House Construction Cost in Pakistan: Rates Per Square Foot for Lahore and Islamabad

Use the house construction cost calculator below for a planning estimate on your own covered area, or read the published rates for grey structure, finishing and a complete turnkey house. Every figure on this page is produced by the same construction cost calculator, so nothing here disagrees with the tool.

Complete house · Lahore — PKR 6,500 to 13,450 — Per sq ft, Essential to Luxury, grey structure plus finishing

Grey structure · Lahore — PKR 3,000 to 4,000 — Per sq ft, Essential to Luxury, materials and labour

Finishing · Lahore — PKR 3,500 to 9,450 — Per sq ft, Essential to Luxury, materials and labour

Rates reviewed Q4 2026. Lahore, Islamabad and Rawalpindi.

House Construction Cost in Pakistan by Avenir Developments

House Construction Cost Calculator

Plan Your Construction Budget

A planning estimate for Lahore and Islamabad / Rawalpindi, based on covered area, specification, design complexity, basement and the society or authority you are building in. Results update as you change the inputs.

Rates reviewed: Q4 2026 Material and labour · Lahore and Islamabad / Rawalpindi
Estimate Type

Complete House combines grey structure with the selected finishing specification.

Your Planning Estimate

10% total planning band

Estimated Complete House Budget

PKR 2.23 Cr

PKR 22,280,000

Likely Planning Range PKR 2.12–2.34 Cr
Effective RatePKR 7,430 / sq ft
Covered Area3,000 sq ft
SpecificationStandard
LocationLahore

Construction Cost Breakdown

Structure, above groundPKR 98.0 Lakh
Finishing, final MEP and fixturesPKR 1.25 Cr

The central figure is the primary planning estimate. The displayed low to high range is deliberately limited to 10% around that estimate, at plus or minus 5%, for more useful early-stage budgeting.

Indicative estimate only. This is a planning estimate, not a construction quotation, and Avenir is not bound to undertake a project at these rates. The planning band is an early-stage allowance, not a guaranteed final-price variance. Actual cost depends on architectural and structural design, soil conditions, water table, structural spans, floor heights, society requirements, selected brands, quantities, procurement timing, programme length, site access and market movement. Contact Avenir for a project-specific quotation.

Construction rates per square foot

A complete house at Standard specification plans at PKR 7,500 per square foot of covered area in Lahore and PKR 7,900 in Islamabad and Rawalpindi. Grey structure alone is PKR 3,300 in Lahore and PKR 3,500 in Islamabad. All figures cover materials and site labour. Rates reviewed Q4 2026.

The construction cost calculator above applies these rates to your own covered area. Tables below are at 1 Kanal as the reference plot. Smaller plots run slightly below and 2 Kanal slightly above, because structural spans and section sizes change with the building. The plot-size adjustment is published in the next section and the calculator applies it automatically.

Complete house, grey structure plus finishing

PKR per square foot of covered area. Rates reviewed Q4 2026. Planning band plus or minus 5%.
LocationEssentialStandardPremiumLuxury
DHA Lahore6,8907,95010,60014,260
DHA Islamabad7,3108,37011,02014,680
Lahore6,5007,50010,00013,450
Islamabad6,9007,90010,40013,850

Grey structure, above ground

PKR per square foot of covered area. Planning band plus or minus 4%. Basement is priced separately below.
LocationEssentialStandardPremiumLuxury
DHA Lahore3,1803,5003,9204,240
DHA Islamabad3,3903,7104,1304,450
Lahore3,0003,3003,7004,000
Islamabad3,2003,5003,9004,200

Finishing

PKR per square foot of covered area. Planning band plus or minus 6%. Finishing is 56% of a complete house at Standard.
LocationEssentialStandardPremiumLuxury
DHA Lahore3,7104,4506,68010,020
DHA Islamabad3,9204,6606,89010,230
Lahore3,5004,2006,3009,450
Islamabad3,7004,4006,5009,650

Basement grey works, per square foot of basement area

Basement is priced on its own rate, not as a multiple of the above-ground rate. Retaining wall, excavation, waterproofing and ventilation drive it.
LocationEssentialStandardPremiumLuxury
DHA Lahore4,2404,5604,7704,980
DHA Islamabad4,4504,7704,9805,190
Lahore4,0004,3004,5004,700
Islamabad4,2004,5004,7004,900

Cost by plot size, with build times

Construction cost for a 5 Marla, 8 Marla, 10 Marla, 1 Kanal and 2 Kanal house, at Standard specification in Lahore outside DHA. Covered area is what drives the cost, so each card shows a typical range and the figures at both ends. Build times are Avenir's own durations from site start to handover.

