Cost by plot size
5 Marla house construction cost in Pakistan, Q4 2026
A double storey 5 Marla house in Lahore plans at PKR 13.0 to 15.2 million turnkey at Standard specification in Q4 2026: PKR 5.76 to 6.72 million for the grey structure and PKR 7.26 to 8.47 million for finishing, on a 25 by 45 ft plot of 1,125 sq ft (225 sq ft per Marla) carrying 1,800 to 2,100 sq ft of covered area over the ground floor, first floor and stair mumty, with materials and site labour included.
A single storey house, a basement, a DHA plot, or a plot in Islamabad or Rawalpindi each change the figure. Every case is shown below as a total, with what the figure includes and what it leaves out. A planning estimate, not a quotation.
Design first.Build once.
The answer in numbers
A 5 Marla house in three figures
Grey structure, finishing and the two together, for the house most 5 Marla owners build: two floors and a stair mumty, in Lahore at Standard specification.
Grey structure
5.76 to 6.72PKR million, PKR 3,200 per sq ft
Foundations, RCC frame, masonry, plaster, roof treatment, tanks, and the pipes and conduits cast in.
Finishing
7.26 to 8.47PKR million, PKR 4,030 per sq ft
Floors, kitchen, bathrooms, doors and windows, wiring, second fix plumbing, paint, ceilings.
Turnkey
13.0 to 15.2PKR million, PKR 7,230 per sq ft
Grey structure plus finishing, one contract, one programme. Nothing counted twice.
PKR 7,230 per sq ft of covered area, Lahore, Standard, Q4 2026
The range is the covered area, not the rate: PKR 7,230 per square foot is one figure, and 1,800 to 2,100 sq ft is what a 5 Marla plot usually carries. The rate comes from the construction cost calculator behind every Avenir cost page, so this page, the calculator and the 5 Marla grey structure cost breakdown agree to the rupee.
Six drivers
What moves a 5 Marla construction cost
Six things decide where a 5 Marla house lands between PKR 11.3 to 27.2 million. Specification and covered area do most of the work; city and society the least.
SpecificationEssential to Luxury, Lahore
Covered area1,800 to 2,100 sq ft, Standard, Lahore
StoreysSingle storey to double with mumty
CityLahore to Islamabad and Rawalpindi
SocietyLahore to DHA Islamabad
BasementPer sq ft of basement area, added to the house
Turnkey, PKR million, Q4 2026; double storey with mumty, Standard and Lahore unless the row says otherwise. Each bar is one driver on its own; they compound.
01
Covered area allowed
The byelaws set what the ground floor may cover and what the first floor may repeat, so they fix the covered area before a design exists. On 5 Marla that is usually 1,800 to 2,100 sq ft: PKR 13.0 to 15.2 million at PKR 7,230 per square foot. Every other driver works on that number.
02
Storeys
A single storey on the same plot covers about 800 to 950 sq ft and plans at PKR 5.79 to 6.87 million; a double storey without a mumty about 1,600 to 1,900 sq ft at PKR 11.6 to 13.7 million. The storey table below gives the grey structure share of each.
03
Specification
Essential to Luxury moves the turnkey rate from PKR 6,270 to 12,950 per square foot, PKR 11.3 to 27.2 million on the same house, and almost all of it is finishing: the grey structure rate rises by a third across the tiers, the finishing rate 2.7 times. A 5 Marla budget is decided in the kitchen, the bathrooms and the floors.
04
City
Islamabad and Rawalpindi run PKR 200 per square foot above Lahore on grey structure and again on finishing: PKR 13.7 to 16.0 million for the same Standard house, against PKR 13.0 to 15.2 million in Lahore.
05
Society
A DHA plot in Lahore plans at PKR 13.8 to 16.1 million and one in DHA Islamabad at PKR 14.5 to 17.0 million, because DHA verifies construction against the approved drawing at set stages. LDA, CDA and RDA schemes, Bahria, Lake City and private societies take the city rate.
06
Basement
Priced on its own rate per square foot of basement area, PKR 4,300 at Standard in Lahore against 3,300 above ground, and it adds its whole area to the covered area. Select With Basement in the construction cost calculator.
Your 5 Marla estimate
Price your 5 Marla house, storey by storey
Choose the storeys, the specification, the city and the society. The Q4 2026 rates behind every Avenir cost page, applied to the covered area a 5 Marla plot usually carries, or to your own.
Storey by storey
Single storey, double storey, and a mumty on top
What each option carries on a 25 by 45 ft plot, and what it costs at Standard specification in Lahore, Q4 2026.
