage piping
Underground and overhead water tanks where specified
Roof treatment, basic waterproofing and drainage falls
PCC base floors and related structural civil works

Figures are approximate

The displayed rates and allocations are indicative Q3 2026 planning ranges, not a quotation. They assume a conventional above-ground residential project. Basements, abnormal soil, dewatering, retaining structures, piling, authority charges, design fees, utility connections and unusually complex architecture require separate assessment. Contact Avenir for a project-specific BOQ and quotation.

Compare like for like

Check the scope behind the rate.

Two quotes at the same rate per square foot can cover very different work. Tick what yours includes in writing, and the drawing shows what is still open.

Included in writing

Tick what your quote includes to see what is still open.

grey structure cost

FAQs

Standard A‑grade homes often fall between PKR 2,800 and 3,450 per sq ft, depending on drawings, soil investigation results and .

Standard A‑grade homes often fall between PKR 2,650 and 3,400 per sq ft; basement and soil can increase cost.

Scaling up, a 10 Marla house (approx. 3200-3500 sq ft covered area) could see grey structure costs ranging from roughly PKR 8.3 Million to PKR 11.5 Million+ (83 Lacs to 1.15 Crore+) in Lahore during February 2026, subject to specifications.

Often excluded in per‑sq‑ft quotes. Confirm included vs excluded scope in writing before comparing rates.

It usually includes embedded plumbing lines and electrical conduits. Wiring, fixtures and finishing items are separate.

Keep structure practical, plan services early, use BOQ procurement, and reduce rework through supervision and curing discipline.

Yes, Avenir Developments are experts in building grey structures in DHA Lahore and DHA Islamabad. Share your plot location and drawings on WhatsApp for scope confirmation and a BOQ-based estimate.

Foundation, RCC frame, masonry, slabs and embedded services. Optional items must be confirmed separately.

Send plot location, covered area, basement requirement and drawings. BOQ-based estimation is the most accurate.

Grey Structure Cost in Lahore and Islamabad