  • 5 Marla

    1,800 to 2,100 sq ft covered
    RatePKR 7,230per sq ft
    Grey structure57.6 to 67.2 LakhPKR
    Complete house1.30 to 1.52 CrPKR
    Build time5 to 6 monthssite start to handover
  • 8 Marla

    2,600 to 3,000 sq ft covered
    RatePKR 7,350per sq ft
    Grey structure84.1 to 97.0 LakhPKR
    Complete house1.91 to 2.21 CrPKR
    Build time6 to 7 monthssite start to handover
  • 10 Marla

    3,000 to 3,400 sq ft covered
    RatePKR 7,430per sq ft
    Grey structure98.0 Lakh to 1.11 CrPKR
    Complete house2.23 to 2.52 CrPKR
    Build time6 to 7 monthssite start to handover
  • 1 Kanal

    5,500 to 6,300 sq ft covered
    RatePKR 7,500per sq ft
    Grey structure1.82 to 2.08 CrPKR
    Complete house4.13 to 4.73 CrPKR
    Build time11 to 12 monthssite start to handover
  • 2 Kanal

    10,000 to 11,500 sq ft covered
    RatePKR 7,840per sq ft
    Grey structure3.43 to 3.95 CrPKR
    Complete house7.84 to 9.02 CrPKR
    Build time15 to 16 monthssite start to handover

Construction cost per Marla of plot

Standard specification, Lahore, complete house, using the covered area ranges above. One Marla is taken as 225 sq ft.
PlotPer Marla of plotRate adjustment applied
5 MarlaPKR 26.0 to 30.4 LakhGrey 0.97, finishing 0.96
8 MarlaPKR 23.9 to 27.6 LakhGrey 0.98, finishing 0.98
10 MarlaPKR 22.3 to 25.2 LakhGrey 0.99, finishing 0.99
1 KanalPKR 20.6 to 23.6 LakhReference, 1.00
2 KanalPKR 19.6 to 22.5 LakhGrey 1.04, finishing 1.05

Cost per Marla falls as the plot gets bigger, even though the rate per square foot rises. Larger plots are covered less densely, so there is less built area per Marla of land. If someone quotes you a flat per Marla figure without asking your covered area, that is the assumption they have hidden.

Next step

Turn the estimate into a quotation.

A rate per square foot is a planning range. A construction price you can hold comes from approved drawings and a bill of quantities. Tell us where you are and we start from there.

What do you have so far?

Tap where you are to see what comes next.

Construction Cost Scope

Grey Structure vs Turnkey Construction

While turnkey construction offers a move-in-ready experience, the grey structure represents the actual “bones” of your house construction cost. This stage is where you lock in the long-term integrity of your home—specifically regarding structural safety, crack control, and seepage resistance. In the Pakistani market, building “smart” means allocating a significant portion of your budget to high-quality grey structure works. Whether you choose a labor-rate contract or a full package, remember that every finishing material—from premium Italian tiles to custom woodwork—is only as durable as the skeleton supporting it. Skimping on the grey structure to save on the initial cost per square foot often leads to exponential repair expenses later due to dampness and settlement issues.

Structural Shell

What Is Grey Structure Construction

Grey structure construction is the structural “skeleton” of your home.

  • Setting out, excavation, backfilling, anti-termite where applicable, PCC and foundations.
  • RCC structure: columns, beams, slabs, staircase RCC and lintels with reinforcement steel.
  • Brickwork / blockwork and parapet walls.
  • Roof slab and basic plaster / rough finishes.
  • Underground water tank, septic / soakage where applicable, manholes and basic drainage lines.
  • Conduits and sleeves for electrical and plumbing as per drawings.
Clarify in Writing

What’s Usually Not Included Unless Specified

Luxury projects include add-ons which impact the construction cost.

  • Solar system, UPS / inverter systems, batteries and major electrical backup equipment.
  • Central HVAC ducting, VRF systems and chillers depending on design.
  • Imported premium fittings beyond agreed package, including tiles, sanitary and kitchen hardware.
  • Landscape works, swimming pools and boundary walls, often as separate scope.
  • Elevators where applicable and specialized automation beyond basic smart wiring.