Single storey
5.79 to 6.87PKR million turnkey, about 800 to 950 sq ft
Double storey
11.6 to 13.7PKR million turnkey, about 1,600 to 1,900 sq ft
Double storey with mumty
13.0 to 15.2PKR million turnkey, about 1,800 to 2,100 sq ft
| Storeys | Covered area | Grey structure | Turnkey | Time on site |
|---|---|---|---|---|
| Single storey | 800 to 950 sq ft | PKR 2.56 to 3.04 million | PKR 5.79 to 6.87 million | Fixed in the quotation |
| Double storey | 1,600 to 1,900 sq ft | PKR 5.12 to 6.08 million | PKR 11.6 to 13.7 million | 5 to 6 months |
| Double storey with mumty | 1,800 to 2,100 sq ft | PKR 5.76 to 6.72 million | PKR 13.0 to 15.2 million | 5 to 6 months |
Standard, Lahore outside DHA, PKR million, Q4 2026, materials and site labour; grey structure at PKR 3,200 and turnkey at PKR 7,230 per sq ft. A planning estimate, not a quotation.
How the areas are set
The double storey with mumty range is the one every Avenir cost page uses for 5 Marla. A double storey without the mumty is that range less about 175 sq ft, the stair mumty DHA Lahore allows up to 10 Marla; a single storey is about half. Your drawings replace all three with one figure.
Single storey
PKR 5.79 to 6.87 million, of which the grey structure is PKR 2.56 to 3.04 million. The rate per square foot is the same, but the foundations, roof slab and boundary wall are spread over half the area, so the true rate runs higher. Treat it as the floor of the range until the drawings exist.
Double storey
PKR 11.6 to 13.7 million. The second storey changes how the ground floor is built, not only how much: columns, beams and footings carry two floors, and the specification schedule moves from load bearing at Essential to a semi frame at Standard and a full frame at Premium and Luxury. Which applies is settled by the structural calculations and drawings, never by the plot size.
Double storey with mumty
PKR 13.0 to 15.2 million, and 5 to 6 months on site from start to handover. The mumty covers the stair only, adds about 175 sq ft, and gives the roof its access and the overhead tank its base. It is the house most 5 Marla owners build, and the one the rest of this page prices.
Inside the figure
What the 5 Marla figure includes, and what it leaves out
Two quotations at the same rate can cover different work. This is the scope line behind every figure on this page, drawn on the plot.
Inside the grey structure rate
PKR 3,200 per sq ft at Standard, Lahore
- 01The house: excavation, foundations, RCC columns, beams, slabs and stair, brick masonry, lintels, parapets
- Internal and external plaster (ceiling plaster left out where a false ceiling is planned), roof insulation and waterproofing
- Embedded water, gas and sewer pipes, electrical conduits, steel door frames
- 02Porch and external PCC floor
- 03Underground water tank, manholes, drainage lines
- 04Septic tank and soakage, where the authority allows one
Inside the finishing rate
PKR 4,030 per sq ft at Standard, Lahore
- 05Overhead water tank, at the tier's size
- Floors, kitchen, bathrooms, doors, windows, railings, wiring and fittings, paint, ceilings, testing and snagging
Inside an Avenir quotation, measured per item
Set by the plot, not by the covered area
- 06Boundary wall, per running foot, built with the grey structure
- 07Gate columns, built with the wall
Outside the figure
Priced on its own when the design calls for it
- 08The main gate
- 09Driveway, ramp and paving
- 10Lawn, planting and landscape
- 11Solar, UPS and batteries
- Central air conditioning, lifts, pools
- The plot and its charges; authority scrutiny, approval and connection charges; design fees; furniture and appliances; taxes and your contingency
Grey structure plus finishing equals turnkey, nothing counted twice. An Avenir quotation is one figure with the septic tank, the water tanks, the boundary wall, the gate columns and the parapets inside it; the wall is measured per running foot because a 5 Marla plot carries about 140 ft of it whatever the house covers. Compare any other quotation against this line before comparing its rate.
City by city
The same 5 Marla house in Lahore, Islamabad and Rawalpindi
Double storey with mumty, 1,800 to 2,100 sq ft, Standard specification, Q4 2026. Totals, not percentages, for the four rows Avenir builds in.
LahoreOutside DHA
DHA LahoreEvery phase
Islamabad and RawalpindiOutside DHA
DHA IslamabadEvery phase
| Where the plot is | Grey structure | Finishing | Turnkey | Turnkey rate per sq ft |
|---|---|---|---|---|
| Lahore: LDA schemes, Lake City, Bahria, Park View and private societies | PKR 5.76 to 6.72 million | PKR 7.26 to 8.47 million | PKR 13.0 to 15.2 million | PKR 7,230 |
| DHA Lahore, every phase | PKR 6.11 to 7.13 million | PKR 7.69 to 8.97 million | PKR 13.8 to 16.1 million | PKR 7,670 |
| Islamabad and Rawalpindi: CDA sectors, RDA schemes, Bahria, private societies | PKR 6.11 to 7.13 million | PKR 7.60 to 8.87 million | PKR 13.7 to 16.0 million | PKR 7,620 |
| DHA Islamabad and Rawalpindi | PKR 6.48 to 7.56 million | PKR 8.05 to 9.39 million | PKR 14.5 to 17.0 million | PKR 8,070 |
Double storey with mumty, 1,800 to 2,100 sq ft, Standard, PKR million, Q4 2026, materials and site labour; a planning estimate, not a quotation. The chart axis starts at PKR 12 million so the rows read apart: the position of a bar carries the figure, not its length.
