Calculators

Construction calculators that show their working.

Twenty free tools for plot area, building envelope, cost, materials and returns. They work in Marla, Kanal and square feet, and the numbers behind them are published on this page.

20
free calculators
6
parameters published
Q4 2026
last reviewed

Planning a house or a building with Avenir:

12345
Every part of a house has a number. Open the calculator for each one.
  1. 1Plot area1 Kanal is 4,500 sq ft
  2. 2Covered areaEvery built storey
  3. 3Brickwork9 × 4.5 × 3 in brick
  4. 4Concrete1:2:4, dry × 1.54
  5. 5Floor tiles5% added for cuts

All calculators

A calculator for each question a build raises.

Filter by the stage you are at. Each one opens on its own page, free and without sign-up.

Show calculators for

Our working

Every result rests on six numbers. Here they are.

A calculator is only as honest as its assumptions. These are the values Avenir’s plot, cost and quantity calculators use, and the same ones Avenir works to on its own projects.

Choose one to see it drawn, and what it changes. Reviewed Q4 2026.

Choose a parameter
225 sq ft15 × 15 ft272.25 sq ft1 Kanal20 Marla4,500 sq ft
One Marla at 225 sq ft, with the older 272.25 sq ft Marla dashed around it.

Marla and Kanal

225 sq ft

One Marla. One Kanal is 20 Marla, or 4,500 sq ft.

This is the convention DHA and many planned housing schemes use, and Avenir’s calculators start from it. The floor area, parking and feasibility calculators also let you choose 250 or 272.25 sq ft. Land revenue records use the older 272.25 sq ft Marla.

What it changes. On a 10 Marla plot the two main conventions differ by 472.5 sq ft: 2,250 sq ft at 225, and 2,722.5 sq ft at 272.25. Check which one your allotment letter or transfer deed uses.

Used by House construction cost Grey structure cost Floor area ratio Brick quantity

MumtyFirstCantileverGroundBasement
Section through a house. Shaded floors are counted in covered area.

Covered area

Every storey

What a rate per square foot is multiplied by.

Covered area is the floor space enclosed by the outer walls and roof on every built storey: basement, ground, first and second floors and the mumty, including cantilevered projections. It is not the plot area.

What it changes. A lower rate quoted against a narrower definition does not make a cheaper house. Ask what any quoted rate counts before you compare it.

Used by House construction cost Grey structure cost

10 mm joint9 in4.5 in3 inFace with joint: 9.4 × 3.4 inEnd
The standard brick and its end, with the 10 mm joint dashed around the face.

Brick and joint

9 × 4.5 × 3 in

Standard brick, laid with a 10 mm mortar joint.

The brick quantity calculator works on the standard 9 by 4.5 by 3 inch brick with a 10 mm joint, and a 1:6 cement and sand mortar by default.

What it changes. With its joint, each brick takes up about 9.4 by 3.4 inches of wall face. Kiln sizes vary, and a smaller brick means more bricks in the same wall, so enter your supplier’s size if it differs.

Used by Brick quantity

Mortar in the wall1 cu ftDry cement and sand, 1:6Sand 1.14Cement 0.19 cu ft1.33
1 cu ft of mortar in the wall, and the 1.33 cu ft of dry cement and sand it takes.

Mortar

× 1.33

Dry volume of cement and sand, against mortar in the wall.

Cement and sand lose volume once they are mixed with water, so the dry materials for a mortar are 1.33 times its volume in the wall.

What it changes. 1 cu ft of mortar in the wall needs 1.33 cu ft of dry materials. At 1:6 that is 0.19 cu ft of cement and 1.14 cu ft of sand.

Used by Brick quantity

Concrete as poured100 cu ftDry materials, 1:2:4: 154 cu ftSand 44Crush 88Cement 22 cu ft, 17.6 bags
100 cu ft of concrete as poured, and the 154 cu ft of dry materials in a 1:2:4 mix.

Concrete

× 1.54

Dry volume of cement, sand and crush, against concrete as poured.

Concrete is measured wet, as poured. The cement, sand and crush it needs are 1.54 times that volume. A 50 kg cement bag is taken as 1.25 cu ft, and the default mix is 1:2:4.

What it changes. 100 cu ft of 1:2:4 concrete needs 154 cu ft of dry materials: 22 cu ft of cement, which is 17.6 bags, 44 cu ft of sand and 88 cu ft of crush.

Used by Concrete volume Brick quantity

Straight: 5%Diagonal: 10%
The same room tiled straight and diagonally. Shaded tiles are cut.

Wastage

5%

Added to every quantity for cutting and breakage.

5% is added to bricks, blocks and straight-laid tiles. Marble, diagonal and herringbone patterns and irregular rooms take 10%, because more pieces are cut.

What it changes. 1,000 sq ft of floor needs 1,050 sq ft of tiles laid straight, or 1,100 sq ft laid diagonally.

Used by Brick quantity Tile

Planning values for calculation. On a real building, the concrete mix, cover and reinforcement follow its structural drawings.

Next step

What were you working out?

Pick the closest. Your WhatsApp message will say so, and the team will start from there.