Important: Always confirm whether a quote is for grey structure, finishing, turnkey construction or a customized scope before comparing rates.

House construction cost

Why Avenir Developments is the Best House Construction Company in Lahore and Islamabad

Avenir Developments stands out as one of the top choices for house construction in Lahore and Islamabad. Where most firms compete on the lowest headline rate, we compete on the final cost you actually pay — and the value behind it. Here is what that means for your project and your budget.

20+ years of expertise

Decades of experience in residential construction, specialising in custom homes and premium designs tailored to your needs.

Transparent pricing

Clear, detailed quotes and our construction cost calculator give you an upfront understanding of your budget, with no surprises along the way.

High-quality construction

Skilled labour and top-quality materials, so your home is not only beautiful but built to last.

Customer-centric approach

One team working closely with you across the entire construction process, from the first call to handover.

On-time & on-budget

Completed on schedule and within budget, whatever the scale of the project.

Quoted price vs. final price: where the difference comes from

Those five commitments are easy to claim. Here is how each one shows up in practice — and where it protects your final construction cost, from grey structure through to turnkey finishing, against the patterns that quietly inflate the bill elsewhere in the market.

Not every contractor works this way. But these habits are common enough that they belong in every plot owner’s due diligence before accepting a per-square-foot rate.

How Avenir Developments protects your final house construction cost compared with common market practice in Pakistan.
On this cost factor Avenir Developments Your final cost, protected The typical market How the final bill grows
How your price is quoted
A BOQ-based estimate tied to your drawings, specifications and covered area — an itemised cost per square foot you can actually check, line by line.
One vague per-sq-ft or lump-sum figure with undefined scope. You cannot tell what is included until the money starts running out.
The “cheapest quote” trap
Reality-based ranges built on current cement, steel and labour rates. We will not anchor you to a number the market cannot actually deliver.
A deliberately low rate to win the job, recovered later through change orders. The cheapest quote routinely becomes the most expensive house.
What your per-sq-ft rate includes
A clear line drawn between grey structure, finishing and turnkey scope, so you know exactly what your rate covers before you sign.
“Turnkey” that quietly excludes big cost heads — boundary wall, external works, solar, HVAC — that reappear as priced extras mid-project.
Hidden cost heads
Boundary wall, basement excavation and waterproofing, external development, approval fees, taxes and material lab tests are in the budget from day one.
The budget stops at the front door. The “extras” — most of which were always required — surface only once you are committed.
Material specification vs substitution
Every brand and grade documented — 60-grade steel, named cement, tile and sanitary grade — with at least two comparable quotes on major packages and a zero-kickback policy.
Premium materials quoted, cheaper substitutes installed, and the difference pocketed. You pay an A-category rate for B-category work.
Changes & scope creep
Every variation priced for its cost and time impact and approved by you in writing before work continues — no surprises on the final bill.
Verbal changes on site with no paper trail, reconciled at the end of the project — almost always in the contractor’s favour.
Approvals, byelaws & fines
Drawings detailed to DHA, LDA, CDA and RDA and society byelaws — setbacks, height and covered-area limits — so you avoid rejections, forced redesigns and society fines.
Elevation-first drawings that hit approval problems late; plan revisions and authority penalties get added to your cost after work has begun.
Quality — buy cheap, buy twice
Stage sign-offs for structure, waterproofing, MEP and finishes — seepage and settlement issues are caught before they are buried and expensive.
Inspection is ad-hoc. Defects surface after handover, when a repair costs several times what prevention would have.

Let's Start Your House Construction Project

House Construction Cost is a tricky topic, and you can easily be confused. We believe in transparent pricing with no hidden costs. Our scope of work is clear from the very begining so that you make informed decisions.

What each specification tier contains

Four tiers run across this page, the calculator and every cost guide on the site. Each is defined by named materials, because "premium" means nothing until someone writes down the steel grade and the tile band. Rates sit in the tables above and nowhere else, so they cannot drift apart.

Tables scroll sideways on a phone.