Why Islamabad and Rawalpindi cost more
One rate for the twin cities, PKR 200 per square foot above Lahore on grey structure and again on finishing. Much of the Potohar sub-soil is mixed and in places rocky, so excavation is slower and foundations work harder, and finishing materials cost more to land on site.
Why DHA costs more
A compliance cost, not a market premium. DHA verifies construction against the approved drawing at set stages, five in DHA Lahore under Regulation 18, so the on-site adjustment that absorbs cost elsewhere is not available and the drawing has to be right before anyone digs. The figure is shown as a total because that is what you pay.
Which row is yours
LDA schemes, Lake City, Bahria, Park View City and private societies in Lahore take the Lahore row; CDA sectors, RDA schemes, Bahria, Bahria Enclave and private societies in the twin cities take the Islamabad and Rawalpindi row; every DHA phase takes its DHA row. The rates do not apply to Karachi or any other city: Avenir builds in Lahore, Islamabad and Rawalpindi and designs across Pakistan.
What the plot allows
What the byelaws allow on a 5 Marla plot
Covered area drives the budget, and the authority decides the covered area. The two rulebooks Avenir works to most on 5 Marla plots in Lahore, cited to their source, and where the Islamabad rules are.
DHA Lahore
DHA Construction and Development Regulations 2014, Building Control 2026 edition, April 2026, cited to regulation and printed page
- Clear spaces 5 ft front, 3 ft rear, 3 ft side, including the boundary wallRegulation 22(a), printed page 21
- First floor 100 percent of the ground floor on 5 MarlaRegulation 27(a)(3), printed page 24
- Height 39 ft from the crown of the road with mumty and parapet, 32 ft without; no second floorRegulation 23(a), printed page 22
- Stair mumty Up to 175 sq ft on plots up to 10 Marla, stair onlyRegulation 33(a)(1), printed page 27
- Basement Under 100 percent of the allowable covered area, excluding the porch; one levelRegulation 27(a)(1), printed page 24
- Fire alarm Hard-wired, 5 detectors on the ground floor and 6 on the first; the conduits are cast with the grey structureAnnex-C, printed page 46
LDA schemes in Lahore
LDA Building and Zoning Regulations 2019, as amended, cited to clause; the published text carries no printed page numbers
- Ground coverage Up to 75 percent of the plot from 5 Marla to under 10 Marla, about 844 sq ft of 1,125Clause 2.2.3
- Height 38 ft below 10 Marla, crown of the road to the top of the parapetClauses 2.2.2 and 2.2.3
- Rainwater A rainwater storage tank from 5 MarlaClause 5.6.6
- Insulation Wall and roof insulationClause 2.7
- Scheme rules A private scheme approved by LDA applies its own byelaws on top of theseScheme byelaws
In Islamabad, CDA sectors and the private schemes inside the Capital Territory follow the ICT Building Control Regulations 2020, and Rawalpindi outside the cantonments the RDA Building and Zoning Regulations 2020. The parameters for your plot, and the rule that no septic tank is permitted on a CDA plot (clause 4.1.10), are on the CDA and RDA byelaws page. DHA Islamabad works to its own instrument; a DHA Lahore figure does not carry across.
Which authority governs the plot is confirmed before the first sketch: a drawing set that clears one does not clear another, and in DHA Lahore a resubmission restarts the 21 working day scrutiny clock (Regulation 16, printed page 19). Every DHA Lahore figure, cited to its page, is on the DHA Lahore building byelaws page.
From estimate to quotation
How Avenir turns the 5 Marla estimate into one figure
A rate per square foot sets a budget. A price you can hold is measured from drawings. The two routes below are the difference between a headline rate and a final bill.
How the headline rate becomes a bigger bill
The market route
- 1
A rate before the drawings quoted on the plot size and a tier name.
- 2
The exclusions appear after signing: the wall, the tanks, the porch, the plaster a false ceiling was meant to replace.
- 3
Variations on site priced as they arise and reconciled at the end, in the contractor's favour.
- 4
The final bill the headline rate never described.
How a 5 Marla estimate becomes one figure
The Avenir route
- 1
Architectural drawings fix the covered area, the layout and the elevations: the figure stops being a range.
- 2
Structural drawings fix the concrete and the steel from calculations, not from the plot size.