What were you working out?
Discuss My Project on WhatsApp Discuss My Plot on WhatsApp Discuss My Budget on WhatsApp Discuss My Build on WhatsApp Discuss My Scheme on WhatsApp

Answered by Avenir’s client relations team within one working day.

Reading a result

Two calculators, two answers. Usually for one of four reasons.

A result is worked from what you enter and what the tool assumes. When two figures disagree, check these before deciding either one is wrong.

  • A different Marla

    225 sq ft in DHA and many planned schemes, 272.25 sq ft in revenue records. On a 10 Marla plot that is 472.5 sq ft apart.

  • A different covered area

    Some figures leave out the basement, the mumty or the cantilevers. Avenir counts every built storey.

  • A different scope

    Grey structure, finishing and a complete house are different prices for the same building.

  • A different quarter

    Material and labour rates move. A figure without its date cannot be compared with one that has it.

A quantity is an ordering guide and a cost is a planning estimate. A price you can sign against comes from drawings and a bill of quantities measured from them.

This quarter’s construction rates, and what they include

Design and build

The calculators follow the work Avenir does.

Each set of tools sits on a stage Avenir carries out for clients, from the first plot study to the finished rooms.

  • Your plot and what it allowsLand area, floor area ratio, parking

    Architecture

    Plot studies, design to the byelaws and submission drawings. Explore architecture
  • Construction costHouse construction cost, grey structure

    Design + Build

    One team from the first drawing to handover, priced from drawings and a bill of quantities. Explore Design + Build
  • Material quantitiesBricks, concrete

    Construction

    Grey structure to turnkey, material and labour, in Lahore, Islamabad and Rawalpindi. Explore construction
  • Design, comfort and climateStaircase, windows to wall, AC tonnage, lighting

    Integrated building design

    Structure, MEP, HVAC and fire protection, coordinated with the architecture. Explore integrated building design
  • FinishesTiles, paint, false ceilings

    Interior design

    Whole houses, apartments and commercial spaces, from layout to the schedule of finishes. Explore interior design
  • Investment and developmentRental yield, feasibility

    Project consultancy

    Feasibility and development advice for apartment and mixed‑use schemes. Explore project consultancy

Questions

Questions about these calculators

Are these calculators free to use?

Yes. Every calculator on this page is free, needs no sign-up and runs in your browser.

Which Marla size do the calculators use?

225 sq ft, so one Kanal is 4,500 sq ft. That is the convention DHA and many planned housing schemes use. Land revenue records use an older Marla of 272.25 sq ft, which makes a 10 Marla plot 2,722.5 sq ft instead of 2,250. The floor area, parking and feasibility calculators let you switch to 250 or 272.25 sq ft.

How much wastage should I add when ordering materials?

5% for bricks, blocks and straight-laid tiles. 10% for marble, diagonal and herringbone patterns and irregular rooms, because more pieces are cut.

Can I order materials straight from these quantities?

For one room or one wall, yes, with the wastage allowance added. For a whole house, treat the result as a check on a take-off measured from the drawings, which accounts for openings, junctions and levels a calculator cannot see.

Why does my contractor’s figure differ from the calculator’s?

Usually because of one of four things: a different Marla, a different definition of covered area, a different scope (grey structure, finishing or a complete house) or rates from a different quarter. Ask which applies before deciding either figure is wrong.

What is the difference between covered area, gross floor area and floor area ratio?

Floor area ratio is the total floor area a plot may carry, divided by the plot area. Gross floor area is the total floor area of all storeys. Covered area, as Avenir measures it for a construction rate, is the floor space enclosed by the outer walls and roof on every built storey, including the basement, mumty and cantilevered projections. Each authority sets its own rules on which spaces count towards its limits, so check the byelaws for your plot.

Do the calculators work outside Lahore and Islamabad?

The unit, quantity and design calculators work anywhere in Pakistan. The construction cost calculators use rates for Lahore and Islamabad or Rawalpindi only, where Avenir builds. Avenir designs houses and buildings across Pakistan.

What does Avenir need before it can give me a quotation?

Architectural, structural and MEP drawings, the plot conditions and a bill of quantities measured from the drawings. If you do not have drawings yet, design is the place to start.

How often are the parameters reviewed?

Every quarter, alongside the construction rates. They were last reviewed in Q4 2026.

A price for your project

From a planning figure to a price you can build to.

Send your plot size, society and what you plan to build. The team will set out the next step, starting with a free first consultation.

Discuss My Project on WhatsApp

Replies within one working day.

2 Kanal Modern House, DHA Phase 8, Lahore
Plot
2 Kanal
Covered area
9,500 sq ft
Scope
Design + Build

About Avenir

Designed to be built.

Avenir Developments is an architecture, interior design and construction firm. It designs across Pakistan and builds in Lahore, Islamabad and Rawalpindi, from offices in DHA Phase 5, Lahore and Gulberg Greens, Islamabad.

These calculators use the parameters Avenir works to on its own projects, reviewed every quarter.

If a result looks wrong, email email@avenirdevelopments.com with the calculator’s name and what you entered, so the team can check it.