Grey structure: materials and structural system
ItemEssentialStandardPremiumLuxury
Bricks and blocks1st class1st class1st class1st class
SandLocalRiverRiver RaviRiver Chenab
CrushJhelumDinaMargallaMargalla
SteelGrade 40Grade 60Grade 60Grade 60
CementGood qualityBestway or equivalentBestway or equivalentBestway or equivalent
Structure designLoad bearingSemi frame structureFully frame structureFully frame structure
Excavation2.5 ft2.5 ft2.5 ft2.5 ft
Earth filling3 ft3 ft3 ft3 ft
DPC1 inch thick2 inch thick2 x 2 inch thick2 x 2 inch thick
Door framesJisti, 16 gaugeJisti, 14 gaugePer finishing tierPer finishing tier
Joinery, windows and railings
ItemEssentialStandardPremiumLuxury
Door frameJisti, 16 gaugeYellow pineAsh, mahogany or supaliDeodar
DoorChina plyMalaysian ply, ash main doorAsh, mahogany or supaliDeodar
Window1.3 mm aluminium, 5 mm glass, fly mesh1.5 mm aluminium, 5 mm glass, fly meshAluminium or UPVC, heat, dust and sound proof, Turkish profileAluminium or UPVC, heat, dust and sound proof, Turkish profile
Stair railingBrick masonryStainless steelWood, glass or CNCWood, glass or CNC
WardrobeNot includedNot includedAvailableAvailable
Kitchen and bathrooms
ItemEssentialStandardPremiumLuxury
Kitchen cabinetMDFMDFFully furnished Italian kitchenDesigner kitchen
Kitchen shelfSunny grey marbleJet black marbleFully furnished Italian kitchenFully furnished Italian kitchen
Washroom tilesNot includedMaster or equivalentImported up to 3000 per sq mImported up to 5000 per sq m
Washroom fittingsGood qualityMaster or TotalFaisal or equivalentImported
Washroom seatsGood qualityMaster or TotalPorta, 2 piecesGrohe
Floors, walls and ceilings
ItemEssentialStandardPremiumLuxury
FloorPCCSunny grey or tippiImported up to 5000 per sq mImported up to 7000 per sq m
PaintGood qualityMaster, Diamond or BrightoICI or JotunICI or Jotun
CeilingNot includedBorder and golaFull ceiling, POPFull ceiling, POP and wooden
Specialised paintworkNot included2 feature walls4 feature walls6 feature walls
Media wallsNot includedNot included12
Electrical, plumbing and water
ItemEssentialStandardPremiumLuxury
Switches and socketsLocalChinaImportedImported smart
Electric wireGood qualityGM or FastPakistan CablePakistan Cable
Electric fanLocal A qualityLocal A qualityLocal A+ quality brandLocal inverter based
UPS wiringNot includedAvailableAvailableAvailable
Sanitary and electric pipeGood qualityGM or PlascoPopular or BetaDadex
Water tank500 litreDura 750 litreDura 1200 litreDura 2000 litre
Water pumpNot includedNot includedBore up to 220 feetBore up to 220 feet
Gas pointsNot includedGF kitchenGF kitchen and loungeGF kitchen, lounge and FF kitchen
Comfort, protection and security
ItemEssentialStandardPremiumLuxury
Weather insulationNot includedNot includedThermopore insulation at slabThermopore insulation at slab
Water proofingNot includedNot includedSpecial Japanese coating at roofSpecial Japanese coating at roof
CCTVNot includedNot includedAvailableAvailable
Security fencingNot includedNot includedAvailableAvailable

Excavation and earth filling depths are typical allowances. Actual depths follow the structural design and site conditions, set by the geotechnical report and the structural engineer, not by a specification tier. Named brands indicate the grade and price band a tier is costed at. Where a brand is unavailable at procurement, an equivalent of the same grade is substituted and recorded in writing before installation. Ask for that substitution rule in your contract, whoever you build with.

CONSTRUCTION COST GUIDES

Grey Structure and Finishing Costs, Package by Package

Construction cost splits into two stages. Grey structure is the shell you cannot change later. Finishing is where most of the money and nearly all of the decisions sit. Each guide covers current rates, what moves them, and the mistakes that cost money.

Construction cost guides

Grey Structure and Finishing Costs, Package by Package

Construction splits into two stages. Grey structure is the shell you cannot change later. Finishing is where most of the money sits. Each guide covers current rates and what moves them.

Grey structure 44%
Finishing 56%

At Standard specification in Lahore. The split surprises people who assume the structure is the expensive part.