- 3
MEP drawings fix the pipes, conduits, tanks and the fire alarm the authority requires, so none of them arrives as an extra.
- 4
Plot conditions are read on site: soil report, road crown and levels, access for an excavator.
- 5
A bill of quantities is measured from the drawings: every bag of cement, tonne of steel and running foot of wall.
- 6
One figure with the septic tank, water tanks, boundary wall, gate columns and parapets inside it, and the exclusions written beside it.
- 7
On site weekly progress reporting, payments against verified stages, the snag list closed before handover, a one-year defects liability period after it.
GuessMeasure the quantities.
The usual practice, struck through, and Avenir's.
Where a client brings drawings, Avenir prices them as drawn, lists the gaps and clashes in writing, and prices the fix into the quotation rather than into the variations. A marketing estimate, this page included, is never a quotation.
Designed and built
5 Marla houses, designed across Pakistan and built in three cities
Avenir designs 5 Marla houses across Pakistan and builds them in Lahore, Islamabad and Rawalpindi: architecture, structure, MEP, interiors and construction under one roof.
Questions
5 Marla house construction cost: questions owners ask
Every figure matches the tables above: Standard, Lahore outside DHA unless stated, PKR million, Q4 2026.
How much does a single storey 5 Marla house cost to build in Pakistan?
About PKR 5.79 to 6.87 million turnkey at Standard specification in Lahore, Q4 2026, for about 800 to 950 sq ft, of which the grey structure is PKR 2.56 to 3.04 million. The rate is the same PKR 7,230 per square foot as a double storey, so treat it as the floor of the range: foundations, roof slab and boundary wall are spread over half the area.
How much does a double storey 5 Marla house cost to build?
PKR 13.0 to 15.2 million turnkey at Standard specification in Lahore for 1,800 to 2,100 sq ft over two floors and a stair mumty, Q4 2026: PKR 5.76 to 6.72 million for the grey structure and PKR 7.26 to 8.47 million for finishing, materials and site labour included. In Islamabad and Rawalpindi PKR 13.7 to 16.0 million; in DHA Lahore PKR 13.8 to 16.1 million; in DHA Islamabad PKR 14.5 to 17.0 million.
Is a 5 Marla house cheaper to build in Lahore or in Islamabad?
Lahore, by about PKR 0.7 to 0.8 million on a Standard double storey house: PKR 13.0 to 15.2 million against PKR 13.7 to 16.0 million in Islamabad and Rawalpindi. The twin cities run PKR 200 per square foot higher on grey structure and on finishing, for harder sub-soil and higher freight on finishing materials.
How many bricks does a 5 Marla house need?
About 37,000 to 43,000 first class bricks for the grey structure of a 5 Marla house of about 1,950 sq ft, at 19 to 22 bricks per square foot of covered area in the same Q4 2026 cost model; a single storey of about 800 to 950 sq ft about 15,000 to 21,000. The brick quantity calculator counts a wall or the whole house, with the mortar.
What does a basement add to a 5 Marla house?
Its whole area to the covered area, at a higher rate: basement grey works plan at PKR 4,300 per square foot of basement area in Lahore at Standard, 4,560 in DHA Lahore and 4,500 in Islamabad and Rawalpindi, against 3,300 above ground, for the excavation, retaining walls and waterproofing, before its finishing. Select With Basement in the construction cost calculator for your design.
How long does a 5 Marla house take to build?
5 to 6 months on site from start to handover for a double storey house at Standard specification, Avenir's own duration; the grey structure takes about 2 months of that without a basement. Drawings and approval come first: DHA Lahore scrutinises a complete submission in 21 working days (Regulation 16, printed page 19) and a resubmission restarts the count.
Does the figure include the boundary wall and the water tanks?
The underground water tank, the septic tank where the authority allows one and the parapets are inside the grey structure rate; the overhead tank is inside finishing. The boundary wall and gate columns are built with the grey structure and measured per running foot, so they sit inside an Avenir quotation but outside the rate per square foot, because the plot sets their length.
What changes a 5 Marla construction cost the most?
Specification, then covered area. From Essential to Luxury the same house moves from PKR 11.3 to 27.2 million, almost all of it finishing. Covered area moves it next, PKR 13.0 to 15.2 million across the usual range at Standard, and a basement adds to that. City and society move it least: about PKR 1.5 to 1.8 million between Lahore and DHA Islamabad at the same specification.
Next step
Discuss your 5 Marla house with Avenir
Send the society, the storeys and whether you have drawings. Avenir's client relations team replies within one working day; the first consultation is free, and overseas owners can take it on a video call.
Offices in DHA Phase 5, Lahore and Gulberg Greens, Islamabad, Monday to Saturday, 10:00 to 19:00. WhatsApp and calls: +92 300 1101807.