The shell

Built once, changed never

Grey Structure Cost

Foundations, RCC frame, masonry and roof slab. The stage that governs crack control, seepage and settlement, and the one you cannot revisit once it is buried.

Grey structure cost in Pakistan
Lahore, per sq ft PKR 3,000 to 4,000 Essential to Luxury, materials and labour. Rates reviewed Q4 2026.

The fit-out

In build sequence

Scope

Pick the scope you are pricing.

The scope decides the price more than the plot size does. Tap one to see which parts of the house it covers.

Scope

Building section, illustrative

House construction cost in Pakistan: FAQs

Every figure matches the calculator above. Standard specification at typical design complexity unless stated, per square foot of covered area, rates reviewed Q4 2026.

How accurate is this construction cost calculator?

The house construction cost calculator on this page is built on Avenir's own planning rates for current work in Lahore, Islamabad and Rawalpindi, reviewed quarterly. It accounts for city, society or authority, plot size, covered area, basement, design complexity and specification tier, which is more than most published tools consider.

It is a planning tool, not a quotation. It cannot know your soil, your structural spans, your floor heights or your society's requirements, and those move real costs. Treat the output as a budget to start from, then get a BOQ-based quotation against drawings before you commit.

What is the construction cost per square foot in Pakistan?

In Lahore a complete house plans at PKR 6,500 per square foot at Essential specification, 7,500 at Standard, 10,000 at Premium and 13,450 at Luxury. In Islamabad and Rawalpindi the same tiers plan at 6,900, 7,900, 10,400 and 13,850.

Those figures cover materials and site labour for grey structure plus finishing. They exclude professional fees, approvals, utility connections, external works, taxes and your own contingency.

What is the grey structure rate per sq ft in Lahore?

Grey structure in Lahore plans at PKR 3,000 per square foot at Essential, 3,300 at Standard, 3,700 at Premium and 4,000 at Luxury, covering materials and site labour. In DHA Lahore add about 6%, giving 3,180 to 4,240.

Grey structure varies far less across tiers than finishing does, because the structural system, steel grade and cement account for most of it. Detail on the grey structure cost page.

What is the turnkey construction cost per sq ft in Lahore?

Turnkey, meaning a complete house with grey structure and finishing under one contract, plans at PKR 7,500 per square foot at Standard specification in Lahore, and 7,950 in DHA Lahore. Essential is 6,500, Premium 10,000 and Luxury 13,450.

Always confirm in writing whether a quotation is for grey structure, finishing or a complete house before comparing it with anything else.

What is the turnkey construction cost per sq ft in Islamabad?

A complete house at Standard specification plans at PKR 7,900 per square foot in Islamabad and Rawalpindi, and 8,370 in DHA Islamabad. Essential is 6,900, Premium 10,400 and Luxury 13,850.

Islamabad runs above Lahore because the Potohar sub-soil carries boulder and rock beds that Lahore's alluvium does not, which raises excavation and foundation cost, and because freight on finishing materials into the north is higher.

How much does it cost to build a 5 Marla house in Lahore?

At 1,800 to 2,100 sq ft of covered area at Standard specification, grey structure plans at PKR 57.6 to 67.2 Lakh and a complete house at PKR 1.30 to 1.52 Crore. The rate is about 7,230 per square foot. In DHA Lahore the complete house plans at 1.38 to 1.61 Crore. Typical build time is 5 to 6 months.

Covered area is the assumption doing the work here. Enter your own figure in the calculator above.

How much does it cost to build a 10 Marla house in Lahore?

At 3,000 to 3,400 sq ft of covered area at Standard specification, grey structure plans at PKR 98.0 Lakh to 1.11 Crore and a complete house at PKR 2.23 to 2.52 Crore, at about 7,430 per square foot. In DHA Lahore the complete house plans at 2.36 to 2.68 Crore. Typical build time is 6 to 7 months.

How much does it cost to build a 1 Kanal house in Lahore or Islamabad?

At 5,500 to 6,300 sq ft of covered area at Standard specification, grey structure plans at PKR 1.82 to 2.08 Crore and a complete house at PKR 4.13 to 4.73 Crore in Lahore, at 7,500 per square foot. In DHA Lahore that becomes 4.37 to 5.01 Crore. Typical build time is 11 to 12 months.

On a 1 Kanal plot the specification tier moves the budget far more than the plot does. At Luxury the same covered area plans at roughly 7.40 to 8.47 Crore in Lahore.

What is the 1 Kanal construction cost in Islamabad with basement?

A basement is priced on its own rate per square foot of basement area, PKR 4,500 at Standard in Islamabad against 3,500 for the structure above ground. That difference, about 1,000 per square foot, is what the basement adds on top of what the area would have cost anyway.

On a 1 Kanal house with 5,500 sq ft covered including a 2,000 sq ft basement at Standard specification in Islamabad, the basement adds roughly 20 Lakh over the same house without one. Select With Basement in the calculator and enter your basement area for a figure matched to your design.

Do these rates apply to Karachi?

No. The rates on this page are for Lahore, Islamabad and Rawalpindi only, and the calculator offers those two markets. Karachi differs on sub-soil, aggregate sources, freight and labour rates, so applying a Lahore rate there would mislead you.

Avenir builds in Lahore, Islamabad and Rawalpindi. Architecture, interior design and project consultancy are available across Pakistan, Karachi included, so if you need drawings rather than construction we can help. For construction in Karachi you will want a local contractor, and the eight questions in our quotation checklist apply just as well there.

What is the lanter or RCC roof slab cost per square foot?

There is no reliable standalone lanter rate, and any figure quoted without a structural drawing is a guess. Slab cost is set by span length, slab thickness, one way against two way action, beam depth and column grid, all of which decide the steel quantity before any market rate is applied.

What we can tell you is that grey structure at Standard specification in Lahore plans at PKR 3,300 per square foot of covered area, and the RCC frame including the roof slab is the dominant share of it. If someone offers a lanter rate before seeing a structural drawing, ask what span and steel quantity it assumes.

Grey structure with material or labour only, which is better?

The figures on this page are material and labour, which is how Avenir works. One contractor is accountable for both procurement and workmanship, so a material failure and a workmanship failure cannot be blamed on each other.

Labour only contracting can work if you have the time to run procurement yourself, storage on site, and someone competent checking every delivery against the specification. Most plot owners, and almost all overseas owners, do not. Avenir does not take labour only contracts.

What is included in a turnkey construction package in Pakistan?

Grey structure and finishing at the same specification, under one contract and one programme. Grey structure covers excavation and foundations, the RCC frame, masonry, roof slab and base plaster, underground tank and drainage, and conduits for services. Finishing covers floors, wall finishes and paint, kitchen, bathrooms, electrical and plumbing second fix, woodwork, and testing and snagging.

It does not normally include professional fees, approvals, utility connections, boundary wall and external development, solar, central HVAC, lifts, pools, taxes or contingency. Confirm those in writing before you sign.

Why does building in DHA cost more?

About 6% more on grey structure, basement and finishing. DHA Regulation 18 requires five compulsory stage inspections, and construction has to match the approved drawing at each one, which removes the on-site adjustment that absorbs cost elsewhere. Annex-C mandates a hard wired fire alarm system with detector counts set by plot size, and Regulation 66 makes CCTV compulsory with ten days of footage retained.

Select DHA in the calculator and the adder is applied automatically.

Are these rates a quotation?

No. They are indicative planning rates, published so plot owners can budget realistically, and Avenir is not bound to undertake a project at them. A price we can stand behind depends on your drawings, specification, site conditions, programme and the supervision the project needs.

How can I get a construction quotation for my house in DHA Lahore or Bahria Town?

Send us the plot size and society, your target covered area, whether you want a basement, and the specification tier you have in mind. That is enough for a considered planning discussion on WhatsApp.

A firm quotation needs architectural drawings, a structural design and a specification, because until those exist any number is a range. If you do not have drawings yet, that is where to start, and it is a service we provide. See architecture services and construction services.

Location

Tell us where you are building.

Rates differ between Lahore and Islamabad or Rawalpindi, and between societies. We build in both and design across Pakistan.

Where is the plot?
PeshawarIslamabadRawalpindiLahoreFaisalabadMultanQuettaHyderabadKarachi N Schematic, not to scale

We build in Lahore, Islamabad and Rawalpindi, and design across Pakistan.

CONTACT US FOR HOUSE CONSTRUCTION COST

Get My Construction Cost Estimate

Ready to build in Lahore or Islamabad/Rawalpindi? Get a realistic estimate before you commit. Share your plot details and preferred finish level. We respond within one business day. WhatsApp us to book a free consultation.